ICC A117.1 100%

A117.1 Section 1103

Lesson 10: Type A dwelling units

A117.1 1103.11-1103.12 · 14 practice questions

0:00 / --:--

Reading

Lesson 9 covered Accessible units, the highest built-in tier A117.1 defines: full accessibility from day one, in every room on the accessible route. This lesson covers Type A units under Section 1103. This course treats Type A as the "adaptable" tier, because several features are built so they can be finished or changed later. A Type A unit is still a robust, near-complete accessible spec, not a watered-down one, but it is built with somewhat more design latitude than an Accessible unit. GCHS's own field work is mostly single-family homeowner modifications built to the Accessible standard, but Type A shows up on larger rehabilitation and new-construction projects with several units, where a jurisdiction's adopted code requires a share of the units to meet this tier instead. Knowing where Type A's numbers match Accessible units and where they genuinely differ keeps an estimate or an inspection accurate on that kind of project.

The same entrance, route, and turning-space logic as Accessible units

Section 1103 repeats the pattern Lesson 9 covered almost word for word. A Type A unit's primary entrance sits on an accessible route from public and common areas (1103.2), all rooms served by an accessible route provide a turning space (1103.3.2), and doors and doorways go to Section 404 (1103.5). Section 1103 carries its own exception lists, as Section 1102 does, and they differ in small ways. For example, Type A's door list adds an exterior sliding door threshold allowance, covered next, and its turning-space exception for toilet rooms and bathrooms points to Section 1103.11.2 rather than 1102.11.2.

The exterior sliding door threshold exception (1103.5)

General Section 404.2.4 limits door thresholds to 1/2 inch, with a 3/4 inch beveled allowance only for existing or altered thresholds. For a new Type A unit, Section 1103.5 adds an exception that lets a threshold at an exterior sliding door be 3/4 inch maximum if it is beveled with a slope no steeper than 1:2. That is a genuine, citable allowance at one location, not a loosening of the threshold rule everywhere in the unit. Type B units have the same allowance (Section 1104.5.2.2), but the Accessible unit door exceptions do not list it.

Water closet clearance: identical to Accessible units

A Type A unit's water closet clearance is 60 inches minimum wide by 56 inches minimum deep (1103.11.2.4.2 and 1103.11.2.4.3), matching the general Section 604.3 figures Accessible units use. There is one narrow allowance: a lavatory no more than 24 inches deep may sit on the rear wall, at least 18 inches from the water closet centerline, if the clearance at the water closet is increased to 66 inches measured from the rear wall. Apart from that, an estimator sizing a Type A bathroom should not expect any relief on the clearance dimension itself. The main difference between the two unit types is somewhere else.

The seat height difference that actually matters

That difference is the water closet seat height. Accessible units follow the general Section 604.4 range of 17 to 19 inches. Type A units instead have their own range, 15 to 19 inches, set out in its own Section 1103.11.2.4.5 rather than by cross-referencing the general water closet section. The minimum drops two inches lower for Type A. This is a real difference GCHS staff should be able to name on sight: identical clearance, but a wider allowable seat height range because Type A's minimum starts lower.

Kitchens under Section 1103.12

Type A writes its own kitchen section, but its clearance numbers are not smaller than Section 804's. The minimum clearance between opposing base cabinets, countertops, appliances, or walls in the work area is 40 inches. Where counters, appliances, or cabinets are on three contiguous sides, the minimum is 60 inches, with an exception where an island meets the 40 inch rule. Those match the 40 and 60 inch figures Accessible units get from Section 804. What differs in Type A is the set of allowances built around them, covered next. An estimator pricing a Type A kitchen should cite 1103.12, not 804.

Work surface, sink height, and removable cabinetry

Section 1103.12.3 requires at least one accessible work surface 30 inches minimum in length, the same length Section 804.3 uses, though a space with no cooktop or conventional range needs none. The work surface top may be at most 34 inches high, and the front of a kitchen sink at most 34 inches, measured to the higher of the rim or counter surface, which is the same 34 inch cap Sections 902.4 and 606.3 use. What Type A adds is an alternative. A counter or sink that is adjustable between 29 and 36 inches, or that can be relocated within that range without cutting the counter or damaging adjacent cabinets, walls, doors, or structure, is permitted, with rough-in plumbing that allows a sink at 29 inches. Type A also permits cabinetry under the work surface and under the sink if it can be removed without replacing the surface or sink, the floor finish extends under it, and the walls behind it are finished. Those options matter on a rehab project where a single unit may serve more than one resident over time.

Bathing fixtures: same dimensions, more finish flexibility

For bathtubs and showers, Type A units reference the same general Section 607 and 608 provisions Accessible units use, so the dimensions themselves do not change. What Type A permits that an Accessible unit typically would not need is removable cabinetry or countertops around those fixtures. An Accessible unit is generally built with the open space already in place; a Type A unit can be built with a cabinet or countertop installed that gets removed later if a resident needs the fuller clearance, which is part of what makes the tier "adaptable" rather than fixed.

Grab bars: reinforcement now, bars later (1103.11.1)

Where an Accessible unit's fixtures carry grab bars (Sections 604.5, 607.4, and 608.3 at water closets, tubs, and showers), Section 1103.11.1 requires a Type A unit only to provide reinforcement for their future installation, in every toilet and bathing facility. Reinforcement is not required in a room containing only a lavatory and a water closet if that room does not hold the only lavatory or water closet on the accessible level, and a few other narrow exceptions apply.

Key numbers

Entrance, route, and turning space: same pattern as Accessible units, each with its own exception list (Sec.1103). Exterior sliding-door threshold: 3/4 in. max if beveled no steeper than 1:2 (1103.5), also allowed for Type B and not listed for Accessible units. Water closet clearance: 60 in. min wide x 56 in. min deep, matching Accessible units; a lavatory up to 24 in. deep may sit on the rear wall if the clearance is 66 in. deep. Water closet seat height: 15-19 in. under Type A's own Sec.1103.11.2.4.5, versus the general 17-19 in. Sec.604.4 number Accessible units use. Kitchen clearance under Sec.1103.12: 40 in. min, 60 in. min for U-shaped kitchens (island exception applies), the same figures as Sec.804; 30 in. min work surface length; work surface and sink 34 in. max (29-36 in. adjustable range permitted); removable cabinetry allowed under the work surface and sink. Bathing fixtures: same Sec.607/608 dimensions as Accessible units, with removable cabinetry or countertops permitted. Grab bars: reinforcement only (1103.11.1).

Why this matters for GCHS

Most GCHS accessibility modifications are single-family homes built to the Accessible standard, but on a larger rehab or new-construction project with several units, some of those units may be required to meet the Type A tier instead. A GCHS estimator or inspector who treats Type A as "the same as Accessible" will get the water closet clearance right but can miss the allowances Type A adds, such as removable cabinetry, adjustable-height counters, and reinforcement rather than installed grab bars. Flagging the seat height difference matters too: a fixture installed at 16 inches fails an Accessible unit's 17-19 inch range but is well within Type A's own 15-19 inch range, so getting the unit type right before checking the number is the first step, not an afterthought.

Type A water closet and kitchen clearances under Section 1103 A plan view on the left showing the Type A water closet clearance of 60 inches wide by 56 inches deep, with an elevation strip showing the 15 to 19 inch seat height range, two inches lower at the minimum than the general 17 to 19 inch range. A plan view on the right shows a Type A kitchen with 40 inches minimum clearance between opposing counters, rising to 60 inches minimum for a U-shaped layout. Water closet (1103.11) Clearance 60 in. x 56 in. 60 in. wide 56 in. 19 in. max Type A: 15 in. min General: 17 in. min Kitchen (1103.12) Counter Counter 40 in. min (60 in. min if U-shaped)
Type A's water closet clearance matches the general figure, but its own seat-height range starts two inches lower. Type A's kitchen clearances are written in Section 1103.12 and match Section 804's 40 and 60 inch figures.
Type A kitchen work-area clearancesPlan sketches compare opposing counters with 40 inches minimum between them and a U-shaped layout with 60 inches minimum, under Section 1103.12. The reading describes an island exception. Opposing counters40 in. minimumU-shaped layout60 in. minimum
Type A, Section 1103.12: opposing work-area elements require 40 inches minimum; the three-sided layout requires 60 inches minimum. See the reading for the island exception. Schematic plans.
Removable cabinetry in a Type A kitchenSurface or sink: Stays in place when cabinetry is removed. Floor finish: Extends under the cabinetry. Walls behind: Finished behind the cabinetry. Surface or sinkStays in place whencabinetry is removedFloor finishExtends underthe cabinetryWalls behindFinished behindthe cabinetry
Section 1103.12: the reading describes removable cabinetry beneath the work surface and sink, with the surface or sink retained and finished floors and walls.

Practice questions

1. Under Section 1103, how does the entrance, route, and turning-space pattern for Type A units compare to Accessible units?

  1. Type A units require a wider accessible route than Accessible units
  2. Only Accessible units are required to have an accessible route to the primary entrance and between rooms
  3. The same general pattern as Accessible units, but Type A carries its own exception list
  4. Type A units need no turning space at all

2. For a new Type A unit, what does Section 1103.5 allow at exterior sliding doors that the general 1/2 inch threshold limit in Section 404 does not?

  1. No threshold is allowed at any exterior door
  2. A beveled threshold up to 3/4 inch at an exterior sliding door
  3. A ramp is required at every exterior door regardless of rise, with a 1:12 maximum slope
  4. Thresholds are limited to 1/4 inch with no exceptions

3. What is the water closet clearance required in a Type A unit under Section 1103?

  1. 60 in. wide x 56 in. deep
  2. 60 in. wide x 60 in. deep
  3. 48 in. wide x 56 in. deep
  4. 56 in. wide x 60 in. deep

4. What is the water closet seat height range for a Type A unit under Section 1103.11.2.4.5?

  1. 17-19 in.
  2. 16-18 in.
  3. 15-17 in.
  4. 15-19 in.

5. A GCHS estimator is scoping a multi-unit rehab building where the units will be built to the Type A standard. The plans show a water closet seat at 16 inches. Does this comply?

  1. No, Type A requires 17 to 19 inches like Accessible units
  2. No, Type A permits no seat height below 18 inches
  3. Compliance depends on the kitchen's U-shaped exception
  4. Yes, because Type A's own range is 15 to 19 inches

6. Under Section 1103.12, what is the minimum clearance between opposing counters, appliances, or walls in a Type A kitchen?

  1. 44 in.
  2. 48 in.
  3. 36 in.
  4. 40 in.

7. What minimum clearance applies to a U-shaped Type A kitchen, and what exception applies?

  1. 48 in. minimum, with a peninsula exception
  2. 60 in. minimum, with an island exception
  3. There is no separate U-shaped number
  4. 40 in. minimum, no exceptions

8. What is the minimum length of the accessible work surface required in a Type A kitchen?

  1. 36 in.
  2. 30 in.
  3. 24 in.
  4. 28 in.

9. What is the maximum sink or counter height in a Type A kitchen, and what adjustable range is permitted as an alternative?

  1. 34 in. max, with an adjustable 29-36 in. range permitted
  2. 36 in. max, no adjustable range permitted, measured to the counter surface only
  3. 32 in. max, with an adjustable 28-34 in. range
  4. 34 in. max only, no adjustable range permitted, and no relocatable counters

10. How do Type A bathing fixture (bathtub and shower) dimensions compare to Accessible units?

  1. Type A references the same general Section 607/608 dimensions as Accessible units, but permits removable cabinetry or countertops
  2. Type A does not require a bathing fixture
  3. Bathing fixtures are optional in Type A units
  4. Type A uses its own smaller shower dimensions than Accessible units

11. A GCHS inspector reviewing a Type A unit's bathroom finds a removable base cabinet installed under a sink where an Accessible unit would need a permanently open knee space. Is this acceptable for Type A?

  1. Yes, if it can be removed without replacing the sink, the floor finish extends under it, and the walls behind are finished
  2. Only acceptable in buildings with fewer than four units
  3. No, all unit types must have identical permanent knee space
  4. No, the cabinet must be bolted in place permanently

12. Which statement best describes Type A units relative to Accessible units?

  1. A fully accessible tier identical in every dimension to Accessible units, with installed grab bars and no adjustable-height or removable-cabinet allowances
  2. A tier that applies only to single-family detached homes
  3. A tier with no dimensional requirements at all
  4. An adaptable tier with removable cabinetry and reinforcement rather than installed grab bars, still a near-complete spec

13. GCHS is estimating a larger rehab project with several units required to meet the Type A standard. Which of the following is a real difference from the Accessible-unit spec the estimator should flag?

  1. Type A units require no kitchen clearance at all
  2. Type A units may skip the accessible entrance requirement
  3. Type A's water closet seat height range starts two inches lower than the general Chapter 6 number Accessible units use
  4. Type A requires a wider accessible route than Accessible units

14. How do Type A's kitchen clearances (40 in., and 60 in. for U-shaped kitchens) compare with the Section 804 clearances an Accessible unit uses?

  1. They are 4 inches smaller than Section 804 at each figure, since Type A writes reduced clearance numbers to allow for removable cabinetry
  2. They are 8 inches larger than Section 804 because Type A adds a work surface
  3. They match Section 804's 40 and 60 inch figures; Type A differs in adjustable-height and removable-cabinetry allowances
  4. Section 804 sets no clearance figures, so Type A's are the only ones in the standard

Glossary

Type A unit
An "adaptable" dwelling-unit tier under Section 1103, with removable cabinetry and reinforcement in place of installed grab bars, but still a robust, near-complete accessible spec.
Adaptable design
A design approach that permits some finish elements, such as cabinetry, to be installed now and removed later without changing the unit's underlying clearances.
Beveled threshold
A sloped threshold edge; Type A's exception list (1103.5) allows one up to 3/4 inch at new exterior sliding doors, and Type B has the same allowance.
Water closet clearance
The 60-inch by 56-inch minimum floor space around a water closet, identical for Type A and Accessible units.
U-shaped kitchen
A kitchen layout with counters or appliances on three sides, subject to Type A's 60-inch minimum clearance, the same figure as Section 804, with an island exception.
Accessible work surface
A section of counter, at least 30 inches long in a Type A kitchen, usable from a seated position.
Removable cabinetry
Cabinets or countertops installed under a work surface or sink, or at a bathing fixture, that can later be taken out to provide fuller clearance, permitted in Type A units under stated conditions.