Lesson 2: The primary objective and the 70 percent rule
24 CFR 570.200(a)(3) and 570.484 · 14 practice questions
Content current as of September 22, 2026, per the 2026 TxCDBG Project Implementation Manual (effective September 1, 2026) and the current eCFR.
0:00 / --:--
Reading
There are two separate tests sitting on top of every CDBG dollar, and people
routinely confuse them. Get this distinction right at the start and a lot of the
rest of the program stops being confusing.
Test one applies to each activity. Every single activity you
fund has to meet one of three national objectives. Not most activities. Every
one. That is the subject of the next three lessons.
Test two applies to the grant as a whole. Across everything
you spend, at least 70 percent has to benefit low and moderate income persons.
That is the primary objective, and it lives at 24 CFR
570.200(a)(3).
The regulation says that "not less than 70 percent of the aggregate of CDBG
fund expenditures shall be for activities" benefiting low and moderate income
persons. Read the word aggregate carefully. It is not asking whether any
one activity clears 70 percent. It is asking what the pile adds up to.
570.200(a)(3) is the entitlement grantee's citation. TxCDBG runs under
Subpart I, where the same 70 percent overall benefit requirement is stated at
24 CFR 570.484 instead, measured against the state's CDBG
funds over a period of one, two, or three consecutive annual grants. In that
version the certification belongs to the State: the State selects the period
and certifies it to HUD, so an individual TxCDBG grantee does not choose its
own. Neither section writes a case-by-case exception into the 70 percent
floor.
Two tests apply at once: the 70 percent primary objective test is measured across a grantee's whole certification period, while every individual activity must separately clear one of the national objective tests on its own.
The measurement period
The 70 percent is measured over "a period of time specified in their
certification not to exceed three years." An entitlement
recipient picks the period when it certifies (in TxCDBG, the State does). The
period can never be longer than three years.
The percentage is not a simple share of every dollar. Administration costs
are left out of the calculation, as are most planning costs (see
570.200(a)(3)(i), and 570.484(b)(1) for the State program). Housing counts only
for the share of its cost that matches the share of low and moderate income
occupied units (570.200(a)(3)(iv); 570.484(b)(4)), and other activities that
meet the low and moderate income criteria count in full.
This matters more than it looks. A one year period gives you no room to
maneuver: one large activity that benefits an area at 51 percent low and
moderate income, in a year when you did little else, can pull the whole year
under 70. A three year period lets a lean year sit next to a strong one. The
trade is that you are then committed to hitting the number across all three
years, and by year three you have very little ability to correct a shortfall
that built up in years one and two.
The practical discipline is to track the running percentage continuously
rather than discovering it at the end. If you are at 64 percent two thirds of the
way through a three year certification period, you do not have a reporting
problem, you have a programming problem, and the only fix is to change what you
are funding with the money that is left.
Both tests apply at once
An activity can meet a national objective and still hurt your 70 percent. A
slum and blight activity, for example, meets a national objective perfectly well
under 570.208(b), but it does not count toward the low and moderate income
aggregate at all. Fund enough of those and you will fail the primary objective
while every individual activity was compliant.
The reverse is also true. An activity that is wonderfully low and moderate
income in character but does not fit any of the three national objectives is not
eligible, no matter how much good it does. There is no "but it helps poor people"
exception that bypasses 570.208.
So the two tests are a floor and a ceiling working together. National objective
compliance is the gate each activity has to walk through. The 70 percent is the
shape of the whole portfolio once everything is through the gate.
What this means when you are planning
Think about the aggregate before you commit, not after. When a community asks
you to fund something that will land in the slum and blight or urgent need
column, the first question is not whether it qualifies, it is what else is in the
pipeline to carry the low and moderate income weight. If the answer is nothing,
you have just found the reason to say no, or to phase the work differently.
Keep the certification period in front of you as a live number. The 70 percent
is one of the handful of things a monitor can check quickly and objectively, and
a shortfall is not something you can explain away.
Why this matters
Exam questions like to blur these two tests together. The 70 percent line is an aggregate across the certification period, not a per-activity test; a single activity passing or failing its own national objective test is a separate, activity-level question. An answer choice that treats them as the same thing is usually the trap.
Practice questions
1. What minimum share of aggregate CDBG expenditures must benefit low and moderate income persons?
70 percent
51 percent
80 percent
100 percent
Answer: a. 24 CFR 570.200(a)(3) requires that not less than 70 percent of the aggregate of CDBG fund expenditures be for activities benefiting low and moderate income persons.
2. The primary objective is measured over a period specified in the recipient's certification. What is the maximum length of that period?
One year, since every annual grant is tested separately
Three years, the regulatory maximum
Five years, matching a typical Consolidated Plan cycle
Ten years, matching a long-term loan repayment period
Answer: b. 24 CFR 570.200(a)(3) allows the recipient to specify the measurement period in its certification, but not to exceed three years.
3. A recipient funds ten activities. Each one individually meets a national objective. Does that alone satisfy the primary objective?
Yes, meeting a national objective is the whole requirement
Yes, provided at least one activity is a housing activity
No, the 70 percent aggregate test is separate and also applies
No, but only if the grant exceeds a dollar threshold set by HUD
Answer: c. The two requirements are independent. Every activity must meet a national objective under 570.208, and separately the aggregate of expenditures must be at least 70 percent low and moderate income benefit under 570.200(a)(3). Both apply.
4. The word the regulation uses for how the 70 percent is measured across activities is:
Average
Median
Per activity
Aggregate
Answer: d. 570.200(a)(3) speaks of 'the aggregate of CDBG fund expenditures'. It is a total across the certification period, not a test applied to each activity.
5. A slum and blight activity properly qualified under 570.208(b) contributes what to the 70 percent primary objective calculation?
Nothing, it does not count toward low and moderate income benefit
Its full cost, because it met a national objective
Half its cost
Its full cost, but only in the final year of the certification period
Answer: a. Meeting the slum and blight national objective makes an activity eligible. It does not make it low and moderate income benefit. Only activities meeting the low and moderate income criteria (570.208(a), or 570.483(b) for TxCDBG) count toward the 70 percent aggregate.
6. A recipient is two years into a three year certification period and its running low and moderate income share is 64 percent. What is the accurate characterization?
A reporting problem that can be corrected in the annual CAPER narrative
A programming problem that must be fixed with the remaining funds
Acceptable, because the test is applied year by year
Acceptable, because 51 percent is the real threshold
Answer: b. The certification commits the recipient to the aggregate across the whole period. A shortfall partway through can only be corrected by changing what the remaining funds are spent on. It is not a documentation issue.
7. An activity that clearly helps low income residents but fits none of the three national objectives is:
Eligible, because low and moderate income benefit is the program's purpose
Eligible if the recipient certifies urgent need
Ineligible, there is no general benefit exception
Eligible if it is under 15 percent of the grant
Answer: c. Every activity must meet one of the three national objectives at 570.208. There is no exception for activities that are beneficial but do not fit one of them.
8. Which best describes the relationship between the national objective test and the primary objective?
They are two names for the same requirement
The primary objective applies only to housing activities
The national objective applies only to entitlement communities
The national objective is a gate each activity passes; the 70 percent describes the portfolio as a whole
Answer: d. Each activity must independently meet a national objective. Separately, the aggregate of expenditures over the certification period must be at least 70 percent low and moderate income benefit.
9. Choosing a one year certification period rather than three years has what practical effect?
Less room to offset a low benefit year against a strong one
A lower required percentage, such as 60 percent, for that single year
Exemption from the aggregate test until the period ends
A longer period to correct a shortfall than a three year period allows
Answer: a. The percentage does not change with the period. A shorter period simply removes the ability to balance a weak year against a strong one within the same certification.
10. Where is the primary objective's 70 percent requirement found for entitlement grantees?
24 CFR 570.208(a)(1)
24 CFR 570.200(a)(3)
24 CFR 570.201
24 CFR 570.902
Answer: b. 24 CFR 570.200(a)(3). 570.208 holds the national objectives, 570.201 holds eligible activities, and 570.902 holds the timeliness test. For the State program, the 70 percent requirement is at 570.484.
11. This lesson describes two separate tests that apply to CDBG spending. What is the difference between them?
Test one, the 70 percent primary objective, applies to the grant as a whole; test two, the national objective, applies to each individual activity
Both tests apply only to entitlement grantees, while TxCDBG grantees are subject to neither of them
Test one, the national objective, applies to each activity; test two, the primary objective's 70 percent, applies to the grant as a whole
There is only one test, and the "two tests" framing has no basis in the regulations at all
Answer: c. Every activity must independently meet a national objective. Separately, the aggregate of expenditures across the grant must be at least 70 percent low and moderate income benefit. They are two distinct tests operating at two different levels.
12. According to this lesson's exam guidance, what kind of answer choice on this topic is usually the trap?
One that cites the wrong CFR section for slum and blight, such as 570.200 instead of 570.208(b)
One that names TDA instead of HUD as the agency that administers the entitlement program directly
One that says TxCDBG grantees are exempt from the national objectives because a state agency administers the funds
One that treats the 70 percent aggregate test and a single activity's national objective test as if they were the same requirement
Answer: d. The 70 percent line is an aggregate across the certification period, while a single activity passing or failing its own national objective test is a separate, activity-level question. An answer choice that blurs the two is usually the trap.
13. Under 24 CFR 570.484, the State program counterpart, who selects the length of the overall benefit period (one, two or three consecutive annual grants)?
The State, which selects the period and certifies it to HUD
Each local grantee, in its own application to TDA, subject to TDA approval
HUD, based on the size of the state's annual grant and the number of grantees
It is fixed by regulation at exactly three years for every state and every recipient
Answer: a. Under 570.484(a), the State selects the period, designated by fiscal year of annual grants, and certifies it to HUD; it may be one, two or three consecutive annual grants. Local grantees do not pick their own, and HUD does not assign it. (For entitlement recipients, 570.200(a)(3) lets the recipient specify the period in its own certification, up to three years.)
14. Per this lesson's planning guidance, when a community proposes an activity that will land in the slum and blight or urgent need column, what should a grantee ask first?
Whether the activity independently qualifies under 570.208(b) or (c)
What else is in the pipeline to carry the low and moderate income weight, since this activity will not count toward the 70 percent
Whether TDA has pre-approved that specific activity
Whether the activity costs less than $25,000
Answer: b. The first question is not whether the activity qualifies under 570.208(b) or (c), but what else is in the pipeline to carry the low and moderate income weight, since slum/blight and urgent need activities contribute nothing to the 70 percent.
Glossary
Primary objective
The requirement at 24 CFR 570.200(a)(3) that at least 70 percent of aggregate CDBG expenditures, over a certification period, benefit low and moderate income persons.
National objective
The separate, activity-level test at 570.208 that every individual CDBG activity must independently meet.
Aggregate
The total of expenditures across the whole certification period, as opposed to a test applied to any single activity.
Certification period
The 1 to 3 year window a recipient specifies in its certification over which the 70 percent primary objective is measured.
Low and moderate income (LMI) benefit
The category of national objective, and the population, that counts toward the 70 percent aggregate; slum/blight and urgent need activities do not count toward it.
24 CFR 570.208
The regulation holding the national objectives; distinct from 570.200(a)(3), which holds the primary objective.