ICC A117.1 100%

A117.1 Chapters 1-2

Lesson 1: What A117.1 is and how codes reference it

A117.1 Chapters 1-2 · 14 practice questions

0:00 / --:--

Reading

This course covers ICC A117.1, the technical standard titled "Accessible and Usable Buildings and Facilities." A117.1 is different from the two standards already covered elsewhere in GCHS accessibility training, TAS and UFAS, and different from the ADA Standards for Accessible Design that GCHS staff already use daily. This lesson lays out what A117.1 actually is, how it becomes enforceable on a project, which edition applies, and the ground rule this whole course follows around A117.1's copyright.

A standard, not a code

A117.1 has no legal force by itself. It is a referenced standard: a building code, such as the International Building Code, adopts A117.1 by naming it, and the code is what actually requires accessible construction. The code answers the scoping question, which buildings and which elements within them must be accessible, and A117.1 answers the technical question, exactly how wide, how tall, how sloped. A jurisdiction that has never heard of A117.1 by name may still require everything in it, because its adopted building code pulls A117.1 in by reference. This is the same relationship UFAS has to the Uniform Federal Accessibility Standards program and TAS has to the Texas Architectural Barriers Act, just with a different adopting authority and a different technical source underneath it.

Where A117.1 shows up on a GCHS project

GCHS work is mostly single-family, owner-occupied rehab and accessibility modification, which is why UFAS and the Fair Housing Act design guidelines, not A117.1, drive most day-to-day decisions. A117.1 matters on GCHS projects where local commercial building codes reach in: a multifamily property above a certain unit count, a common area serving the public, or any new construction and substantial alteration a local jurisdiction reviews under its adopted building code. On those projects, A117.1 is often the actual technical rulebook a plan reviewer or inspector is checking against, even where the funding source also requires UFAS or the 2010 ADA Standards. Knowing which standard a given project answers to, and being able to point to the right one by name and edition, is the practical skill this course builds.

Editions and which one applies

A117.1 is revised on a regular cycle, and each edition is dated by year, such as A117.1-2009, A117.1-2017. A building code adopts a specific edition of A117.1 by reference, not "A117.1" in general, so the applicable edition tracks whichever edition of the building code a jurisdiction has adopted, not the calendar year of the project. This course is built entirely around the 2017 edition, because that is the edition the 2021 International Building Code references, and the IBC is the family of building codes most common where GCHS works. An earlier IBC edition may reference an earlier A117.1 edition. A GCHS estimator working a project under local commercial plan review should still confirm which edition of the building code, and therefore which edition of A117.1, that specific jurisdiction has adopted before treating this course's numbers as the applicable ones. An older adopted code can mean an older A117.1 edition with different numbers than the ones taught here.

How A117.1 relates to the 2010 ADA Standards, TAS, and UFAS

These four standards are related but not interchangeable, and GCHS staff already work across several of them. The 2010 ADA Standards are a federal civil rights regulation issued under the Americans with Disabilities Act, enforceable on their own regardless of local code adoption. UFAS is the older federal standard that still governs federally assisted housing under certain HUD program rules. TAS is Texas's own state standard, enforceable through the Texas Architectural Barriers Act on projects that meet its threshold. A117.1 is the odd one out in that it has no independent legal authority at all; it only applies because a building code says it does. In practice this means the same project can face more than one of these standards at once, for example a HUD-funded multifamily rehab that must satisfy both UFAS, because of the funding, and A117.1, because the local building code requires it for the occupancy type. Later lessons in this course return to specific numeric differences between A117.1 and the other standards; this lesson is only about keeping the four sources straight.

A117.1's own chapter structure

A117.1 organizes its technical requirements by building element rather than by building type. Chapters 1 and 2 cover application, administration, and scoping, and Chapter 2 leaves the scoping decisions to whichever authority adopts the standard. Chapter 3 sets the basic building blocks, clear floor space, reach ranges, turning space, that later chapters reuse instead of repeating. Chapter 4 covers accessible routes, including doors, ramps, curb ramps, and elevators. Chapter 5 covers general site and building elements, such as parking spaces, stairways, handrails, and windows. Chapter 6 covers plumbing elements. Chapter 7 covers communication elements: signage, alarms. Chapter 11 is the chapter this course spends the most time on beyond this lesson, because it covers dwelling units and sleeping units directly, and it is organized around several different unit categories, Accessible units, Type A units, Type B units, and Type C (Visitable) units, that each carry their own technical requirements rather than one uniform set of numbers. That distinction, and why it matters, is covered in full starting in Lesson 9.

The copyright rule this course follows

Unlike TAS and UFAS, which are freely published by their issuing government agencies, A117.1 is copyrighted by ICC and sold as a purchasable document. ICC makes a free, read-only online viewer available, and every fact in this course was checked against that viewer rather than assumed or borrowed from another standard. This course names A117.1 openly and cites its section numbers, because citing a section number is not reproducing the standard's text. What this course does not do, anywhere, is quote a run of A117.1's own sentences. Every requirement here is restated in GCHS's own words. This course is independent GCHS training built from publicly checkable section numbers; it is not ICC's own material, and nothing here should be presented to an inspector, reviewer, or client as an official ICC publication or as a substitute for the actual purchased standard.

Key numbers

This lesson has no dimensional figures of its own; it sets up the framework the numeric lessons that follow depend on: A117.1 is a referenced standard, not independently enforceable; this course is built on the 2017 edition, referenced by the 2021 International Building Code; A117.1's own numbers can differ from the 2010 ADA Standards, TAS, and UFAS on the same element, most importantly across its own Accessible, Type A, and Type B dwelling unit categories in Chapter 11.

Why this matters for GCHS

Confusing A117.1 with TAS, UFAS, or the ADA Standards on a project that is actually reviewed under a local building code is an easy mistake with real consequences: a plan built to the wrong standard's numbers can fail plan review or a final inspection even when it is fully accessible by another standard's measure. Knowing which standard applies, and which edition, before estimating a job keeps GCHS from redesigning after the fact.

How a building code, A117.1, and other accessibility standards relate on a GCHS project A diagram showing a building code box labeled International Building Code pointing down to an A117.1 box labeled technical requirements, with a separate row showing the ADA Standards, TAS, and UFAS as independent standards that can apply to the same project alongside A117.1 depending on funding source and jurisdiction. Legal authority to enforce and technical source Building code e.g. International Building Code adopts by reference A117.1 technical dimensions only Independent standards that can also apply 2010 ADA Standards federal civil rights law TAS Texas state law UFAS federal housing funding rule
A117.1 only reaches a GCHS project through an adopted building code. The ADA Standards, TAS, and UFAS are separate, independently enforceable standards that can apply to the same project at the same time.

Practice questions

1. What kind of document is A117.1?

  1. A Texas state law adopted under the Texas Architectural Barriers Act
  2. A referenced technical standard with no independent legal force
  3. A HUD program handbook issued to federally assisted housing owners
  4. A federal civil rights regulation enforced by the Department of Justice

2. What actually makes A117.1 enforceable on a given project?

  1. A building code, such as the IBC, adopting A117.1 by reference
  2. A GCHS internal policy that names A117.1 as the office standard
  3. The Fair Housing Act design requirements for covered multifamily housing
  4. A117.1 is enforceable everywhere by default once it is published

3. Between a building code and A117.1, which one sets scoping (which buildings and elements must be accessible) versus technical dimensions?

  1. Both set dimensions only, with no scoping role for either
  2. The building code sets scoping; A117.1 sets the technical dimensions
  3. A117.1 sets scoping and the building code sets the technical dimensions
  4. Both set scoping only, leaving all dimensions to the designer

4. On what kind of GCHS project is A117.1 most likely to be the controlling technical standard?

  1. A multifamily or common-area project reviewed under a local building code
  2. A117.1 never applies to GCHS work because the work is federally funded
  3. Any single-family owner-occupied modification, since it is always code-reviewed
  4. Any project receiving HUD funding, regardless of building type or local review

5. Which edition of A117.1 does this course use?

  1. A117.1-2009
  2. A117.1-2017
  3. A117.1-2021
  4. Whichever edition is newest at the time of reading

6. What determines which edition of A117.1 actually applies to a specific project?

  1. The calendar year construction starts, with the newest edition applying
  2. Whichever edition GCHS prefers for its own estimating files
  3. The edition used in this course, always, regardless of local adoption
  4. Which edition of the building code the local jurisdiction has adopted

7. A GCHS estimator is scoping a multifamily project in a jurisdiction that has adopted an older building code than usual. What should they do before relying on this course's numbers?

  1. Assume the newest published A117.1 edition automatically applies to the project
  2. Nothing; A117.1 numbers stay the same across every edition it has published
  3. Confirm which edition of A117.1 that jurisdiction's adopted code references
  4. Use the 2010 ADA Standards instead in every case, since they replace A117.1

8. What is the key difference between A117.1 and the 2010 ADA Standards in terms of legal authority?

  1. The ADA Standards are independently enforceable federal civil rights law; A117.1 has no authority except through code adoption
  2. They have identical legal authority
  3. A117.1 is federal law and the ADA Standards are not
  4. Neither has any independent legal authority

9. Can a single GCHS project be subject to both UFAS and A117.1 at the same time?

  1. No, UFAS always overrides A117.1 whenever federal funding is involved
  2. No, A117.1 always overrides UFAS because it is the more recent standard
  3. Yes, such as a HUD-funded multifamily rehab under UFAS by funding and A117.1 by local code
  4. No, only one accessibility standard can ever apply to a single project, whatever its funding

10. Which A117.1 chapter sets the reusable building blocks, clear floor space, reach ranges, turning space, that later chapters depend on?

  1. Chapter 6
  2. Chapter 7
  3. Chapter 3
  4. Chapter 11

11. Which A117.1 chapter covers dwelling units and sleeping units, and organizes them into several distinct unit categories rather than one uniform set of numbers?

  1. Chapter 4, Accessible Routes
  2. Chapter 5, General Site and Building Elements
  3. Chapter 7, Communication Elements and Features
  4. Chapter 11, Dwelling Units and Sleeping Units

12. Why does this course cite A117.1 section numbers instead of quoting its text?

  1. ICC requires courses to hide which standard they cover
  2. There is no reason; either approach would be fine
  3. Section numbers are easier to remember than sentences
  4. A117.1 is copyrighted by ICC; citing a section number is not reproducing its text, but quoting its sentences would be

13. How was every fact in this course checked?

  1. From memory of prior GCHS training materials
  2. Against ICC's free, read-only online viewer of A117.1-2017
  3. Facts were not independently checked
  4. Against the 2010 ADA Standards, since the numbers are assumed to match

14. Is this course official ICC material?

  1. Yes, it replaces the need to ever consult the actual standard
  2. It is unclear
  3. No; it is independent GCHS training checked against ICC's free viewer, not an ICC publication
  4. Yes, ICC produced this course

Glossary

Referenced standard
A technical document, such as A117.1, that has no legal force on its own but becomes enforceable because a building code names it by reference.
Scoping
The building code's own determination of which buildings, spaces, and elements must be accessible; separate from A117.1's technical dimensions.
Adopted edition
The specific year-dated version of A117.1 that a jurisdiction's currently adopted building code references; may differ from the newest published edition.
Accessible unit
One of the dwelling unit categories in A117.1 Chapter 11, covered fully starting in Lesson 9.
Type A unit
A dwelling unit category in A117.1 Chapter 11 with its own dimensional requirements, covered fully in Lesson 10.
Type B unit
A dwelling unit category in A117.1 Chapter 11 with its own, generally smaller-clearance requirements, covered fully in Lesson 11.
Free read-only viewer
ICC's online tool for reading A117.1 without purchasing it; the source this course's facts were checked against.