HRA courseField workbook100%

Sources, updates and hold points

Reviewed October 4, 2026. The supplied HRA-FACTS.md is preserved unchanged. This register distinguishes directly checked updates from inherited research and transaction-specific questions. A live link does not guarantee its contents will remain unchanged.

Material corrections to the earlier research

Authorities and verification notes

TDHCA HRA program overview

Live page reviewed October 4, 2026. Program scope and income ceiling.

Open official source

Texas Register: September 18, 2026 adopted rules

Chapter 23 replacement adopted without changes; effective September 24, 2026. TRD-202603872. Also publishes 20.16 and Chapter 21 repeal.

Open official source

10 TAC 23.20–23.29: text adopted without changes

Read with September adoption notice. Verified cash reserve, HOTMA date, paragraph numbering, Contract setup benchmark, cost and design text. Effective September 24, 2026.

Open official source

10 TAC Chapter 23: current official rule portal

Directly read live official portal October 4, 2026: 23.30 and 23.31, source notes February 26, 2025. Verified activity categories, grant/loan terms, title age, income evidence, draw and retainage requirements.

Open official source

10 TAC Chapter 20: current official rule portal

Directly read live official portal October 4, 2026: 20.7, 20.8, 20.9 and 20.14, source notes March 28, 2024. Verified taxes, certified plans, selection, marketing, denials, inspections and monitoring. The 20.7 cross-reference still says Chapter 21; read with the September 2026 repeal and new 20.16.

Open official source

10 TAC 20.16: adopted energy standards

Effective September 24, 2026. Federally funded non-CDBG commitments on/after October 1, 2025: 2021 IECC or federally approved alternative. Separate state requirement.

Open official source

HUD HOME FAQs: current energy clarification

Reviewed October 4, 2026. Explains March 5 court decision and May 1 rescission; restored federal 2009 IECC baseline for single-family/low-rise housing. Does not itself repeal Texas requirements.

Open official source

24 CFR Part 92: HOME regulations

eCFR displayed Title 24 current through October 1, 2026. Reviewed definitions, labor and retention provisions; use section-specific dates and notes.

Open official source

HUD HOME rule effective-date history

April 29, 2026 issue: specified 92.250 and 92.253 amendment instructions delayed indefinitely. Do not describe all 2025 HOME changes as delayed.

Open official source

TDHCA RSP Application Submission Procedures Manual

Linked live application-page PDF displays UPDATED 04/2026, despite the page label/filename suggesting March. Reviewed electronic submission, completeness and review requirements.

Open official source

TDHCA current HOME application materials

Reviewed October 4, 2026. The 2027 SFD listing does not establish a new HRA funding window. Confirm current HRA availability before intake.

Open official source

TDHCA HRA administration and participating-jurisdiction resources

Use the currently linked PJ information and written address-level boundary confirmation. The old county list alone is not sufficient.

Open official source

TDHCA HRA Project File Documentation Checklist

Live checklist retrieved October 4, 2026. Use its current stage-specific submission and retention instructions. Course worksheets are not official substitutes.

Open official source

TDHCA construction standards resources

Applicable TMCS edition requires TDHCA confirmation; the supplied research found 2015 and 2021 versions. Do not teach old equipment figures as current.

Open official source

TDHCA Single Family Environmental Review Process

Process resource identified in supplied October 3 research. Confirm responsible roles, review level and project-specific clearance in writing.

Open official source

24 CFR Part 58: environmental review

Section 58.22 choice-limiting restrictions; use the applicable responsible-entity determination. Scope changes need review.

Open official source

EPA residential-demolition asbestos interpretation

Official letter identified in supplied research. Grouped demolitions can require broader review; seek current project-specific EPA/DSHS/TDHCA direction.

Open official source

HUD 2026 Section 3 threshold adjustment

91 FR 6752, February 13, 2026; general housing/community-development threshold $300,000, effective March 16, 2026. Project definition and funding applicability remain essential.

Open official source

49 CFR Part 24: relocation regulations

Owner/tenant distinctions documented in supplied October 3 research. Obtain specific HRA temporary-housing funding and notice instructions.

Open official source

TDHCA current HRA subsidy and value limits

Use current linked tables at the actual decision date. Rule base-cost examples do not certify that no Board adjustment exists.

Open official source

Resolve before the affected action

Participation and funding

Confirm the executed GCHS HRA RSP agreement, approved service area and currently available HRA funding window before funded intake.

Current operating limits

Confirm any Board-adjusted activity caps and current income, subsidy and homeownership value tables at the decision date.

Income and PRWORA

Obtain current single-family HOME HOTMA instructions, applicable household/asset treatment and nonprofit PRWORA/SAVE direction.

TMCS and energy

Confirm the applicable TMCS edition and the actual Texas/local/federal energy compliance pathway and acceptable proof.

Environmental roles and hazards

Confirm Responsible Entity, consultation roles, clearance scope and asbestos applicability, including grouped demolitions.

Moves and return

Resolve owner temporary-housing eligibility, source of payment, required notices and any tenant displacement before moves.

Geography and Section 3

Obtain address-level PJ-boundary determinations and any necessary HRA project-grouping interpretation.

Closing and changes

Confirm actual assistance terms, approved documents, change-order delegation, amendments and local household review procedures.