CDBG 100%

CDBG Administration

Lesson 4: National objective: housing and jobs

24 CFR 570.208(a)(3) and (a)(4) · 14 practice questions

Content current as of September 22, 2026, per the 2026 TxCDBG Project Implementation Manual (effective September 1, 2026) and the current eCFR.

0:00 / --:--

Reading

The last two low and moderate income routes at 570.208(a) are the housing objective and the jobs objective. Both count units or positions rather than area demographics or client rolls, and both have carve outs worth knowing before you rely on the basic rule. TxCDBG's parallel criteria are 570.483(b)(3) for housing and (b)(4) for jobs.

The housing and jobs national objective tests side by side The housing national objective, 570.208(a)(3), qualifies an activity when the assisted housing is or will be occupied by low and moderate income households, verified unit by unit. The jobs national objective, 570.208(a)(4), qualifies an activity when a majority of jobs created or retained are held by, or made available to, low and moderate income persons. Housing · 570.208(a)(3) Qualifies unit by unit Assisted housing is or will be occupied by LMI households Verified per unit, at occupancy against household income Example: single-family rehab Jobs · 570.208(a)(4) Qualifies by who is hired Majority of jobs created or retained go to LMI persons Jobs held by, or made available to, LMI persons both count Example: an economic development grant
Housing and jobs are both LMI-benefit tests, but they are verified differently: housing is checked household by household, jobs are checked by who actually gets hired or retained.

Housing, 570.208(a)(3)

This objective covers permanent residential structures that are, on completion, occupied by low and moderate income households. How the count works depends on the size of the structure:

  • One-unit structure: that single unit must be occupied by a low or moderate income household.
  • Two-unit structure: at least one of the two units.
  • More than two units: at least 51 percent of the units.

For rental housing specifically, occupancy alone is not enough. Occupancy has to be at affordable rents, under standards the recipient adopts and makes public. Two or more assisted rental buildings on the same or contiguous properties under common ownership and management can be counted together as a single structure.

For a single-family home, this is the objective that applies to the work GCHS does. Housing rehabilitation cannot use limited clientele, so the household living in the home is what matters, not the area and not a presumed group. TDA's Guide to Meeting a National Program Objective expects each rehabilitation beneficiary household to be low and moderate income.

Two exceptions bend the basic count.

Mixed income exception, (a)(3)(i). New construction of multifamily, non-elderly rental housing can qualify with fewer than 51 percent of units low and moderate income, as long as not less than 20 percent of the units go to low and moderate income households at affordable rents, and the CDBG share of the development cost is no greater than the low and moderate income share of units. This exists because requiring 51 percent low and moderate income occupancy on every new multifamily project would make CDBG participation in mixed income development impractical.

Rental rehabilitation, (a)(3)(ii). When CDBG funds assist rehabilitation in direct support of a recipient's Rental Rehabilitation program authorized under 24 CFR part 511, the 51 percent test applies to the units assisted by the program overall, not to each individual building. Such a program can rehabilitate one building where every unit is low and moderate income and another where none are, and still qualify overall if the total assisted units across the program clear 51 percent. The provision is tied to that specific program, so other rental rehabilitation is counted structure by structure.

Jobs, 570.208(a)(4)

An economic development activity qualifies here if at least 51 percent of the jobs created or retained, counted on a full-time equivalent basis, are held by or available to low and moderate income persons.

Retention, (a)(4)(ii). Where the activity is about saving jobs that would otherwise be lost, the recipient has to show the jobs would actually be lost without the assistance, and for at least 51 percent of those jobs, either the job is documented as currently held by a low or moderate income person, or it can reasonably be expected to turn over within two years, with concrete steps taken to fill the opening with a low or moderate income person when it does.

"Available to," (a)(4)(iii). A job counts as available to low and moderate income persons, rather than actually held by one, only under two conditions holding together: special skills that take substantial training, work experience or education beyond high school are not a prerequisite (or the business agrees to hire unqualified persons and train them), and the recipient and the business both take action to give low and moderate income persons first consideration for the opening.

Presumption by location, (a)(4)(iv) and (v). A person may be presumed to be low or moderate income if he or she resides in a qualifying census tract, or in a tract where at least 70 percent of residents are low and moderate income. A job can also be presumed to meet the objective when the assisted business and the job are located in a qualifying tract. A tract qualifies either through an Empowerment Zone or Enterprise Community designation, or by meeting all three of: a poverty rate of at least 20 percent; exclusion of the central business district from the tract, unless the poverty rate there is at least 30 percent; and one additional distress standard.

Aggregation, (a)(4)(vi). Normally the job count is done business by business. For public facilities and improvements, (a)(4)(vi)(F) sets the dividing line at $10,000 in CDBG funds per permanent full-time equivalent job. Below that figure, only the businesses the facility is principally undertaken for get aggregated into the count. At or above that figure, every business in the service area that locates or expands because of the facility, up to one year after its completion, gets aggregated together, and the combined total has to meet the public benefit standards.

Reading housing and jobs together

Both objectives share a structure worth noticing: a basic count-based rule, one or more carve outs that ease that rule for a specific, named situation, and a presumption mechanism that removes the need for individual-level documentation when a location or category already establishes the low and moderate income connection. Learn the basic rule cold first. The exceptions only make sense once you can see what they are exceptions from.

What this means in practice for GCHS

GCHS's work is overwhelmingly single-family owner-occupied rehabilitation, and the housing objective is where that work belongs, not limited clientele. For a one-unit home the test is simple: the household living there must be low or moderate income, and the file documents it household by household. The multi-unit counting rules become directly relevant the moment a project involves a duplex, a small multifamily building, or any structure with more than one unit, because then the unit count starts to matter. The jobs objective will rarely apply to GCHS's core rehabilitation work, but it belongs in this course because GCHS operates in counties where a partner jurisdiction's broader CDBG program may include economic development activities that this organization coordinates with or comments on as part of the local planning process.

Practice questions

1. Under the housing national objective, a two-unit structure is rehabilitated. How many of the two units must be occupied by a low or moderate income household to qualify?

  1. At least one of the two units
  2. Both units
  3. At least 51 percent, meaning at least 1.02 units
  4. Neither unit needs to be low and moderate income if the structure is owner occupied

2. For rental housing under the housing national objective, occupancy by a low or moderate income household alone is sufficient. True or false?

  1. True, occupancy is the only requirement
  2. False, rental occupancy must also be at affordable rents
  3. True, but only for structures with more than two units
  4. False, rental housing can never qualify under this objective

3. Under the mixed income exception at (a)(3)(i), new construction of multifamily non-elderly rental housing can qualify with fewer than 51 percent low and moderate income units if what minimum share of units goes to low and moderate income households at affordable rents?

  1. 10 percent
  2. 51 percent
  3. 20 percent
  4. 5 percent

4. CDBG funds assist rehabilitation in direct support of a recipient's Rental Rehabilitation program under 24 CFR part 511, covering many separate properties. Under (a)(3)(ii), how is the 51 percent low and moderate income test applied?

  1. Separately to each individual property, with no exceptions permitted
  2. Only to the single largest property in the program
  3. Never, because rental rehabilitation programs are exempt from the housing objective altogether
  4. To the units assisted by the program overall, not to each individual property

5. Under the jobs national objective at 570.208(a)(4), what share of jobs created or retained, on a full-time equivalent basis, must be held by or available to low and moderate income persons?

  1. 51 percent
  2. 25 percent
  3. 70 percent
  4. 100 percent

6. For a job retention activity under (a)(4)(ii), what must the recipient show about a job that is not currently held by a low or moderate income person, in order for it to count toward the 51 percent?

  1. Nothing further; any retained job counts automatically
  2. That it can reasonably be expected to turn over within two years, with steps taken to fill it with a low or moderate income person
  3. That the job will be eliminated within one year regardless
  4. That the employer has signed a Section 3 agreement

7. Under the "available to" provision at (a)(4)(iii), a job counts toward the 51 percent without being currently held by a low or moderate income person only if which two conditions both hold?

  1. The job pays no more than minimum wage and is part time, so no special skills are needed and no further action is required
  2. The employer is a nonprofit organization and the job is covered by a union agreement
  3. The job needs no special skills beyond high school, or the business will train, and the recipient and business give low and moderate income persons first consideration
  4. The job is located within a designated Empowerment Zone or Enterprise Community only, whatever skills it needs, whoever fills it, and whatever the employer does to recruit

8. What three conditions can make a census tract presumed to qualify under (a)(4)(v), absent an Empowerment Zone or Enterprise Community designation?

  1. A poverty rate of at least 20 percent, exclusion of the central business district unless its poverty rate is at least 30 percent, and one additional distress standard
  2. Population under 5,000, a poverty rate above 10 percent, and an active TxCDBG grant
  3. Median household income under 30 percent of area median, unemployment above 15 percent, and a state disaster declaration
  4. A poverty rate of at least 51 percent and no other conditions

9. For public facilities under the aggregation rule at (a)(4)(vi)(F), what is the CDBG cost per permanent full-time equivalent job that decides whether only principal beneficiaries are aggregated, or all businesses in the service area are aggregated?

  1. $2,000 per job
  2. $25,000 per job
  3. $100,000 per job
  4. $10,000 per job

10. GCHS rehabilitates a triplex, a structure with three units. Under the housing national objective, what share of the units must be low and moderate income occupied?

  1. All three units
  2. At least 51 percent of the units, meaning at least two of the three
  3. Only one unit, the same rule as a duplex
  4. None specifically, as long as the building is primarily residential

11. Why does the mixed income exception at (a)(3)(i) exist, according to this lesson?

  1. Because multifamily housing is never eligible for CDBG funding unless the entire development is income restricted
  2. Because HUD requires all new construction to be income restricted regardless of CDBG involvement, so CDBG only ever fills the financing gap left after other subsidies
  3. Because requiring 51 percent low and moderate income occupancy on every new multifamily project would make CDBG participation in mixed income development impractical
  4. Because elderly housing is exempt from the housing national objective entirely, so mixed income projects are treated as elderly housing

12. A GCHS-adjacent jurisdiction's CDBG program funds a public facility built principally for a few businesses, at a CDBG cost of $8,000 per permanent full-time equivalent job created. Under the aggregation rule, how is the job count for public benefit purposes assembled?

  1. Only the businesses that are the activity's principal beneficiaries are aggregated, since the figure is below $10,000 per job
  2. Every business in the service area within one year of completion is aggregated automatically
  3. No aggregation applies at any dollar figure below $25,000 per job
  4. The public facility is automatically ineligible below $10,000 per job

13. Under the housing national objective, what must be true of a one-unit structure to qualify?

  1. At least 51 percent of the unit must be low and moderate income, an impossible fraction
  2. Nothing; one-unit structures are automatically exempt from this objective
  3. Two units must be verified, doubling the standard rule
  4. The single unit itself must be occupied by a low or moderate income household

14. Under (a)(4)(iv) and (v), a person residing in a qualifying census tract may be presumed to be low or moderate income for the jobs objective. Which designation alone is enough to make a tract qualify, without needing to meet the poverty-rate test?

  1. A TxCDBG-funded project location
  2. An Empowerment Zone or Enterprise Community designation
  3. A FEMA-declared disaster area
  4. A qualified census tract for Low Income Housing Tax Credit purposes

Glossary

Housing national objective
570.208(a)(3): qualifies an activity when assisted housing is or will be occupied by low and moderate income households, counted unit by unit.
Jobs national objective
570.208(a)(4): qualifies an activity when a majority of jobs created or retained, on a full-time equivalent basis, are held by or available to low and moderate income persons.
Mixed income exception
(a)(3)(i): lets new multifamily non-elderly rental housing qualify with fewer than 51 percent low/moderate income units if at least 20 percent are affordable to LMI households and cost share is capped.
Rental rehabilitation program
(a)(3)(ii): for rehabilitation supporting a Rental Rehabilitation program under 24 CFR part 511, applies the 51 percent housing test to the units assisted across the whole program rather than to each property.
Job retention
(a)(4)(ii): counts a saved job toward the 51 percent if it is currently LMI-held, or expected to turn over within two years with steps to fill it with an LMI person.
"Available to"
(a)(4)(iii): a job counts without being currently held by an LMI person if special skills beyond high school are not a prerequisite (or the business will train), and LMI persons get first consideration.
Aggregation (public facilities)
(a)(4)(vi)(F): at or above $10,000 in CDBG funds per permanent FTE job, every business in the service area that locates or expands, up to a year after completion, is aggregated into the count.
Previous lesson Next lesson