IASSC Body of Knowledge 4.5, Fractional Factorial Designs · 14 practice questions
0:00 / --:--
Reading
A full 2ᵏ factorial answers every question a team could ask about k
factors, but the run count doubles with every added factor: 5 factors means
32 runs, 7 factors means 128. Most of the time, most of that information is
wasted, because most of the higher-order interactions a full factorial
estimates turn out not to matter. A fractional factorial
design deliberately runs only a fraction of the full factorial, trading away
the ability to estimate every effect cleanly in exchange for a design that
screens many factors in far fewer runs. This lesson covers how that fraction
is chosen, what gets tangled together as a result, and how to tell a strong
fractional design from a weak one.
Alias structure for the half-fraction 2⁴⁻¹ design with generator D = ABC and defining relation I = ABCD.
2ᵏ⁻ᵖ notation and the idea of a fraction
A fractional factorial is written 2ᵏ⁻ᵖ: k is the number of factors, and
p tells how many times the full 2ᵏ design has been cut in half. A
2⁵⁻¹ design studies 5 factors in 2⁵⁻¹ = 2⁴ = 16 runs, a
half fraction of the 32-run full factorial. A 2⁷⁻² design
studies 7 factors in 2⁵ = 32 runs, a quarter fraction of the
128-run full factorial. The larger p is relative to k, the fewer runs the
design costs, and the more effects get tangled together as a result.
Design generators and the defining relation
To build the fraction, one or more high-order interaction columns are
deliberately set equal to a new factor instead of being estimated. In a
2⁴⁻¹ design, the first three factors A, B, and C are run as a full 2³
(8 runs), and the fourth factor D is assigned using the generator
D = ABC: wherever the ABC contrast in the 2³ is at its high level, D is run
high, and wherever ABC is low, D is run low. Multiplying both sides of the
generator by D gives the defining relation: D x D = ABC x D,
and since any letter multiplied by itself cancels (squares to the identity,
written I), this becomes I = ABCD. The defining relation is the single most
important piece of information about a fractional design: everything about
which effects are tangled together follows from it.
Aliasing (confounding): finding it by multiplying through the defining relation
Because D was never run independently of ABC, any effect estimated by the
design is really estimating the combined effect of two or more terms at once,
a relationship called aliasing or confounding.
To find what any effect is aliased with, multiply it by the defining relation
and cancel repeated letters. For I = ABCD:
A x (I = ABCD) gives A = A x ABCD = BCD, so A is aliased with BCD.
AB x (I = ABCD) gives AB = AB x ABCD = CD, so AB is aliased with CD.
Working through every effect the same way for this design gives the full
alias structure: A = BCD, B = ACD, C = ABD, D = ABC, AB = CD, AC = BD, and
AD = BC (shown in the figure above). A significant effect on the "A" contrast
in the data cannot, by itself, tell the team whether A truly matters, or
whether it is really the three-factor interaction BCD driving the result, or
some combination of both; the two are statistically indistinguishable from
this data alone.
Why this matters
The exam frequently gives a defining relation and asks what a specific
effect is aliased with. Multiply the effect by the defining relation,
cancel any letter that appears twice, and whatever remains is the answer.
Resolution: III, IV, and V
A design's resolution is defined as the length (number of
letters) of the shortest word in its defining relation, and it is reported in
Roman numerals as a subscript, such as 24−1IV. Resolution sets a design's
quality at a glance:
Resolution
Meaning
III
Main effects are aliased with two-factor interactions (the shortest defining-relation word has 3 letters)
IV
Main effects are clear of two-factor interactions, but two-factor interactions are aliased with each other (shortest word has 4 letters)
V
Main effects and two-factor interactions are all clear of each other; two-factor interactions are aliased only with three-factor interactions (shortest word has 5 letters)
The 2⁴⁻¹ design above has defining relation I = ABCD, a single 4-letter
word, so it is Resolution IV: exactly matching the pattern of main effects
clear of 2FIs, but 2FIs aliased with each other (AB = CD, AC = BD, AD = BC).
Higher resolution is always preferred when the run budget allows it, because
it keeps more of the effects a team cares about (main effects, and ideally
two-factor interactions) free of confounding.
Sparsity of effects and screening
Fractional designs are defensible because of the sparsity of
effects principle: in most real processes, only a small number of
the possible main effects and low-order interactions actually matter, and
higher-order interactions (three-factor and above) are rarely significant.
Because a fractional design's confounding is engineered to tangle the
important lower-order effects with the unimportant higher-order ones (as
Resolution IV and V designs do), the loss of information is usually
acceptable. This is exactly why fractional factorials are the standard tool
for screening: narrowing a long list of candidate X's down
to the vital few before committing to a full factorial or response surface
study on just those few.
Fold-over: de-aliasing a design
If a screening experiment turns up a significant effect that is aliased
with another effect the team cannot rule out, a second fraction, called a
fold-over, can resolve the ambiguity. A fold-over reverses
the sign of one or more factor columns (a full fold-over reverses every
factor) and runs a second set of trials. Combining the original data with the
fold-over data cancels out the aliasing for the reversed factors, separating
effects that were tangled together in the first fraction. The cost is
essentially a second experiment the same size as the first, so fold-over is
used selectively, on the specific ambiguity that matters, rather than as a
routine step. At GCHS, a team screening rehab defect drivers with a
Resolution III design that flags "crew size" as significant, aliased with a
two-factor interaction it cannot rule out, would fold over rather than act on
an ambiguous result.
Practice questions
1. What does the notation 2⁵⁻¹ describe?
5 factors run in 16 runs, a half fraction of the full 32-run factorial
2 factors run in 5 replicates, giving 10 runs in total across the design
5 center points added to a 2-factor design to test for curvature
5 factors run as a full factorial in 32 runs, with no aliasing among effects
Answer: a. 2⁵⁻¹ = 2⁴ = 16 runs, a half fraction of the 32-run full 2⁵ factorial.
2. What is a design generator?
The standard deviation of the pure error from center points
A synonym for the resolution of the design, written in Roman numerals
A rule assigning a new factor to a higher-order interaction column
The total number of runs in the design, found by counting the aliased pairs
Answer: c. A generator, such as D = ABC, assigns a new factor to an interaction column rather than running it as an independent factor.
3. Given the generator D = ABC, how is the defining relation found?
By replicating the design twice and pooling the aliased effects together
Multiply both sides by D, so D x D = ABC x D, which gives I = ABCD
By computing the ANOVA table for D and reading off its sums of squares
By dividing D by ABC and squaring the result to remove the letters
Answer: b. Multiplying D = ABC by D on both sides gives D² = ABCD, and D² reduces to the identity I, leaving I = ABCD.
4. With defining relation I = ABCD, what is effect A aliased with?
CD
D
AB
BCD
Answer: d. A x ABCD = A² BCD = BCD, so A is aliased with BCD.
5. With defining relation I = ABCD, what is the AB interaction aliased with?
CD
ACD
BCD
ABCD
Answer: a. AB x ABCD = A² B² CD = CD, so AB is aliased with CD.
6. How is a design's resolution defined?
The number of factors in the design minus the number of generators used
The number of center points included in the design's base runs
The total run count divided by the number of factors in the design
The length, in letters, of the shortest word in the defining relation
Answer: d. Resolution is the number of letters in the shortest word of the defining relation.
7. In a Resolution III design, which statement is correct?
Two-factor interactions are clear of everything
Main effects are aliased only with three-factor interactions
Main effects are aliased with two-factor interactions
The design cannot be run in fewer than the full number of runs
Answer: c. Resolution III means the shortest defining-relation word has 3 letters, so main effects are aliased with two-factor interactions.
8. What distinguishes Resolution IV from Resolution III?
Resolution IV cannot be used for screening because it aliases main effects with each other
Resolution IV has no defining relation at all, since every effect is estimated cleanly
Resolution IV keeps main effects clear of two-factor interactions, unlike Resolution III
Resolution IV requires twice as many runs as a full factorial of the same factors
Answer: c. Resolution IV clears main effects of 2FI aliasing, but 2FIs remain aliased with each other.
9. In a Resolution V design, two-factor interactions are aliased with which kind of term?
Nothing; there is no aliasing of any kind
Three-factor interactions
Other two-factor interactions
Main effects
Answer: b. Resolution V clears main effects and two-factor interactions of each other; two-factor interactions alias only with three-factor interactions.
10. A design's defining relation is I = ABCD. What resolution is it, and why?
Resolution IV, because the only word in the defining relation has 4 letters
Resolution V, because a half fraction always has the highest possible resolution
It cannot be determined without running the experiment and checking which effects are confounded
Resolution III, because the design has 4 factors and one generator
Answer: a. The shortest word in I = ABCD has 4 letters, so the design is Resolution IV.
11. What is the sparsity of effects principle?
A process can have at most two significant main effects, however many factors are tested
Only a few main effects and low-order interactions usually matter in real processes
Sparse designs always outperform full factorials for prediction, at any resolution
Every possible interaction in a process is usually significant once enough runs are made
Answer: b. The sparsity of effects principle holds that only a few main effects and low-order interactions typically drive a real process, which is what justifies confounding away the higher-order ones.
12. What is fractional factorial design's main use case in an improvement project?
Replacing the need for a control chart
Estimating pure error only
Confirming a process is normally distributed
Screening a long list of candidate factors down to the vital few before deeper study
Answer: d. Fractional factorials are the standard tool for screening many candidate factors down to the vital few in relatively few runs.
13. What does a fold-over accomplish?
It converts any design directly into a full factorial with no extra runs
It runs a second fraction with reversed signs to de-alias effects
It reduces the total run count of the original experiment by dropping the aliased factor
It replaces the need for a defining relation
Answer: b. A fold-over reverses one or more factor signs and runs a second fraction, whose combined data with the original de-aliases the reversed effects.
14. A GCHS team runs a Resolution III screening design and finds "crew size" significant, but it is aliased with a two-factor interaction they cannot rule out. What is the appropriate next step?
Increase alpha to make the result more significant
Act immediately on crew size since it was significant
Run a fold-over to separate crew size from the aliased interaction before acting
Discard the result since Resolution III designs are never valid
Answer: c. When a significant effect is aliased with something that cannot be ruled out, a fold-over is the standard way to resolve the ambiguity before acting on the result.
Glossary
Fractional factorial
A design that runs only a fraction (such as one-half or one-quarter) of the full 2ᵏ factorial's combinations.
Generator
The rule, such as D = ABC, that assigns a new factor to an interaction column instead of running it independently.
Defining relation
The equation, such as I = ABCD, obtained by multiplying the generator through by the new factor's letter; it determines the design's full alias structure.
Aliasing (confounding)
Two or more effects that cannot be estimated separately because they share the same design column.
Resolution
The length, in letters, of the shortest word in the defining relation; higher resolution means less confounding among low-order effects.
Sparsity of effects principle
The idea that only a small number of main effects and low-order interactions typically matter in a real process.
Fold-over
A second fraction run with reversed factor signs, used to separate effects that were aliased together in the original fraction.