Residential Electrical 100%

Practice exam

Residential Electrical Practice Exam

60 questions · 120 minutes · aim for 70 percent · drawn fresh every sitting

This practice exam draws 60 questions from a 400-question bank covering all 14 lessons, with each of the 6 topic areas represented in proportion to its share of the bank: general requirements, services and grounding, branch circuits and feeders, wiring methods, devices, luminaires and appliances, and pools, spas and hot tubs. Question order and answer order are shuffled every time you sit it.

This is GCHS practice, not an official test. It checks what you have retained from the lessons, based on the 2021 IRC and the 2020 NEC it follows. Treat it as open book if you like: in the field you will have the adopted code and its local amendments in hand, and knowing where to look matters as much as memorized numbers.

Rules

Back to Lesson 14 Course hub