IASSC Body of Knowledge 4.3, Designed Experiments · 14 practice questions
0:00 / --:--
Reading
Green Belt closed with correlation, regression, and control charts, all
tools that observe X and Y as they naturally occur. Black Belt opens with a
different move: deliberately changing X to see what happens to Y. The IASSC Certified Lean Six Sigma Black Belt exam is 150 graded questions (some forms add up to 15 ungraded ones), closed book, with a 4 hour time limit and a 70 percent score required to pass, at roughly 30 questions from each DMAIC phase. What Black Belt adds beyond Green
Belt is concentrated in two places: a full treatment of designed
experiments, starting with this lesson, and a deeper, Black-Belt-level
treatment of statistical process control later in this tier. This lesson
covers the first half of the Body of Knowledge's Designed Experiments
section: what an experiment is trying to accomplish, the vocabulary used to
describe one, why changing one factor at a time falls short, and the
practical considerations that go into planning a good one.
One-factor-at-a-time testing walks only a cross-shaped path through the combinations of two factors, leaving the off-path corners, where an interaction between the factors would appear, completely untested. A full factorial design tests every combination.
What Black Belt adds to Green Belt
Green Belt's Analyze and Improve tool set is built almost entirely around
observing X's and Y's that already exist in the process: a hypothesis test
compares groups that already differ, a regression fits a line through data
that was already collected. Black Belt's central addition is the ability to
deliberately assign values to the X's and watch what happens, which is a
fundamentally stronger form of evidence for cause and effect. The second
major addition, covered later in this tier, is a deeper treatment of
control charts and control strategy at the level a Black Belt is expected
to design and defend, rather than simply run.
Why run an experiment: four objectives
Every designed experiment starts by naming which of four objectives it is
after, because the objective drives how many factors, levels, and runs the
design needs:
Screening: with many candidate factors and limited
budget, find which few actually matter before investing further. A GCHS
example: testing five candidate variables in a concrete cure process
(mix ratio, ambient temperature, humidity, cure time, additive dosage) to
find the two or three that actually move strength.
Characterization or modeling: for the factors that
matter, build a mathematical model of how they drive the response, so
predictions can be made at settings not directly tested.
Optimization: find the specific factor settings that
produce the best response, such as the primer-and-cure-temperature
combination that maximizes paint adhesion.
Robustness: find factor settings where the response
stays good even as uncontrollable noise factors, like weather during an
exterior paint job, vary.
The vocabulary of an experiment
A short, precise vocabulary describes every experiment, and exam
questions frequently test whether these terms are being used correctly:
Term
Meaning
GCHS example
Factor
An input variable deliberately set by the experimenter
Primer type, cure temperature
Level
A specific value a factor is set to
Primer type A vs primer type B
Response
The measured output, the Y
Adhesion score, mailing response rate
Run
One execution of the experiment at a specific combination of factor levels
One test panel painted with primer A at high cure temperature
Treatment
A specific combination of factor levels applied in a run
Primer A, high temperature
Effect
The change in the response caused by changing a factor's level
How much adhesion changes moving from primer A to primer B
Interaction
When one factor's effect on the response depends on the level of another factor
Primer B only outperforms A at high cure temperature
Noise
A factor that affects the response but is not, or cannot be, controlled by the experimenter
Outdoor humidity on the day a mailing's response rate is being tested
Why one-factor-at-a-time (OFAT) testing falls short
The intuitive way to test two factors is to hold one fixed and vary the
other, find its best level, then hold that fixed and vary the second. This
is one-factor-at-a-time testing, and the diagram above shows its structural
flaw: OFAT only ever tests along a cross-shaped path through the space of
combinations. It never tests the corners, the combinations where both
factors are away from the starting point at once, which is exactly where an
interaction between the two factors shows up. A GCHS work-order scheduling
team testing "batch size" and "dispatch time" one at a time could easily
miss that a large batch dispatched early performs far better than either
factor's individually best level would predict, because that combination
was never run. A full factorial design, testing every combination, is the most direct way to detect an interaction with confidence (a well-chosen fractional design can estimate some interactions too, as Lesson 4 shows).
Why this matters
If an exam question describes a team optimizing factors one at a time and
missing a real interaction, the concept being tested is almost always OFAT's
blind spot, not a calculation error.
Randomization, replication, and repetition
Three related but distinct practices protect an experiment's validity.
Randomization means running the treatments in a random
order rather than a convenient one, so that an unmeasured factor that drifts
over time, such as ambient shop temperature rising through the day, does
not get confused with a real factor effect. Replication
means independently repeating an entire run, including resetting factor
levels and any setup steps, which captures the true run-to-run variation and
lets the experiment estimate experimental error honestly.
Repetition (sometimes called repeated measurement) means
taking multiple readings from the same single run without resetting
anything, which only captures measurement variation, not the process's true
variation between runs. Treating repetitions as if they were replicates
understates the real error and is a common design mistake.
Blocking groups runs by a known source of variation that
is not a factor of interest, such as which crew or which day a batch of
concrete panels was poured, so that variation from that source is removed
from the comparison between factor levels rather than confused with it.
The reading distinguishes random run order, independent new runs, and repeated measurements. Repeated measurements do not substitute for independent replicates.
Design considerations: planning before running
Before any run happens, four practical questions shape the design:
choosing which factors and levels are worth testing, based on engineering
knowledge and the screening step's results; confirming the measurement
system is adequate, since Gage R&R applies here exactly as it did in
Measure, because noisy measurements can hide a real factor effect or
manufacture a fake one; sizing the sample, meaning the number of
replicates, with enough power to detect an effect of practical importance
against the response's natural variation; and sequential experimentation,
meaning starting with a smaller screening design and adding runs only as
needed, rather than committing to one large, expensive design up front
before anything is known. A GCHS example: before running a full factorial
test of four mailing-response factors (headline, offer, envelope color,
send day), the team would first confirm response rate can be measured
consistently, then run a smaller screening design to narrow four factors to
the two or three worth a fuller study.
Practice questions
1. What is the format of the IASSC Certified Lean Six Sigma Black Belt exam?
60 questions, 2 hours, open book, with roughly 12 questions per DMAIC phase
200 questions, 5 hours, no pass mark
100 questions, closed book, no pass mark set
150 questions, 4 hours, closed book, 70 percent to pass
Answer: d. The IASSC Black Belt exam is 150 graded questions with a 4 hour limit, closed book, and a 70 percent pass mark, at roughly 30 questions from each DMAIC phase.
2. What is the central capability Black Belt adds beyond Green Belt's Analyze and Improve tool set?
Deliberately setting X's in designed experiments, not just observing them
Value stream mapping of material and information flow through an entire process, start to finish
A new version of the DMAIC acronym
Basic descriptive statistics such as mean, median, and standard deviation
Answer: a. Black Belt's central addition is designing experiments that deliberately set factor levels, a stronger form of evidence for cause and effect than observational tools like regression.
3. A team has many candidate factors and a limited budget, and wants to find which few actually matter. Which experimental objective fits?
Screening
Optimization
Robustness
Characterization
Answer: a. Screening is used to narrow a long list of candidate factors down to the few that actually drive the response, before further, more detailed study.
4. A team wants factor settings where paint adhesion stays good even as outdoor humidity varies uncontrollably. Which objective is this?
Screening
Characterization
Optimization
Robustness
Answer: d. Robustness seeks factor settings where the response stays acceptable despite variation in uncontrolled noise factors.
5. In an experiment testing cure temperature's effect on concrete strength, what is "cure temperature" called?
The response
A factor
A replicate
A block
Answer: b. Cure temperature is an input variable deliberately set by the experimenter, which is the definition of a factor.
6. Primer B only outperforms primer A when cure temperature is high, but performs worse than A at low temperature. What does this describe?
A replicate, meaning an independent repeat of the same run
An interaction, since primer B's advantage depends on cure temperature
Measurement system error, meaning the gauge itself is adding variation to every reading
A main effect of cure temperature only, with primer having no influence at all
Answer: b. When one factor's effect on the response depends on the level of another factor, that is an interaction, exactly the pattern described.
7. What is the key structural weakness of one-factor-at-a-time (OFAT) testing?
It cannot be used with continuous data
It always produces a lower response than a factorial design would, whatever the settings tested
It never tests the combinations where an interaction between factors would show up
It can only be used when exactly two factors are studied
Answer: c. OFAT only tests a cross-shaped path through the combinations, never the off-path corners, which is exactly where a real interaction between two factors would be visible.
8. A team runs the same experimental treatment order every single time it repeats a study, for convenience. What risk does this create?
It guarantees a larger effective sample size, since repeating one order adds runs to the design
It eliminates the need for replication, because a fixed order already averages out run-to-run noise
No risk; run order never matters
A factor that drifts over time, such as shop temperature, can be confused with a real effect
Answer: d. Randomizing run order protects against a time-drifting factor being confused with a true treatment effect; running a fixed order removes that protection.
9. A team takes five readings from the same single concrete panel without resetting the mix or cure setup. What is this called, and what does it fail to capture?
Randomization; it protects against a time-drifting factor by shuffling the run order
Replication; it fully captures run-to-run variation across independent setups
Blocking; it removes a known source of variation such as crew or day from the comparison
Repetition; it captures only measurement variation, not true run-to-run variation
Answer: d. Repeated measurements from one run, without resetting factor levels, capture only measurement variation and understate the true variation between independent runs.
10. A concrete adhesion study pours test panels across three different crews on three different days. What technique correctly separates crew/day variation from the factor effects being studied?
Repetition
Treating crew as the response variable
Blocking on crew or day
Ignoring crew and day entirely
Answer: c. Blocking groups runs by a known, non-factor source of variation, such as crew or day, so that source is removed from the comparison rather than confused with the factor effects.
11. Before running a full factorial test of a mailing's response rate, why should the team first confirm the measurement system is adequate?
Noisy measurements can hide a real factor effect or manufacture a fake one
Measurement system adequacy matters for control charts but is unrelated to designed experiments
It replaces the need for randomization, since a good gauge removes any time-related drift
It is only relevant when the response is attribute data rather than continuous data
Answer: a. As in the Measure phase, an unreliable measurement system undermines everything built on top of it, including a designed experiment's conclusions.
12. What does "sequential experimentation" recommend?
Starting with a smaller screening design and adding further, more detailed runs only as needed
Never repeating any experiment once run
Randomizing run order only on the final replicate
Running every possible factor and level combination in one enormous design up front
Answer: a. Sequential experimentation builds understanding in stages, starting small and adding runs as the data justifies it, rather than committing to one large design before anything is known.
13. In the vocabulary of designed experiments, what is a "treatment"?
A repeated reading from the same run
A specific combination of factor levels applied in a run
The measured output of the experiment
An uncontrolled source of variation
Answer: b. A treatment is the specific combination of factor levels, such as primer A at high cure temperature, applied in a given run.
14. A regression from Green Belt found that crew size predicts work-order cycle time. Why might a Black Belt still want to run a designed experiment rather than rely on that regression alone?
Regression results are always wrong
Designed experiments cannot use continuous responses
The regression was observational; deliberately assigning crew sizes and measuring the result is a stronger basis for a causal claim
There is no reason; the regression is sufficient on its own
Answer: c. An observational regression can show association, but a designed experiment that deliberately assigns crew sizes provides much stronger evidence that the relationship is causal.
Glossary
Factor
An input variable deliberately set by the experimenter, such as primer type or cure temperature.
Level
A specific value a factor is set to during the experiment.
Response
The measured output of the experiment, the Y being studied.
Interaction
When one factor's effect on the response depends on the level of another factor.
One-factor-at-a-time (OFAT)
Testing factors by holding all but one fixed while varying the other; structurally unable to detect interactions.
Replication
Independently repeating an entire run, including resetting setup, to capture true run-to-run variation.
Repetition
Taking multiple readings from a single run without resetting setup; captures only measurement variation.
Blocking
Grouping runs by a known, non-factor source of variation so it is removed from the comparison rather than confused with it.