Practice exam
This practice exam draws 60 questions from a 60-question bank covering all 12 lessons, with each of the 6 topic areas represented in proportion to its share of the bank: general and building blocks, accessible route and circulation, toilet and bathing rooms, kitchens and communication, Accessible and Type A units, and Type B units and standard comparisons. Question order and answer order are shuffled every time you sit it.
This is GCHS practice, not an official test. It checks what you have retained from the lessons, based on the 2017 ICC A117.1 with Supplement 1. Treat it as open book if you like: on an actual project you will have the adopted building code and the applicable A117.1 edition in hand, and knowing where to look matters as much as memorized numbers. A117.1 only applies through the building code that adopts it, so always confirm which edition and which other standards, such as the ADA Standards, TAS, or UFAS, also apply to a given project.
Review