AYBR 100%

AYBR Program Administration

Lesson 5: Intake, selection and notices

Module 2, Reaching and selecting households · 14 practice questions

0:00 / --:--

Reading

Lesson 3 showed how a reservation moves through the Department's four stages. Before any of that can happen, a household has to walk through your front door. Intake is where you collect the application, decide who is served first when more people apply than there is money, and tell every applicant the result in writing. It is also where many file problems begin, because it is the first place a record can go wrong, and every later step builds on it.

Write the policies before you take a single application

The AYBR Program Manual (May 2025), pages 5 and 6, lists the written policies an Administrator needs in place before it starts. They are a procurement policy, a conflict of interest policy, a walk-away policy, and a set of intake, selection and prioritization policies and procedures. The intake policy has to say where applications are accepted, how often intake happens, whether households are served first-come, first-served or ranked by specific scoring criteria, whether special-needs households are prioritized, how applicants are notified, how the wait list works, and what the denial policy is, including how a denied household can appeal or reapply.

The rule itself does not list these documents. This is manual procedure. It still matters, because monitoring reviews check marketing, fair housing, procurement and conflict of interest (Program Manual, page 29). A policy that lives only in someone's head cannot be shown to a monitor, and it cannot be applied the same way to every applicant.

GCHS procedure. GCHS keeps its program forms and policies in the shared AYBR Working-Files folder. The intake policy described below is a draft pending attorney review, so treat it as the plan, not yet as adopted policy.

The application packet: small habits that protect the file

The manual (page 11) sets out a short list of habits for the intake application. Each one has a practical reason.

Manual instructionWhy it matters
Download the forms fresh for each applicantForms change. An old saved copy can be out of date and get a packet sent back.
Complete every field, writing "N/A" or "none" where neededA blank looks like something was missed or left to be filled in later.
No correction fluid or tape. Strike through once and have the applicant initialA monitor can see what was originally written and who changed it.
Use the Activity File Documentation ChecklistIt tells you what belongs in the file before you submit anything.
Review bank statements for unreported recurring incomeA monthly deposit the applicant forgot to list can change eligibility.
Confirm no conflict between the applicant and Administrator staff or consultantsIt protects both the household and the program (see Lesson 7).

Ownership and property facts you capture at intake

At intake you also begin the property search. The manual (pages 11 and 12) has you check the tax assessor and appraisal district records. An owner-occupant self-certifies on the intake application that they are the owner of record and that the home is their principal residence. Any other real property the household owns is counted as an asset, supported by a screenshot from the appraisal district. A household buying under a contract for deed may be treated as a renter. When a home has several owners, each of them may have to authorize the modifications. Lesson 6 explains how these facts affect eligibility. For now, note that intake is where you gather them.

One Activity File for every applicant, including the ones you turn down

The manual (page 8) says to create a separate Activity File for each approved and each disapproved applicant. That surprises new staff, who expect files only for households that receive work. The reason is simple. A denial is a decision with consequences, and 10 TAC 20.8(f) requires Administrators to keep a record of all denied applicants, including the basis for the denial. If a household later says it was treated unfairly, the Activity File is your evidence that the decision followed the written policy. The file also keeps one household's records from mixing with another's. Lesson 7 covers how long to keep it and where.

Selecting who is served: what the rule requires and what GCHS chose

When demand is higher than funds, you need a fair, written way to choose. Start with what the rules actually say. Chapter 20 of the Department's rules includes a waitlist section, 10 TAC 20.8(c), but it is written for administrators who receive federal funds. AYBR is paid from the state Texas Housing Trust Fund. As written, then, the 21-calendar-day acceptance period, the bar on first-come, first-served for initial selection, and the neutral random selection requirement are not required for AYBR. The manual instead lets the Administrator choose first-come, first-served or scoring, as long as the choice is in the written policy.

That leaves one honest open question, and you should teach it as open. If an Administrator also receives federal funds under another Department contract, it is unclear whether 20.8(c) reaches its AYBR work. Staff should not assume the answer either way. Ask the Department if it ever matters, and keep the written policy consistent so the answer would not change what you did.

Why this matters

Selection is the most visible fairness decision in the program. When you can show that every applicant had the same chance under a rule written before the window opened, a complaint has very little to stand on. When the choice was made case by case, even a good decision looks arbitrary.

GCHS procedure (draft pending attorney review). GCHS's draft intake policy voluntarily uses the federal-style approach even though AYBR does not require it. It accepts applications during a 21-day window, holds a neutral random drawing, and then serves households first-come, first-served for any funds that remain. It sends written denial notices. Materials are offered in English and Spanish under GCHS's Language Access Plan (Lesson 4). Who runs and who witnesses the drawing is still being decided, so do not describe that part as settled. Whatever GCHS decides, the final policy should say who conducts the drawing, who observes it, and how the result is recorded.

A preference is a separate question. The rule allows a preference for households facing displacement from housing that is inaccessible to them (10 TAC 20.8(b)), and the manual lists prioritization of special-needs households as something a policy can address. The GCHS draft does not describe a preference. If one is added, it has to be written down before the window opens, not applied afterward.

GCHS draft intake and selection process Five steps in a row: adopt written policies, open a 21 day application window, hold a neutral random drawing with first-come selection afterward for remaining funds, review the packet and open an Activity File, then send a written notice of eligible, ineligible or wait-listed. Below are three reminders: every applicant gets an Activity File, a denial letter gives the specific reason and appeal instructions within 14 calendar days of the denial, and appeals of Department decisions go to the Executive Director within 7 calendar days. 1 Policies firstWritten intake,selection, denial2 Open window21 days(GCHS draft)3 Random drawingNeutral, thenfirst-come after4 Review and filePacket checked,Activity File opened5 Written noticeEligible, ineligibleor wait-listedGCHS draft process (pending attorney review)Every applicant gets a fileApproved, denied or waiting:one Activity File eachDenial letterStates the specific reason andhow to appeal. Within 14 daysDepartment decisionsWritten appeal to the ExecutiveDirector within 7 calendar daysRule limits shown: 10 TAC 20.8(f) for denial letters and 10 TAC 1.7(e)(1) for appeals.
GCHS intake runs from written policies through a 21 day window and a drawing to a written notice, with a separate file and a dated letter for every applicant.

Notices: eligible, ineligible or wait-listed

After a complete application, the manual (page 12) requires written notice, in a timely manner, of one of three outcomes. Keep a copy of every notice in the Activity File.

OutcomeThe notice saysWhat happens next
EligibleThe household qualifies and what GCHS will do next.Confirm the applicant understands the program, then request a reservation (Lesson 3).
IneligibleThe specific reason and how to appeal to the Administrator.Deliver within 14 calendar days of the denial. Keep the file.
Wait-listedThe household qualifies but funds are not available now.Keep the file current and follow the wait-list policy.

The manual says only "timely." The rule gives the outer limit for denials: 10 TAC 20.8(f) requires the denial letter within fourteen calendar days of the denial. Teach the 14 days. A written eligibility criteria sheet, including how to request a reasonable accommodation, should already have gone to every applicant (10 TAC 20.8(g)).

Writing a denial letter that holds up

A denial letter should name the reason in plain words and tie it to the criterion that was not met. "You do not qualify" is not enough. "The household's annual income of $71,400 is above the limit for a household of two" tells the applicant what to fix, and it tells a monitor the decision followed the rule. The letter must also say how to appeal to GCHS, and the policy should say whether the household may reapply. Provide it in English and Spanish where GCHS's plan calls for it.

One gap you need to know about: none of the AYBR documents sets a deadline for a household to appeal a denial to the Administrator. The manual says only that the household appeals to the Administrator. Your written policy therefore has to supply a reasonable deadline and state it in every denial letter. If you are unsure, check the current Program Manual before you finalize the policy.

A worked example

Suppose GCHS opens a 21-day application window and the Delgado household, a made-up family of two, applies on day 20. Their application enters the drawing. The drawing is held after the window closes. When the Delgado packet is reviewed, the bank statements show a monthly deposit that was missing from the income form. Corrected, the household's income is above the limit for two people. GCHS opens an Activity File on the day the application arrives. It writes a denial letter naming the income figure and the limit, explaining how to appeal to GCHS, and sends it within 14 calendar days of the denial. A copy goes in the file, and so does the record of the basis for denial.

The Pruitt household, another made-up family, applies on day 25, after the window closed. Under the draft policy they are handled first-come, first-served if funds remain. They are eligible, but the funds available are already committed. GCHS sends a written wait-listed notice rather than leaving them to wonder, and the file stays open. Notice what is common to both: each household got a file, a written notice, and a decision that followed the policy written in advance.

Walking away is a decision too

The manual (page 7) lets an Administrator walk away from a project at its discretion, for example when a home cannot be made safe within the budget (Lesson 8). The Administrator must notify the household in writing, keep the letter in the Activity File, and keep the walk-away policy in the Program File. A household that hears "we can't do your house" by phone has no record, and neither do you.

When the Department says no: appeals under 10 TAC 1.7

So far the appeals have been from your applicants to you. The other direction matters too. If Department staff deny a reservation request or an award, the Administrator may appeal. The 2026 AYBR NOFA (section 9(b)) says an Applicant may appeal staff decisions under 10 TAC 1.7. Section 1.7(d)(1)(C) covers the denial of an award or reservation request. Under 1.7(e)(1), the written appeal goes to the Department's Executive Director not later than the seventh calendar day after notice. A further appeal to the Board must be filed within seven calendar days of the Executive Director's response. The NOFA (section 9(a)) also encourages alternative dispute resolution under 10 TAC 1.17 before or alongside a formal appeal.

Seven calendar days is short. Weekends count. Write the date the notice arrived on your calendar the same day, and decide who is responsible for drafting the appeal letter before you need it.

Complaints

Complaints also begin at intake. A monitoring review can start from a citizen complaint (Program Manual, page 29), and 10 TAC 20.14(c) lists complaints and reports of fraud, waste or abuse among the risk factors for monitoring. Credible fraud complaints can lead to unannounced visits or shorter notice (20.14(d)). Your Language Access Plan must also include a complaint procedure. Keep a simple log of every complaint, who handled it and how it ended, and put it in the Program File.

What to remember

  • Adopt the written policies before the first application.
  • Fill forms completely, never use correction fluid, and open an Activity File for every applicant.
  • Choose a selection method in writing. The 21-day random-selection rule is for federal funds, but GCHS's draft uses it voluntarily.
  • Send a written notice to every applicant. A denial letter names the specific reason and goes out within 14 calendar days.
  • Appeals of Department decisions go to the Executive Director within 7 calendar days.

Practice questions

1. GCHS is about to take its first AYBR applications. Which statement about written policies is correct?

  1. Only a conflict of interest policy is needed before intake, and the others can be written once the first project has been reserved.
  2. The Department supplies standard policies, so an Administrator needs none of its own unless a monitor specifically asks to see them.
  3. Intake, selection and prioritization procedures come first, with procurement, conflict of interest and walk-away policies.
  4. A procurement policy is needed only for jobs above a dollar threshold that the Administrator sets after the work write-up is done.

2. An applicant writes the wrong monthly income on the intake form and a staff member covers it with correction fluid. What should have happened?

  1. Strike through the error with one line, write the correct figure and have the applicant initial the change.
  2. Cover it neatly with the fluid and retype the whole page later so the final packet looks clean to the Department.
  3. Throw away the page and start a new application, destroying the first one so no marked-up copy stays in any file.
  4. Replace the figure with "N/A" and note the correction only in the staff member's own working notes, not on the form.

3. A household applies, is found over the income limit and is denied. Where does its paperwork go?

  1. Nowhere, because Activity Files exist only for households that go on to receive a reservation.
  2. Into the Program File only, grouped with the policies, the NOFA and the signed agreement.
  3. Into the Activity File of the next applicant, so that one file covers each drawing or round.
  4. A separate Activity File, one for each approved and each disapproved applicant.

4. A new staff member says the 21-day acceptance period and random selection in 10 TAC 20.8(c) are required for every AYBR application. What is the best response?

  1. That is correct, because Chapter 20 applies to every Texas Housing Trust Fund program without exception.
  2. As written, 20.8(c) applies to an Administrator receiving federal funds, and AYBR is state-funded, so it is not required, though GCHS chose to use it.
  3. It applies only to renters, because owner-occupants are chosen by the date they applied.
  4. It applies only when the household asks for a reasonable accommodation under 20.8(g).

5. Which description matches GCHS's draft intake policy?

  1. First-come, first-served for the whole year, with no drawing, and denial notices only if the household asks.
  2. A 21-day application window, then a neutral random drawing, then first-come, first-served for remaining funds, with written denial notices.
  3. A 30-day window, a scoring system run by the contractor chosen for the job, and verbal denial notices.
  4. A random drawing held before the window opens, with no wait list for households that were not drawn.

6. Who will run and witness GCHS's random drawing?

  1. The contractor with the lowest bid, so the winner can show it was not chosen in advance.
  2. The Department's staff, who must attend every drawing under 10 TAC 26.24 and sign the result.
  3. The staff member who will later perform the initial inspection, since he or she knows the homes best.
  4. That is still being decided, so the final policy must name who conducts it and who observes it.

7. GCHS decides on a denial on March 3. By when must the denial letter be provided under 10 TAC 20.8(f)?

  1. Within fourteen calendar days of the denial, by March 17.
  2. Within seven calendar days of the denial, so the letter must go out by March 10 at the latest.
  3. Within thirty calendar days of the denial, so the letter has until April 2 to be provided.
  4. There is no rule limit, so the letter may wait until the next reporting period of the agreement.

8. Which denial letter best meets the program's expectations?

  1. It says only that the application was not approved and invites the household to call the office for more details.
  2. It lists the three highest-ranked applicants and explains that the household ranked lower than each of them.
  3. It states that income of $71,400 is above the limit for a household of two and explains how to appeal to GCHS.
  4. It names the reason but leaves out any appeal route, so the household is told to reapply the following year.

9. A household is eligible, but all available funds are committed. What should GCHS send?

  1. Nothing until funds become available, because only eligible and ineligible notices exist in the manual.
  2. A written wait-listed notice, with a copy kept in the Activity File and the file left open.
  3. An ineligibility letter, so the household is free to reapply later when funds are available again.
  4. A phone call only, because a written notice could create an expectation of funding for the household.

10. A Department staff member denies a reservation request and GCHS decides to appeal. What is the first deadline?

  1. A written appeal to the Board within thirty days of the date on the notice of denial.
  2. A phone call to the Single Family program director within fourteen calendar days of the notice.
  3. There is no deadline for appeals of reservation decisions, so GCHS may file whenever it is ready.
  4. A written appeal to the Executive Director by the seventh calendar day after notice.

11. A bank statement in the packet shows a recurring monthly deposit that is not on the income form. What should staff do?

  1. Ignore it, because only the income form is used for income and bank statements are for the asset test alone, as the form explains.
  2. Deny the application automatically for providing false information, with no chance to explain the deposit.
  3. Follow up with the applicant, because the manual calls for reviewing statements for unreported recurring income.
  4. Remove the statement from the file so that the packet matches the form the applicant signed earlier.

12. A denied household asks how many days it has to appeal to GCHS. What is the accurate answer?

  1. The AYBR documents set no household deadline, so the answer is whatever GCHS's written policy and denial letter state.
  2. Seven calendar days, because 10 TAC 1.7 sets the clock for household appeals.
  3. Fourteen calendar days, because that is the cure period for administrative deficiencies.
  4. Thirty calendar days, because that is the usual corrective action period.

13. For an owner-occupied home, how does the applicant's ownership get established at intake?

  1. A notarized deed must be uploaded before the Administrator may accept the application at all.
  2. The contractor confirms ownership in person at the pre-construction conference before work begins.
  3. Ownership is checked only at the final inspection, when the household signs the payment request.
  4. The applicant self-certifies, and staff check tax assessor records.

14. A home cannot be made safe within the budget, so GCHS decides to walk away. Which step is required?

  1. Call the household and make a note in the contractor's bid file, which becomes the permanent record.
  2. Notify the household in writing and keep the letter in the Activity File.
  3. Ask the Department for permission, because it must approve every walk-away decision in advance.
  4. Withdraw verbally and return the original documents to the household with no copies kept anywhere.

Glossary

Activity File
The separate file kept for each applicant, approved or denied, following the Activity File Documentation Checklist.
Program File
The single file for the whole program: NOFA and agreement, accounting, policies and program marketing.
Intake application
The household's application packet, completed in full on a freshly downloaded form.
Wait list
A written list of eligible households served as funds become available, under a written policy.
Neutral random drawing
A chance-based method to order applicants that GCHS's draft policy uses after the 21-day window.
Denial letter
Written notice of ineligibility with the specific reason and appeal instructions, due within 14 calendar days of the denial (10 TAC 20.8(f)).
Walk-away
The Administrator's written decision not to proceed on a home, for example when it cannot be made safe within budget.
10 TAC 1.7 appeal
A written appeal of a Department staff decision to the Executive Director, due within seven calendar days of notice.
Alternative dispute resolution
A voluntary process under 10 TAC 1.17 that the NOFA encourages for disagreements with the Department.