AYBR 100%

AYBR Program Administration

Lesson 1: What AYBR is and how the money flows

Module 1: Program foundations · 14 practice questions

0:00 / --:--

Reading

Welcome to the AYBR Program Administration course. By the last lesson you should be able to run a Texas Department of Housing and Community Affairs (TDHCA) Amy Young Barrier Removal (AYBR) project from the first call to the closeout file, and to prove every step with a document. This first lesson gives you the big picture: what the program is, whose money it is, who it helps, how much one household can receive, and who does what.

What AYBR is

AYBR "provides one-time grants in combined Hard and Soft Costs to Persons with Disabilities" (10 TAC 26.20). In plain words, TDHCA pays for accessibility work in the homes of people with disabilities who have low incomes. The rule says the purpose is to increase accessibility and eliminate substandard conditions. The 2026 AYBR NOFA adds the words "life-threatening hazards," and the AYBR Program Manual (May 2025) describes the work as "making accessibility modifications and eliminating life-threatening hazards or unsafe conditions."

Think of the priority this way. Accessibility comes first: ramps, handrails and similar changes that let the person with the disability live safely in the home. Life-threatening hazards and unsafe conditions are fixed too, but the rule limits how much of the budget they may take. Lesson 8 covers that limit (10 TAC 26.27(d)).

Whose money it is: the Texas Housing Trust Fund

AYBR is paid for with state money, not federal money. The 2026 NOFA says the program is funded through the Texas Housing Trust Fund (HTF), and the 2026-2027 HTF Biennial Plan says AYBR is funded from the 2026-2027 state appropriation. The Plan and the Program Manual both say the HTF was established in 1991 by the 72nd Texas Legislature in Senate Bill 546.

This matters more than it sounds. Some rules in 10 TAC Chapter 20 are written only for Administrators that receive federal funds. Because AYBR money is state money, those provisions are not required as written. You will meet that point again in Lessons 2 and 4.

A few numbers show the scale. The state appropriated $1,727,974 for AYBR in state fiscal year 2026 and $1,729,741 for 2027, a biennium total of $3,457,715. After the Department's own administration, the funds for programming are $1,555,177 and $1,556,767. The 2026 NOFA began with exactly the 2026 programming figure: $1,413,798 for projects plus $141,379 for administrative fees, which adds up to $1,555,177. The NOFA was amended July 23, 2026 to add $2,575,405 ($2,341,278 for projects and $234,127 for administration) from repayments to or deobligation from the Texas HTF. That brings the 2026 NOFA to about $4,130,582. The Plan also promises each state region at least $100,000 in each year of the biennium.

Why this matters

The money is a limited state appropriation plus repayments, and it moves between regions and phases. A reservation is never a promise of funding. Lesson 3 shows how the Reservation System works and why timing matters.

Who is served

There are two people-tests, both in the rule. At least one household member must be a Person with Disabilities (10 TAC 26.25(a)), and the Household must be Low-Income (26.25(b)). The Household may own or rent: the Program Manual says "Households may be tenants or homeowners," and the Plan says the same about homeowners, tenants and members of their households. Lesson 6 covers income limits, assets and the property rules for rentals.

The grant is one-time. The sources do not describe a look-back period for earlier help. If an applicant mentions prior assistance, check the current Program Manual, ask TDHCA, and put the answer in the Activity File.

How much one household can receive

The NOFA allows "one-time grants of up to $22,500" per household (2026 AYBR NOFA, section 3). The Plan, the manual and the Reservation System User Guide agree on the same limit. The grant is the combined Project Costs, which come in two kinds (10 TAC 26.21):

  • Hard Costs are site-specific costs of construction: permits, a jobsite toilet, a dumpster, demolition, materials and labor.
  • Soft Costs are costs related to a specific unit other than construction costs. The manual's examples are Administrator staff or consultant time with the household, Administrator staff mileage, a septic inspection and lead testing.

Soft Costs are optional and cannot exceed 10 percent of Hard Costs. The easy way to remember it is to divide the total by 11. At the maximum, the Department's default budget is Hard $20,455 and Soft $2,045 (Program Manual p9; HTF Reservation System User Guide). Reserve the full amount only when the job needs it. If you draw less than you reserved, the Soft Costs you request still cannot exceed 10 percent of the Hard Costs you request.

Two practical notes on Soft Costs. Contracting out the inspection or the work write-up is itself a Soft Cost. And every Soft Cost is claimed on the Activity Soft Cost Invoice and documented in that household's Activity File, so keep the time sheets and mileage logs from day one (Program Manual p9 and p23).

The administrative fee goes on top

The Administrator is paid for managing the project. The fee is 10 percent of the Project Costs, meaning combined Hard and Soft Costs, paid to the Administrator upon completion (10 TAC 26.21(1) and 26.24(g)). The manual says it is paid "in addition to the grant amount." Three points trip people up:

  • It is 10 percent of the Hard plus Soft Costs actually drawn, not of the amount reserved.
  • It is not 10 percent of Hard Costs alone.
  • It is paid on top of the grant, so the most the fee can be on a $22,500 project is $2,250.

The Department, not the Administrator, enters the fee at reservation (Program Manual p17).

ExampleHardSoftProject Costs10% feeGrant plus fee
Maximum project$20,455$2,045$22,500$2,250$24,750
Smaller project$18,000$1,800$19,800$1,980$21,780
Who is in the AYBR money chain and how one grant is split Top row: state Texas Housing Trust Fund money, then TDHCA which reviews each stage and issues the contract, then the Administrator, then the contractor and household. Bottom bar: at the maximum, Hard Costs up to $20,455 and Soft Costs $2,045 make the $22,500 grant, and the administrative fee of $2,250 is paid on top. Texas HTF (state)Housing Trust Fund money2026-2027 appropriation TDHCAReviews every stageIssues the HAC, reimburses Administrator (RSP)Signed RSP AgreementRuns each project Contractor, householdLine-item bid and workHousehold signs off One household at the maximum award Hard Costs up to $20,455 Soft Costs $2,045 Admin fee $2,250, paid on top Grant: up to $22,500 in Project Costs (Hard plus Soft)
The state fund pays through TDHCA, the Administrator runs the project, and at the maximum a $22,500 grant carries a separate 10 percent fee on top.

Who does what

PartyRoleSource
TDHCA (the Department)Reviews each stage, issues the Household Assistance Contract (HAC), and reimburses in one payment10 TAC 26.24(g), 26.28(d)
Administrator (RSP)The entity with a signed RSP Agreement; it does the day-to-day work covered in this course10 TAC 26.21(6)
ContractorGives the Administrator line-item bids and does the work10 TAC 26.27(f)
HouseholdSigns the work write-up and the final inspection and payment requestProgram Manual p23, p27, p28

An Administrator is also called a Reservation System Participant, or RSP. The rule lists these types: Colonia Self-Help Centers, Councils of Government, Units of Local Government, Nonprofit Organizations, Local Mental Health Authorities and Public Housing Authorities, and the NOFA may limit the list further (10 TAC 26.23(a)). The 2026 NOFA lists the same types except Colonia Self-Help Centers. It also says HOME Participating Jurisdictions, meaning cities and counties with a direct HUD HOME award, are ineligible unless no other AYBR Administrator served that jurisdiction in the prior state fiscal year (NOFA section 6(b)).

The work happens in an online system called the Reservation System, also called the Housing Contract System (User Guide p3). Lesson 3 walks through it.

The Department pays by reimbursement. For each project there is one project payment, requested at closeout, and the administrative fee is drawn at 10 percent of that same project draw. Lesson 11 shows the draw package.

The life of one project at a glance

Every household project follows the same path, and the rest of the course teaches it in order. First comes outreach and intake (Lessons 4 and 5), then the eligibility checks on the household and the property (Lesson 6). Next the Administrator asks the Department to reserve funds, which is Stage 1 of the Reservation System (Lesson 3). After Stage 1 is approved the Department issues the Household Assistance Contract, and the clock starts: the term may not exceed 12 months from full execution unless it is amended (10 TAC 26.24(g)).

Inside that term the project moves through three more stages. Stage 2 is the inspection, work write-up and cost estimate (Lesson 8). Stage 3 is procurement, where the Department reviews the selected line-item bid (Lesson 9). Stage 4 is construction, completion and the draw (Lessons 10 and 11). All construction must be finished before the HAC expires, and the draw is due not more than 60 calendar days after it expires (10 TAC 26.28(a)). Lesson 12 covers monitoring and ties the whole course together.

Notice the pattern: the Department approves one stage before the next begins, the Household signs at key points, and every approval leaves a document in the file. That habit of "which document proves it?" is the heart of running AYBR correctly.

Three mix-ups to avoid

  • Reserved is not drawn. A reservation sets aside up to the maximum. What you draw, and therefore what the fee is based on, is what the finished project actually cost.
  • The $22,500 does not include the fee. If you describe the program to a household or a partner, say "up to $22,500 for the project, with the administrative fee paid separately to the Administrator."
  • State money is not a lesser rulebook. The rules that apply are different from federal programs, not fewer. Fair housing, records, cost principles, procurement and monitoring all still apply, as the next lessons show.

The NOFA also states the same totals the other way around: $3,755,076 for projects plus $375,506 for administration, which adds up to the same $4,130,582 (2026 AYBR NOFA section 5(a)). If you ever need to quote the size of the program, use the NOFA figure and say that it was amended July 23, 2026.

Where GCHS fits (GCHS procedure)

GCHS provides construction management, inspections and estimating across TDHCA Region 6. It does not provide hands-on repair labor, so the repair work is always done by independent contractor firms. GCHS signed RSP Agreement #2026-9014 and now carries the Administrator role. Three GCHS rules apply from the very first lesson:

  • GCHS charges applicants no fees. The administrative fee comes from the Department, on top of the grant.
  • GCHS staff who inspect or estimate a job never bid on it.
  • Contractors are independent firms, not GCHS staff or affiliates.

GCHS also keeps its files in two places. Applicant records such as Social Security numbers, income and citizenship documents live only in the GCHS Restricted SharePoint library. Program forms and policies live in the shared AYBR Working-Files folder. Before any staff member reserves funds, the manual expects them to have reviewed the Program Rules, the RSP Agreement, the HAC, the NOFA and the manual itself (Program Manual p17).

A worked example

Meet the Delgado household, a made-up example. Ms. Delgado uses a wheelchair and owns her home in Montgomery County. Her inspection and work write-up call for a ramp, a widened bathroom doorway, grab bars and replacement smoke alarms, and the Hard Costs come to $18,000. GCHS can claim Soft Costs of up to $1,800 for things like staff time with the household and staff mileage, so Project Costs are $19,800. The Department pays the administrative fee of $1,980 on top. Ms. Delgado signs the work write-up before bids go out and signs the final inspection and payment request at the end. She pays GCHS nothing. TDHCA reimburses the project once, and the four parties in the chain each did one job.

Practice questions

1. Where does the money for AYBR grants come from?

  1. The federal HOME program, which TDHCA passes through to Administrators for accessibility work and hazard repairs in Region 6 and the other state regions
  2. The Texas Housing Trust Fund, a state appropriation, so Chapter 20 provisions written only for federal funds are not required as written
  3. A revolving loan fund that households repay after the work is finished
  4. HUD disaster recovery funds made available for Region 6

2. Under the 2026 NOFA, what is the most Project Costs (Hard plus Soft) one household can receive, not counting the administrative fee?

  1. $20,455
  2. $24,750
  3. $25,000
  4. $22,500

3. GCHS draws Hard Costs of $18,000 and Soft Costs of $1,800 on a household project. How much is the administrative fee?

  1. $1,980, which is 10 percent of the $19,800 drawn
  2. $1,800, which is 10 percent of the Hard Costs
  3. $2,250, which is 10 percent of the $22,500 maximum
  4. $198, which is 1 percent of the amount drawn

4. Which statement about who AYBR serves is correct?

  1. Only owner-occupants, because tenants cannot receive grants
  2. Any Household headed by someone age 62 or older, whether or not anyone in the Household has a disability, if income is low
  3. A Low-Income Household with at least one Person with Disabilities, whether the Household owns or rents
  4. Any Household with a Person with Disabilities, regardless of income

5. Which party issues the Household Assistance Contract and reimburses the project after approval?

  1. The Administrator, from its own account, before it is repaid by anyone
  2. TDHCA, which reviews each stage and pays in one payment
  3. The contractor, who invoices the Household for the balance
  4. The Household, using a voucher the Administrator provides

6. Which document does the Household itself sign, rather than only the Administrator or contractor?

  1. The final inspection and payment request
  2. The Administrator's fidelity bond
  3. The RSP Agreement between GCHS and TDHCA
  4. The Soft Cost invoice for GCHS staff mileage

7. A city has its own direct HUD HOME award. Under the 2026 NOFA, when can that city be an AYBR Administrator?

  1. Never, because HOME Participating Jurisdictions are always barred from serving as an AYBR Administrator
  2. Always, because Units of Local Government are listed as an eligible type in the rule
  3. Only after it returns its HOME award to HUD
  4. Only if no other AYBR Administrator served that jurisdiction in the prior state fiscal year

8. A new staff member asks what the grant pays for. Which answer matches the rule and NOFA?

  1. Any repair the Household wants, including cosmetic upgrades, up to the $22,500 maximum per household, as long as the contractor agrees
  2. Weatherization of the whole house, with accessibility work treated as optional for the Household
  3. Accessibility modifications, plus life-threatening hazards and substandard conditions, with hazard work limited by the rule
  4. A down payment or closing costs for a more accessible home

9. A Reservation is made at the $22,500 maximum with the Department default split. What are the Hard and Soft Costs?

  1. Hard $20,455 and Soft $2,045
  2. Hard $20,000 and Soft $2,500
  3. Hard $22,500 and Soft $0 in every case
  4. Hard $19,500 and Soft $3,000

10. How does the Department pay for a completed household project?

  1. In several installments, one after each stage the Department approves, with the fee paid at the end of the final stage
  2. By reimbursement of the project in one payment, with the fee drawn at 10 percent of that draw
  3. By advancing the full grant to the Household before work starts
  4. By paying the contractor directly, with no payment to the Administrator

11. Which statement about the origin of the Texas HTF appears in both the Biennial Plan and the Program Manual?

  1. Created in 1991 by an act of Congress as HUD Notice 546
  2. Established in 2006 by the 79th Legislature to replace federal HOME funds
  3. Created by the Board of TDHCA in 1991 through a rule vote
  4. Established in 1991 by the 72nd Texas Legislature in Senate Bill 546

12. An applicant asks whether GCHS will charge her a processing fee. What is the correct answer?

  1. Yes, up to 10 percent of the grant, collected at intake
  2. Yes, but only if she is a tenant rather than an owner
  3. No. GCHS charges applicants no fees, and the Department pays the administrative fee on top of the grant
  4. Only if the contractor she picks charges GCHS first

13. A GCHS inspector wrote the work write-up for a ramp job and now wants his own company to bid on it. What is the GCHS rule?

  1. He may not bid. GCHS staff who inspect or estimate a job never bid on it, and contractors are independent firms
  2. He may bid if the bid is the lowest of those received
  3. He may bid if he discloses the interest in the Activity File
  4. He may bid if a second GCHS employee reviews the estimate

14. What did the July 23, 2026 amendment to the 2026 NOFA add?

  1. $2,575,405 in new federal HOME funds
  2. $1,413,798 reprogrammed from the 2025 NOFA
  3. $141,379 added to the administrative fee pool only
  4. $2,575,405 ($2,341,278 Project plus $234,127 Administrative) from repayments to or deobligation from the Texas HTF

Glossary

AYBR
The TDHCA Amy Young Barrier Removal Program, which makes one-time grants for accessibility work.
Texas HTF
The Texas Housing Trust Fund, the state fund that pays for AYBR.
Hard Costs
Site-specific construction costs such as permits, demolition, materials and labor.
Soft Costs
Unit-specific costs other than construction, optional and capped at 10 percent of Hard Costs.
Project Costs
The grant itself: Hard and Soft Costs combined, up to $22,500 per household.
Administrative fee
Ten percent of the Hard plus Soft Costs drawn, paid to the Administrator on top of the grant.
Administrator
The approved organization that runs AYBR projects under a signed agreement with TDHCA.
RSP
Reservation System Participant, the Administrator with a signed RSP Agreement.
HAC
Household Assistance Contract, the contract TDHCA issues for each household project.
Person with Disabilities
A person with a physical or mental impairment that substantially limits a major life activity.
Low-Income
A Household whose income is within the program limit, set by the greater of 80 percent of area or state median.
NOFA
Notice of Funding Availability, the yearly document that sets AYBR amounts, dates and limits.