Lean Six Sigma 100%

Practice Certification Exam

Yellow Belt Practice Certification Exam

60 questions · 120 minutes · 70 percent to pass · drawn fresh every sitting

This practice exam draws 60 questions from a 90-question pool spanning all ten Yellow Belt lessons, shuffled in both question order and answer order every time you sit it. It matches the real IASSC Certified Lean Six Sigma Yellow Belt exam's question count, time limit, and 70 percent pass mark.

This is not a replica of the real exam. The actual IASSC Yellow Belt exam is closed book apart from IASSC's own reference document of formulas and tables, and is taken at a proctored testing center or through PeopleCert online proctoring. This practice exam matches the question count, the 2 hour time limit, and the 70 percent pass mark, but has no reference document and no proctoring. It is a check of what you have retained from the lessons, not a stand-in for sitting the real thing.

Rules

Back to Lesson 10 Course hub