This lesson closes out the prescriptive path's mandatory and required-elective provisions with two
short but consequential sections: lighting, which is cheap to get right and easy for a rehab crew to
get wrong by installing whatever bulb is on hand, and the additional efficiency package, a 2021 IECC
addition that requires every prescriptive-path house to do something measurably better than the bare
minimum envelope and equipment tables in Lessons 2 through 7. Neither section involves much math, but
both show up on nearly every energy final GCHS performs.
High-efficacy lighting
R404.1 requires a minimum percentage of permanently installed lighting fixtures to contain only
high-efficacy light sources. The 2021 IECC set that requirement at 100 percent, a ratchet up from 90
percent in the 2018 edition and 75 percent in the 2015 edition before that, which is exactly the kind
of number that trips up anyone working from an older field guide or a memory of an earlier course.
The requirement applies to permanently installed fixtures: the recessed cans, wall sconces, and
ceiling fixtures that are part of the house, not table lamps or other portable fixtures a homeowner
brings in after move-in. There is one narrow, specific exclusion: kitchen appliance lighting, such as
the lamp inside a range hood, oven, or refrigerator, is excepted, because those are specialty products
that are not generally available in high-efficacy form. General kitchen lighting, including the
ceiling fixture over the counter, is fully covered by the 100 percent requirement.
Key numbers
High-efficacy lighting, permanently installed fixtures: 100% (2021 IECC), up from 90% (2018) and 75% (2015); kitchen appliance lighting excluded (R404.1)
Interior lighting controls: permanently installed fixtures require a dimmer, an occupant sensor control, or another control installed or built into the fixture, with exceptions for bathrooms, hallways, exterior lighting, and lighting designed for safety or security (R404.2)
Additional efficiency package: one option required on the prescriptive path (R401.2.5), from R408.2: total UA and SHGC at 95 percent or less of Table R402.1.2; 95 AFUE furnace with 16 SEER air conditioner, 10 HSPF/16 SEER heat pump, or 3.5 COP ground source heat pump; 0.82 EF fossil fuel, 2.0 EF electric, or 0.4 solar fraction water heating; 100 percent of ducts and air handlers inside the envelope; or 3.0 ACH50 with an ERV or HRV at 75 percent sensible recovery efficiency or better
Documentation for the additional efficiency package: the option selected is identified on the certificate required by R401.3
Pools and spas (R403.10): no continuously burning pilot on gas heaters; outdoor heated pools and spas need a vapor-retardant cover unless more than 75 percent of the heating energy comes from a heat pump or on-site renewable energy
Interior lighting controls
The 2021 IECC edition also added a lighting control requirement that did not exist in earlier
editions: permanently installed interior lighting fixtures generally require a dimmer, an occupant
sensor control, or a control that is integral to the fixture itself. The purpose is straightforward,
to reduce the energy wasted by lights left on in an empty room, but the requirement is not universal.
Bathrooms, hallways, exterior fixtures, and lighting designed for safety or security are
excepted from the control requirement (R404.2), on the reasoning that those fixtures are either used briefly
and repeatedly (a hallway) or need to stay available regardless of occupancy sensing (security
lighting). A general living room or bedroom ceiling fixture is squarely inside the requirement and is
one of the more commonly missed items on a lighting plan, since older lighting layouts assumed a
simple wall switch and nothing more. Exterior lighting has its own control rule in R404.3: where the
permanently installed exterior lighting totals more than 30 watts, it needs a manual on-off switch that
permits automatic shut-off, and it must shut off automatically when daylight is present.
Gas pool heaters, pilot lights, and pool covers
R403.10, at the end of the mechanical provisions covered in Lesson 7 but grouped with lighting and
efficiency here as an equipment-adjacent item worth knowing, controls the energy use of pools and
permanent spas. Heaters need an on-off switch that is part of the heater and mounted on its exterior
with ready access, or one located outside the heater within 3 feet of it, and using the switch must not
change the thermostat setting. Gas-fired heaters may not be equipped with continuously burning ignition
pilots (R403.10.1), which would burn fuel around the clock for no useful output. Heaters and pump motors
also need time switches or other controls that turn them on and off on a preset schedule (R403.10.2).
Outdoor heated pools and outdoor permanent spas must have a vapor-retardant cover or other approved
vapor-retardant means, since evaporation is the dominant heat loss mechanism for a heated body of water
sitting exposed to outdoor air (R403.10.3); the exception applies where more than 75 percent of the
heating energy, computed over an operating season of at least three calendar months, comes from a heat
pump or an on-site renewable energy system. Separately, R404.1.2 bars continuously burning pilot lights
on fuel gas lighting systems. GCHS rarely scopes pool work directly, but a rehab or
inspection that touches an existing pool heater should still flag a missing cover or a standing pilot
as a code item, not just a comfort or cost suggestion to the homeowner.
The additional efficiency package
R408.2 is new to the 2021 IECC and is one of the edition's most consequential changes for anyone
following the prescriptive path (R402 through R404): rather than stopping once every table in
Lessons 2 through 4 and every equipment and lighting requirement in Lessons 6 through 8 is met, the
prescriptive path now also requires the house to install one additional efficiency package option
from a defined menu of five (R401.2.5 and R408.2). The menu is: an enhanced envelope, with total
building UA and area-weighted glazing SHGC each at 95 percent or less of the Table R402.1.2 values
(R408.2.1); more efficient HVAC equipment, meaning a 95 AFUE gas furnace with a 16 SEER air conditioner,
a 10 HSPF/16 SEER air source heat pump, or a 3.5 COP ground source heat pump (R408.2.2); reduced-energy
service water heating, meaning a fossil fuel system of 0.82 EF or better, an electric system of 2.0 EF or
better (which a heat pump water heater can reach), or a solar system with a 0.4 solar fraction
(R408.2.3); a more efficient duct system, meaning 100 percent of ducts and air handlers inside the
building thermal envelope, a ductless or hydronic system inside the envelope, or ducts in conditioned
space as R403.3.2 defines it (R408.2.4); or improved air sealing with efficient ventilation, meaning a
measured 3.0 ACH50 or less together with an ERV or HRV of at least 75 percent sensible recovery
efficiency (R408.2.5). The point for GCHS's purposes is that this requirement exists, that it applies
to every prescriptive-path house, and that it is not satisfied automatically just because the rest of
the prescriptive tables are met. A permit set that shows compliant insulation, fenestration, ducts,
and equipment but never identifies which R408.2 option the house is using is missing a mandatory
piece of the compliance package, not an optional bonus.
The other compliance paths carry their own version of the same requirement. Under R401.2.5, the
2021 edition's additional efficiency section applies to every compliance approach: a prescriptive
house (including one using the total UA alternative) installs one R408.2 option; a house on the
total building performance path under R405 either installs an R408.2 option without counting it in the
model or shows an annual energy cost no more than 95 percent of the standard reference design; and a
house on the Energy Rating Index path under R406 must score at least 5 percent below the ERI target in
Table R406.5. The option selected is identified on the certificate required by R401.3. Lesson 9 covers
how each performance path documents that extra step.
In the field
A recurring finding on a GCHS energy final is a handful of recessed cans in a kitchen or hallway
still holding old incandescent or halogen lamps, left over from a partial remodel where the electrician
swapped fixtures but a punch-list item to swap bulbs got missed. It is an easy, cheap fix, but it is
still a code deficiency at final inspection under the 100 percent standard, and GCHS flags it the same
way it would flag a missing duct insulation section: correct before sign-off, not noted and waived.
Lighting is checked fixture by fixture; the R408.2 package is checked as a single selection, named on the certificate, that every prescriptive-path house must carry.
Practice questions
1. Under the 2021 IECC R404.1, what percentage of permanently installed lighting fixtures must contain only high-efficacy light sources?
75 percent
90 percent
100 percent
There is no fixed percentage
Answer: c. The 2021 IECC requires 100 percent, up from 90 percent in 2018 and 75 percent in 2015; always confirm which edition a source is describing.
2. Which lighting is excluded from the high-efficacy requirement under R404.1?
All bathroom lighting, since bathrooms are excepted from the lighting controls rule
Kitchen appliance lighting, such as range hood and oven lamps
All exterior lighting on the dwelling, including porch and garage fixtures
All hallway lighting, since hallways are excepted from the lighting controls rule
Answer: b. R404.1 excludes only kitchen appliance lighting fixtures; general kitchen lighting, including the main ceiling fixture, is fully covered. The bathroom and hallway exceptions belong to the interior lighting controls rule (R404.2), not to R404.1.
3. An energy final finds several permanently installed recessed cans in a living room fitted with incandescent lamps. The correct finding is:
Acceptable, since lighting is only checked at rough-in and not at the final inspection
Acceptable, since only exterior lighting is regulated by the energy code
Acceptable if fewer than five fixtures are affected in the room
A deficiency, since living room fixtures are not excepted from R404.1
Answer: d. Living room fixtures fall squarely under the 100 percent high-efficacy requirement; this is a common and inexpensive finding to correct before sign-off.
4. Under R404.2, a permanently installed interior lighting fixture generally must be controlled with:
A dimmer, an occupant sensor, or another control installed or built into the fixture
A dedicated circuit with its own breaker in the panel for each fixture
A mechanical timer switch as the only permitted control type
No control of any kind, since interior lighting is not regulated
Answer: a. R404.2 is new to the 2021 edition and applies alongside the high-efficacy requirement, not in place of it. Bathrooms, hallways, exterior fixtures, and lighting designed for safety or security are excepted.
5. Which of the following is excepted from the interior lighting control requirement?
A living room ceiling fixture
A bedroom fixture
A hallway fixture
A den fixture
Answer: c. R404.2 excepts bathrooms, hallways, exterior fixtures, and lighting designed for safety or security; general living space fixtures are not excepted.
6. A gas-fired pool heater is installed with a continuously burning pilot light. Under the energy code (R403.10.1) this is:
Permitted if the pool is heated year round and the heater has an on-off switch
Not permitted; gas heaters may not have continuously burning pilots
Permitted in Climate Zone 2 only, where freezing is rare
Permitted if a timer on the gas supply shuts the pilot off overnight
Answer: b. A standing pilot burns fuel continuously for no useful output most of the time. R403.10.1 prohibits continuously burning ignition pilots on gas-fired heaters and requires an on-off switch that is part of the heater or within 3 feet of it.
7. Outdoor heated pools and outdoor permanent spas are generally required to have:
A minimum water temperature of 90 degrees F, held by a thermostat lockout
A vapor-retardant cover, unless a heat pump or renewables supply over 75 percent of heating
Continuous filtration around the clock, whatever the season or use
A dedicated backup generator so the heater can run during outages
Answer: a. Evaporation is the dominant heat loss from a heated pool. R403.10.3 requires a vapor-retardant cover, and the exception applies where more than 75 percent of the heating energy, over an operating season of at least three months, comes from a heat pump or on-site renewable energy.
8. R408.2, new to the 2021 IECC, requires a prescriptive-path house to:
Meet only the R402 envelope table, with no further requirement beyond Table R402.1.3
Install one option from the R408.2 additional efficiency menu and identify it on the certificate
Run a full Energy Rating Index model in addition to complying with the prescriptive path
Install rooftop solar panels sized to offset at least half the annual electric load
Answer: b. R401.2.5 makes the additional efficiency package a mandatory required-elective on the prescriptive path: one of the five R408.2 options, on top of the standard prescriptive tables, identified on the R401.3 certificate.
9. Which of the following is NOT generally among the R408.2 additional efficiency package options?
An enhanced building envelope beyond the R402.1.3 minimums
More efficient HVAC equipment than the code baseline
A reduced-energy service hot water system
A larger garage
Answer: d. The R408.2 menu is an enhanced envelope, more efficient HVAC equipment, reduced-energy service water heating, a more efficient duct distribution system, and improved air sealing with an ERV or HRV; garage size is unrelated.
10. A permit set shows compliant insulation, fenestration, ducts, and equipment on the prescriptive path but never identifies an R408.2 option. This submittal is:
Incomplete; R401.2.5 requires one R408.2 option on the prescriptive path
Complete, since R408 is an optional chapter that applies only to performance-path homes
Complete, since meeting the R402 insulation and fenestration tables alone is sufficient
Incomplete only in Climate Zone 3 and above, where the tightest envelope limits apply
Answer: a. Meeting the envelope, equipment, and lighting tables is not sufficient on the prescriptive path without also installing an R408.2 option, and the option must be identified on the certificate.
11. Which compliance path must always install one of the R408.2 options, with no alternative under R401.2.5?
The Energy Rating Index path
The prescriptive path
The total building performance (simulated) path
All three paths equally
Answer: b. The prescriptive path installs one R408.2 option. The total building performance path may install an option or instead beat the reference design energy cost by 5 percent, and the ERI path must score 5 percent below its target (R401.2.5), so only the prescriptive path is locked into an R408.2 option.
12. What does a code official look for to confirm the additional efficiency requirement has been met on a prescriptive-path house?
A signed statement from the builder that the house exceeds code, with no option named
The blower door report alone, since it shows the house is tighter than the code requires
The selected R408.2 option, identified on the R401.3 certificate with its supporting specification
Nothing further; the option is self-certifying once the house is permitted
Answer: c. R401.2.5 requires the option selected to be identified on the R401.3 certificate, and the specification behind it, such as the equipment efficiency rating or the envelope UA calculation, is what lets the official verify it.
13. A common way to meet the reduced-energy service hot water option under R408.2.3 (2.0 EF or better for an electric system) is:
A heat pump water heater
A larger conventional gas tank water heater
Adding a second water heater
Removing the water heater's insulation blanket
Answer: a. A heat pump water heater is a commonly used way to satisfy the option, since it uses substantially less energy than a standard electric resistance or gas unit and can reach the 2.0 EF electric threshold.
14. GCHS finds a partial remodel where an electrician swapped several recessed can fixtures but left old halogen lamps installed. At an energy final under the 2021 IECC, this is:
Not a code item, since the code regulates fixtures, not the lamps placed in them
Acceptable, since halogen lamps count as high-efficacy under the 2021 definitions
Acceptable if the homeowner agrees in writing to change the bulbs after occupancy
A deficiency; the fixtures must hold high-efficacy sources
Answer: d. Halogen and incandescent lamps do not meet the high-efficacy standard; GCHS treats this the same as any other code deficiency, correcting it before sign-off rather than waiving it.
Glossary
High-efficacy light source
A lamp type meeting the code's efficacy standard, generally LED or equivalent products in current residential practice; required in 100 percent of permanently installed fixtures under the 2021 IECC.
Permanently installed fixture
A lighting fixture that is part of the building, as distinct from a portable lamp a homeowner brings in after occupancy; only permanent fixtures are regulated by R404.1.
Additional efficiency package
The R401.2.5 and R408.2 requirement, new to the 2021 IECC, that a prescriptive-path house install one efficiency option beyond the base envelope, equipment, and lighting tables and identify it on the certificate.
Required elective
A code provision offering a menu of options where selecting at least one from the menu is mandatory, as distinct from a true optional item.
Vapor-retardant cover
A pool or spa cover that limits evaporative heat loss, required on outdoor heated pools and outdoor permanent spas unless more than 75 percent of the heating energy comes from a heat pump or on-site renewable energy (R403.10.3).
Simulated performance / Energy Rating Index paths
The performance-based compliance paths covered in Lesson 9. They do not have to install an R408.2 option, but R401.2.5 gives each its own additional-efficiency step.