ICC A117.1 100%

A117.1 Chapter 4

Lesson 3: Accessible route, doors, and doorways

A117.1 402-404 · 14 practice questions

0:00 / --:--

Reading

Chapter 4 of A117.1 covers the accessible route, the continuous, unobstructed path a person using a wheelchair or another mobility aid follows through a building or site. This lesson looks at Section 402, which defines what a route can be made of, Section 403, which sets the rules for the walking-surface portions of that route, and Section 404, which covers doors and doorways, one of the most frequently inspected items on any GCHS project. Ramps, curb ramps, stairs, handrails, and elevators, the other components an accessible route can include, get their own full treatment in the next lesson.

What an accessible route can consist of (402)

Section 402 defines an accessible route as one built from walking surfaces that comply with Section 403, doors and doorways that comply with Section 404, gates, and, where the route needs to change elevation, ramps, curb ramps, blended transitions, elevators, or platform lifts. A route made only of stairs is never accessible on its own, no matter how well the stairs themselves are built; some component along the path has to provide a way around any change in level. This lesson focuses on the flat, walking-surface portions of that route and on doors; the sloped and vertical-circulation components are covered in the next lesson.

Walking surface slope and cross slope (403)

Section 403 treats a walking surface differently from a ramp based on how steep it is. A running slope of 1:20 or less is simply a walking surface; anything steeper has to be designed and detailed as a ramp instead, which brings in the ramp-specific rules covered in the next lesson. Independent of running slope, Section 403 also caps cross slope, the tilt across the direction of travel, at 1:48 maximum on any walking surface. A sidewalk or hallway that sheds water by sloping too steeply from one side to the other can fail this requirement even if it is perfectly flat in the direction someone is walking.

Clear width of walking surfaces (403)

Section 403 sets the minimum clear width of a walking surface at 36 inches for an interior route and 48 inches for an exterior route, with a narrower 32-inch minimum allowed only for segments up to 24 inches long, separated by full-width segments at least 36 inches wide and 52 inches long in new construction (48 inches long in existing buildings). An interior hallway on a GCHS rehab project has to hold that 36-inch clear width continuously, not just at its widest point; a single piece of furniture, a mechanical chase, or a poorly placed door swing that narrows the hall below 36 inches over any real distance breaks compliance even where the rest of the hallway is generous.

Door clear opening width (404)

Section 404 measures a doorway not by the door's nominal size but by its actual clear opening, the space available with the door open. The general minimum clear opening width is 32 inches. Where an opening is more than 24 inches deep and has no door at all, such as a thick-wall passage between two rooms, the minimum clear opening width increases to 36 inches. This distinction matters on older GCHS rehab houses, where a deep exterior wall or an added storage nook can create exactly that kind of doorless, deep opening. Measuring the clear opening rather than the door itself also means a door that looks generously sized when closed can still fail once it is checked with a tape measure at 90 degrees open, since hinges, stops, and the thickness of the door leaf all eat into the usable width.

Maneuvering clearances at doors (404)

Section 404's Table 404.2.3.2 sets the level, clear floor space required on each side of a door so a wheelchair user can actually reach and operate it, and the required space changes with the direction of approach, which side of the door a person is on, and whether the door swings toward or away from them. Rather than reproducing the full table, it helps to see the pattern through a few representative figures. On the pull side of a door approached head-on, Section 404 calls for roughly 60 inches of clearance perpendicular to the doorway, plus about 18 inches of clear space beyond the latch side of the door. On the push side of that same head-on approach, the clearance required is smaller, about 52 inches in new construction, reduced to about 48 inches where the project qualifies as existing construction. Other approach directions, such as a hinge-side or latch-side approach, carry their own combinations of perpendicular and latch-side clearances in the same table. The pattern to remember is that the pull side of a door generally demands more maneuvering room than the push side, and that existing buildings get modest relief compared to new construction.

Thresholds (404)

Section 404.2.4 limits a doorway threshold to 1/2 inch maximum in height and also requires compliance with Sections 302 and 303. A square, unbeveled vertical edge can be no higher than 1/4 inch under Section 303.2. Changes greater than 1/4 inch through 1/2 inch require a bevel no steeper than 1 vertical to 2 horizontal under Section 303.3. The exception for an existing or altered threshold permits a height of 3/4 inch maximum, provided that the edge on each side is beveled at a slope no steeper than 1:2 for the height above 1/4 inch. These are the change-in-level principles covered in Lesson 2, applied at doorways, and they are useful items to check during a GCHS pre-construction walkthrough.

Opening force and hardware (404)

Section 404 limits the force needed to open an interior hinged or sliding door to 5 pounds maximum. Operating hardware, the lever, pull, or latch a person actually touches, has to sit between 34 and 48 inches above the floor and has to be operable with one hand, without requiring a tight grasp, a pinch, or a twist of the wrist, which is the same operable-parts logic from Section 309 in the previous lesson. A round door knob fails this rule outright; a lever handle at the right height satisfies it.

Key numbers

Interior walking surface clear width: 36 in. min; exterior: 48 in. min (32 in. min for segments up to 24 in. long, spaced 52 in. apart new, 48 in. existing) (403). Cross slope: 1:48 max (403). Door clear opening: 32 in. min general, 36 in. min at deep openings without a door (404). Representative maneuvering clearances: front approach, pull side, about 60 in. perpendicular plus 18 in. beyond the latch; front approach, push side, about 52 in. new construction, 48 in. existing (Table 404.2.3.2). Threshold: 1/4 in. max square, unbeveled edge; 1/2 in. max overall with required beveling (303.2, 303.3, 404.2.4). Existing or altered threshold exception: 3/4 in. max, with bevels on both sides no steeper than 1:2 above 1/4 in. (404.2.4). Opening force: 5 lb max (404). Hardware: 34-48 in. above floor, one-hand operable (404).

Why this matters for GCHS

An accessible route is only as good as its weakest link, and doors are where GCHS's rehab and modification scopes most often run into that weak link: a narrow hallway, a doorway that measures fine when closed but loses width once the door swings open, or a threshold left just high enough to catch a wheelchair caster. Because GCHS handles construction management, inspections, and estimating rather than the hands-on carpentry itself, staff need to be able to look at an existing door and hallway and know, before a contractor ever touches it, whether the clear opening, the maneuvering clearance, and the threshold will pass.

Door clear opening and maneuvering clearance under A117.1 Section 404 A plan view showing a door's clear opening width of 32 inches minimum, with maneuvering clearance zones on the pull side and push side of the door: roughly 60 inches perpendicular plus 18 inches beyond the latch on the pull side, and roughly 52 inches perpendicular on the push side. Three threshold profiles on the right show a 1/4-inch maximum square edge, an ordinary 1/2-inch maximum beveled threshold, and the 3/4-inch maximum exception for an existing or altered threshold. Both beveled profiles have edges on each side no steeper than 1 vertical to 2 horizontal above 1/4 inch. Plan: door clearances (404.2.3.2) 32 in. clear opening Pull side 60 in. min (front, pull) 18 in. beyond latch Push side 52 in. min (48 in. existing) Threshold detail (404.2.4) Profile heights shown at the same scale 1/4 in. max square edge 1/2 in. max ordinary threshold 3/4 in. max existing/altered threshold exception Bevel above 1/4 in.: 1:2 maximum slope 1 vertical to 2 horizontal, on both sides
Maneuvering clearance is larger on the pull side of a door than the push side, and existing buildings get a modest reduction. A square, unbeveled threshold edge is limited to 1/4 inch. Ordinary thresholds are limited to 1/2 inch overall and require beveling above 1/4 inch. An existing or altered threshold may be up to 3/4 inch if both edges are beveled no steeper than 1:2 for the height above 1/4 inch (303.2, 303.3, 404.2.4).

Practice questions

1. Under Section 403, what is the minimum clear width for an interior walking surface on an accessible route?

  1. 44 inches
  2. 48 inches
  3. 36 inches
  4. 32 inches

2. Under Section 403, what is the minimum clear width for an exterior walking surface?

  1. 36 inches
  2. 32 inches
  3. 44 inches
  4. 48 inches

3. Under Section 403, at what running slope does a walking surface stop being a walking surface and have to be designed as a ramp?

  1. Steeper than 1:48
  2. Steeper than 1:20
  3. Steeper than 1:12
  4. A walking surface can never exceed 1:100

4. Under Section 403, what is the maximum cross slope permitted on a walking surface?

  1. Cross slope is not regulated on walking surfaces
  2. 1:20
  3. 1:12
  4. 1:48

5. Under Section 404, what is the general minimum clear opening width for a door?

  1. 36 inches
  2. 32 inches
  3. 30 inches
  4. 34 inches

6. A GCHS rehab house has a doorless, deep wall opening more than 24 inches through between the living room and a converted den. Under Section 404, what minimum clear opening width applies?

  1. 48 inches, the same as an exterior walking surface on an accessible route
  2. 32 inches, the same as any other doorway measured with the door open 90 degrees
  3. 36 inches, since the opening is more than 24 inches deep and has no door
  4. There is no minimum for a doorless opening because no door leaf narrows it

7. A GCHS estimator is scoping the pull side of a door approached head-on. Roughly what maneuvering clearance does Table 404.2.3.2 call for on that side?

  1. No clearance is required on the pull side
  2. About 32 inches perpendicular, no clearance beyond the latch
  3. About 48 inches perpendicular only
  4. About 60 inches perpendicular, plus about 18 inches beyond the latch side

8. For the same head-on approach, how does the push-side maneuvering clearance compare to the pull side, and how does an existing building differ from new construction?

  1. The push side needs less clearance than the pull side, and existing buildings get a reduced clearance compared to new construction
  2. Push and pull sides require identical clearance, with no difference for existing buildings
  3. Push-side clearance does not exist under A117.1
  4. The push side needs more clearance than the pull side, and existing buildings need more than new construction

9. Under Sections 404.2.4 and 303.2, what is the maximum height for a square, unbeveled doorway threshold?

  1. 1/4 inch
  2. 1/2 inch
  3. 3/4 inch
  4. 1 inch

10. Under the Section 404.2.4 exception, what is the maximum height for an existing or altered threshold with both edges beveled no steeper than 1:2 for the height above 1/4 inch?

  1. 3/4 inch
  2. 1 inch
  3. Beveled thresholds are not permitted at existing doors
  4. 1/2 inch

11. Under Section 404, what is the maximum force to open an interior hinged or sliding door?

  1. 10 pounds
  2. 5 pounds
  3. There is no force limit for interior doors
  4. 8.5 pounds

12. Under Section 404, what mounting height range applies to door operating hardware?

  1. 27 to 80 inches
  2. 38 to 48 inches
  3. 34 to 48 inches
  4. 15 to 48 inches

13. A GCHS project is replacing a round door knob on an elderly homeowner's front door. Under Section 404, why does a round knob fail even if it sits at the right height?

  1. Because hardware must be operable with one hand and without a tight grasp, pinch, or twist, which a round knob requires
  2. Because round knobs are only prohibited on interior doors, and a front door is an exterior door
  3. Round knobs are permitted as long as the door opens with 5 pounds of force or less and the knob sits 34 to 48 inches above the floor
  4. Height is the only requirement Section 404 places on hardware, and a round knob can sit at any height

14. Under Section 402, what can an accessible route be built from besides walking surfaces and doors?

  1. Only elevators are permitted for a change in elevation
  2. Stairs alone are sufficient as long as they are well built
  3. Ramps, curb ramps, elevators, or platform lifts, wherever the route needs to change elevation
  4. An accessible route may not include any change in elevation at all

Glossary

Accessible route
A continuous, unobstructed path built from compliant walking surfaces, doors, and, where needed, ramps, curb ramps, elevators, or platform lifts, under Section 402.
Running slope
The slope of a surface in the direction of travel; 1:20 or less is a walking surface, steeper requires ramp design, under Section 403.
Cross slope
The slope of a surface perpendicular to the direction of travel, capped at 1:48 maximum on walking surfaces, under Section 403.
Clear opening width
The actual usable width of a doorway with the door open, not its nominal size; 32 inches minimum generally, under Section 404.
Maneuvering clearance
The level clear floor space required on each side of a door, sized differently by approach direction and side, under Table 404.2.3.2.
Threshold
The raised strip at the base of a doorway. A square, unbeveled edge is limited to 1/4 inch. Ordinary thresholds are limited to 1/2 inch overall, with beveling required above 1/4 inch. The 3/4-inch exception applies to an existing or altered threshold with bevels on both sides no steeper than 1:2 above 1/4 inch (303.2, 303.3, 404.2.4).