Practice Certification Exam
This practice exam draws 150 questions, 30 from each DMAIC phase, from a 300-question pool spanning every Yellow, Green and Black Belt lesson, shuffled in both question order and answer order every time you sit it. It matches the real IASSC Certified Lean Six Sigma Black Belt exam's question count, time limit, and 70 percent pass mark.
This is not a replica of the real exam. The actual IASSC Black Belt exam is closed book and is taken at a proctored testing center or through PeopleCert online proctoring. This practice exam matches the question count, the 4 hour time limit, and the 70 percent pass mark, but is not proctored. It is a check of what you have retained from the lessons, not a stand-in for sitting the real thing.
Review