ICC A117.1 100%

A117.1 Section 607-608

Lesson 6: Bathtubs and shower compartments

A117.1 607, 608 · 14 practice questions

0:00 / --:--

Reading

Section 607 covers bathtubs and Section 608 covers shower compartments, and the two fixtures are governed quite differently. A bathtub is one fixture with a small set of seat and grab bar options; a shower compartment is actually three distinct fixture types under one section number, each with its own footprint, entry width, and seat placement. Treating "roll-in shower" as a single interchangeable category is a common and costly mistake on a GCHS scope of work, since a standard roll-in shower and an alternate roll-in shower are sized differently and are not substitutes for each other.

Bathtub clearance (607.2)

Section 607.2 requires a clearance at least 30 inches deep, running the full length of the tub, and extending 12 inches minimum beyond the head-end wall where a permanent seat is provided at the head end. That clearance is what lets a wheelchair user position alongside the tub to transfer in, rather than having to approach it head-on across a narrow gap. A bathtub installed tight against a vanity or a second fixture, leaving less than 30 inches of clear approach along its length, does not meet 607.2 even if the tub itself is otherwise a standard accessible unit.

Bathtub seats (607.3)

Every accessible bathtub needs a seat, and Section 607.3 allows two approaches: a permanent seat at the head end of the tub, or a removable in-tub seat that sits inside the tub itself rather than being part of its structure. Which option a GCHS project chooses affects the rest of the fixture's layout, since the grab bar requirements that follow are written separately for each seat type.

Bathtub grab bars differ by seat type (607.4)

Section 607.4 sets a separate grab bar layout for each seat option: 607.4.1 for a permanent seat and 607.4.2 for a removable seat. Both layouts use two horizontal bars on the back wall, one of them 8 to 10 inches above the tub rim, plus the same grab bars on the control end wall. The two differ in where the back-wall bars sit, and a tub with a removable seat also needs a horizontal bar at least 12 inches long on the head-end wall.

A GCHS estimator specifying grab bars has to know which seat type is going in before finalizing the grab bar layout, not treat "bathtub grab bars" as one universal spec that applies regardless of seat choice.

Water temperature and hand shower hose (607.6, 607.8)

Section 607 also sets two safety and use figures for bathtubs. Hot water delivered to the tub must be limited to 120 degrees Fahrenheit maximum (607.8), protecting a user who may have reduced sensation or slower reaction time from scald injury. The tub must also have a hand shower with a hose at least 59 inches long (607.6), usable both as a fixed shower head and as a hand shower, with a nonpositive shut-off control.

Transfer-type shower compartments (608.2.1)

The transfer-type shower is the smallest of the three shower types: 36 inches by 36 inches inside, with a minimum 36-inch entry. It also needs a clear floor space adjacent to its open face, sized 48 inches by 36 inches minimum for existing construction or 52 inches by 36 inches minimum for new construction. Its seat, folding or non-folding, is mounted on the wall opposite the controls, so a user transfers in from a wheelchair positioned at the open face, sits on the seat, and reaches the controls across the compartment. This is the type that fits where floor area is tightest on a GCHS rehab project, such as a converted tub alcove, since it needs the least floor area of the three.

Standard roll-in shower compartments (608.2.2)

The standard roll-in shower is a different fixture entirely: 60 inches minimum wide by 30 inches minimum deep inside, with a 60-inch minimum entry along its full width and a threshold no higher than 1/2 inch (608.6). Its clearance is 60 by 30 inches minimum, and its folding seat is mounted on an end wall rather than opposite the controls. A wheelchair user rolls straight into a standard roll-in shower rather than transferring, which is the entire point of the type, but it demands significantly more floor area than a transfer-type compartment.

Alternate roll-in shower compartments (608.2.3)

The alternate roll-in shower is a third, separate configuration: 60 inches minimum wide by 36 inches minimum deep, with a narrower 36-inch minimum entry located at one end of that 60-inch width rather than spanning the full width. A seat wall 24 to 36 inches long closes off the rest of the entry side, and the folding seat is mounted on it. Note that this type is deeper than the standard roll-in, 36 inches versus 30, so it is not a way to save depth on a tight GCHS bathroom layout; it is chosen when the layout calls for a wall along part of the entry side instead of a fully open 60-inch face.

Shower controls and hand shower height (608.4, all three types)

Across all three shower compartment types, controls and any hand shower must be mounted 38 to 48 inches above the shower floor, though the exact horizontal position within the compartment varies by type since each has a different seat and entry arrangement (608.4.1 through 608.4.3). A control panel installed above 48 inches, even in an otherwise correctly sized transfer or roll-in shower, puts the controls out of reach for a seated user and fails this requirement regardless of the compartment type.

Key numbers

Bathtub clearance: 30 in. min deep along tub length, plus 12 in. beyond the head-end wall with a permanent seat (607.2). Water temp: 120°F max (607.8). Hand shower hose: 59 in. min (607.6). Transfer-type shower: 36 in. x 36 in. inside, 36 in. min entry, clearance 48x36 in. (existing) / 52x36 in. (new) (608.2.1). Standard roll-in shower: 60 in. min wide x 30 in. min deep inside, 60 in. min entry, clearance 60x30 in. (608.2.2). Alternate roll-in shower: 60 in. min wide x 36 in. min deep, 36 in. min entry at one end, seat wall 24-36 in. long (608.2.3). Shower controls/hand shower height: 38-48 in. above shower floor, all three types (608.4).

Why this matters for GCHS

Bathing fixture conversions, tub-to-shower and shower type changes, are among the highest-cost items GCHS estimates for elderly homeowners whose mobility has declined since their home was built. GCHS does not do the plumbing and tile work itself, but the estimate has to specify the correct shower type and its exact footprint before a contractor bids the job, since a transfer-type shower quoted where a standard roll-in was actually needed, or the reverse, means re-scoping a job mid-construction on a homeowner's fixed budget.

Three shower compartment types under A117.1 Section 608 Three plan views side by side. The transfer-type shower is 36 by 36 inches with a seat on the wall opposite the controls. The standard roll-in shower is 60 inches wide by 30 inches deep with a full-width 60-inch entry and a folding seat on an end wall. The alternate roll-in shower is 60 inches wide by 36 inches deep with a narrower 36-inch entry at one end and a 24-to-36-inch seat wall. Transfer-type (608.2.1) Seat 36 in. entry 36 x 36 in. Standard roll-in (608.2.2) Seat 60 in. entry (full width) 60 x 30 in. Alternate roll-in (608.2.3) Seat wall 24-36 in. 36 in. entry, one end 60 x 36 in.
Each shower type has its own footprint and seat placement; a transfer-type compartment cannot substitute for a roll-in type and the two roll-in types are not interchangeable with each other.

Practice questions

1. Under Section 607.2, what clear floor space must run along the length of a bathtub?

  1. 48 inches deep
  2. 24 inches deep
  3. 30 inches deep
  4. 36 inches deep

2. Under Section 607.3, what two seat options does A117.1 allow for an accessible bathtub?

  1. A freestanding shower bench placed next to the tub
  2. A permanent seat at the head end of the tub, or a removable in-tub seat
  3. A folding seat only, mounted on the end wall
  4. No seat is required if grab bars are present

3. Under Section 607.4, do bathtubs with a permanent seat and a removable in-tub seat use the same grab bar configuration?

  1. No grab bars are required at bathtubs
  2. Only removable-seat tubs require grab bars
  3. Yes, both seat types use an identical grab bar layout
  4. No, back-wall bar placement differs, and a removable-seat tub also needs a head-end wall bar

4. What is the maximum hot water temperature permitted at an accessible bathtub under Section 607.8?

  1. 110 degrees Fahrenheit
  2. 140 degrees Fahrenheit
  3. 130 degrees Fahrenheit
  4. 120 degrees Fahrenheit

5. Under Section 607.6, what is the minimum hand shower hose length at a bathtub?

  1. 59 inches
  2. 36 inches
  3. 48 inches
  4. 54 inches

6. Under Section 608.2.1, what are the inside dimensions and minimum entry width of a transfer-type shower compartment?

  1. 60 in. x 36 in. inside, 36 in. min entry
  2. 48 in. x 48 in. inside, 30 in. min entry
  3. 36 in. x 36 in. inside, 36 in. min entry
  4. 60 in. x 30 in. inside, 60 in. min entry

7. In a transfer-type shower, where is the seat located relative to the controls, under Section 608.2.1.3?

  1. On the same wall as the controls
  2. On the wall opposite the controls
  3. There is no fixed seat location specified
  4. Adjacent to the entry, perpendicular to the controls

8. Under Section 608.2.2, what are the inside dimensions and entry width of a standard roll-in shower compartment?

  1. 48 in. min wide x 48 in. min deep, 48 in. min entry
  2. 36 in. wide x 36 in. deep, 36 in. entry
  3. 60 in. wide x 36 in. deep, 36 in. entry
  4. 60 in. min wide x 30 in. min deep, 60 in. min entry

9. A GCHS scope of work calls for a "roll-in shower" without specifying which type. A contractor installs a 60-by-36-inch compartment with a 36-inch entry at one end. Which type did they build?

  1. Transfer-type shower (608.2.1)
  2. None of these; this configuration does not match any A117.1 shower type
  3. Alternate roll-in shower (608.2.3)
  4. Standard roll-in shower (608.2.2)

10. Under Section 608.2.3, what is the required length of the seat wall in an alternate roll-in shower compartment?

  1. 24 to 36 inches
  2. 36 to 48 inches
  3. 18 to 24 inches
  4. 48 to 60 inches

11. In a standard roll-in shower, where is the folding seat mounted under Section 608.2.2.3?

  1. On an end wall
  2. There is no seat in a standard roll-in shower
  3. On the same wall as the entry
  4. On the wall opposite the controls

12. What is the required mounting height range for controls and any hand shower across all three shower compartment types under Section 608.4?

  1. 34 to 48 inches above the shower floor
  2. 38 to 48 inches above the shower floor
  3. 40 to 54 inches above the shower floor
  4. 30 to 40 inches above the shower floor

13. Under Section 608.2.3.1, where is the seat wall located in an alternate roll-in shower compartment, and what does it leave at the entry?

  1. It runs along the entry side and leaves a 36-inch minimum entry at one end of the 60-inch width
  2. It runs along the back wall opposite the entry and leaves a full 60-inch entry
  3. It sits on the control wall and leaves an entry of 30 inches minimum at one end
  4. It is a freestanding bench with no wall and leaves a 48-inch minimum entry

14. For new construction, what clearance is required adjacent to the open face of a transfer-type shower compartment under Section 608.2.1.2?

  1. 48 by 36 inches minimum
  2. 52 by 36 inches minimum
  3. 60 by 30 inches minimum
  4. 36 by 36 inches minimum

Glossary

Permanent seat
A bathtub seat built in at the head end of the tub, one of two seat options allowed under Section 607.3.
Removable in-tub seat
A bathtub seat placed inside the tub rather than built into it, the second seat option under Section 607.3.
Transfer-type shower
The smallest shower compartment type, 36 by 36 inches inside, requiring a user to transfer from a wheelchair positioned at the open face, under Section 608.2.1.
Standard roll-in shower
A 60-by-30-inch minimum shower compartment with a full 60-inch entry that a wheelchair user can roll directly into, under Section 608.2.2.
Alternate roll-in shower
A 60-by-36-inch minimum shower compartment with a narrower 36-inch entry at one end and its own seat wall length, under Section 608.2.3.
Seat wall
The 24-to-36-inch wall along the entry side of an alternate roll-in shower on which the folding seat is mounted, under Section 608.2.3.