IASSC Body of Knowledge 3.5.1-3.5.6, Hypothesis Testing with Non-Normal Data · 14 practice questions
0:00 / --:--
Reading
Every test in Lesson 4 assumed the underlying data were approximately
normally distributed. Real housing-operations data often is not: work-order
cycle times, cost overruns, and inspection scores are frequently skewed, with
a long tail of unusually slow or expensive cases. When that assumption
fails, a different family of tests takes over, ones that do not depend on
the shape of the distribution and typically compare medians or overall
distributions rather than means. This lesson covers when to suspect
non-normality and which nonparametric test replaces each normal-data test
from Lesson 4.
Every parametric test for normal data in Lesson 4 has a
nonparametric counterpart that works on ranks or medians instead of raw
values and means.
Deciding whether data are non-normal
Before defaulting to a nonparametric test, check whether normality
actually fails, since parametric tests are generally more powerful when
their assumptions hold. A normal probability plot is the standard visual
check: points falling close to a straight line support normality, while a
clear curve or S-shape does not. A formal goodness-of-fit test backs that
visual judgment, most commonly the Anderson-Darling test, which compares the
sample's cumulative distribution to the normal distribution and returns a
p-value; a small p-value (typically below 0.05) is evidence against
normality. Small sample sizes make any normality test underpowered, so a
Green Belt should also consider whether the process itself has a physical
reason to be skewed, such as a hard lower bound at zero on a cycle-time
measurement.
Mann-Whitney test
The Mann-Whitney test (also called the Mann-Whitney U test or
Wilcoxon-Mann-Whitney test) is the nonparametric counterpart to the
2-sample t test. It compares two independent, non-normal samples by ranking
all the observations together and comparing the sum of ranks between
groups, testing whether one population tends to produce larger values than
the other. For example, GCHS could use it to compare rehab cost overrun
amounts between two neighborhoods when the overrun data are heavily skewed
by a few very expensive outlier jobs. The result is usually reported in
terms of medians rather than means, since the median is not pulled around by
extreme values the way a mean is.
Kruskal-Wallis and Mood's median test
When three or more independent, non-normal groups need comparing, two
options replace one-way ANOVA:
Kruskal-Wallis test: extends the Mann-Whitney logic to
three or more groups by ranking all observations together and comparing the
average rank in each group. It is the more commonly used default and is more
powerful than Mood's median test when the data are only moderately skewed.
Mood's median test: compares the groups' medians
directly and is more robust to outliers than Kruskal-Wallis, at some cost in
power, because it only asks whether each observation falls above or below
the overall median rather than using full rank information.
A practical rule of thumb: if a boxplot or dotplot of the data shows a few
extreme outliers driving the story, Mood's median test is the safer choice;
otherwise Kruskal-Wallis is typically preferred.
Situation
Test
One sample, mean vs. target, normal data
1-sample t test
One sample, median vs. target, non-normal data
1-sample sign test or 1-sample Wilcoxon test
Two independent samples, normal data
2-sample t test
Two independent samples, non-normal data
Mann-Whitney test
Three or more independent samples, normal data
One-way ANOVA
Three or more independent samples, non-normal data
Kruskal-Wallis test or Mood's median test
Randomized block design (repeated measures across blocks), non-normal data
Friedman test
Friedman test
The Friedman test is the nonparametric counterpart to a randomized block
design (a two-way ANOVA where one factor is a blocking variable used to
remove known nuisance variation, not a factor of interest). It applies when
the same set of "blocks", such as the same five inspectors, each rate
several different conditions, and the response is non-normal. The test
ranks the observations within each block, then tests whether the average
rank differs across conditions. GCHS could use it, for example, to have the
same five inspectors each score three competing punch-list checklist formats
on the same properties, removing individual inspector severity as a source
of noise.
1-sample sign test and 1-sample Wilcoxon test
Both tests replace the 1-sample t test when the data are non-normal and
the question concerns a single sample's central tendency versus a target
value.
1-sample sign test: the more general and more robust of
the two. It only looks at whether each observation is above or below the
hypothesized median, ignoring how far above or below, and makes no
assumption about the shape of the distribution beyond continuity. This
robustness costs it statistical power.
1-sample Wilcoxon test: uses more information than the
sign test, ranking the size of each observation's distance from the
hypothesized median as well as its direction, which generally gives it more
power. Its trade-off is an added assumption: the distribution of the data
must be reasonably symmetric around the median, even if not normal.
Worked example, choosing between them. GCHS wants to test
whether the median cost overrun on rehab change orders differs from a
targeted $500, using a small sample of 10 jobs. A histogram of the overruns
shows a long right tail from two very large change orders, so the
distribution is clearly not symmetric. Because the Wilcoxon test requires
symmetry and the sign test does not, the sign test is the defensible choice
here even though it has less power.
Why this matters
Picking a nonparametric test is not just "use this when data are
non-normal, done." The exam expects a Green Belt to know that the Wilcoxon
test additionally assumes symmetry, and that choosing it on asymmetric data
without checking that assumption produces a result that looks rigorous but
is not valid.
Practice questions
1. What is the primary reason to switch from a parametric test to a nonparametric test?
The sample size is too large for a t test to stay reliable, since large samples always violate normality
The alpha level is set below 0.10
The underlying data are not approximately normally distributed
The data are collected from more than one location
Answer: c. Nonparametric tests are used in place of parametric ones when the normality assumption behind the parametric test does not hold.
2. Which formal test is commonly used to check whether sample data are normally distributed?
Friedman test, which ranks observations within each block
Kruskal-Wallis test, which compares the average rank of three or more groups
Mann-Whitney test, which compares two independent samples
Anderson-Darling goodness-of-fit test
Answer: d. The Anderson-Darling test is a common goodness-of-fit test used to check normality, returning a p-value that is compared to alpha.
3. A small p-value on an Anderson-Darling normality test (below 0.05) suggests what?
The variance is unequal across groups, so Levene’s test should replace the normality check
Evidence against the assumption that the data are normally distributed
The data are definitely paired
The sample size is too small to test at all
Answer: b. A small p-value on the normality test is evidence against normality, pointing toward a nonparametric test instead.
4. Which test is the nonparametric counterpart to the 2-sample t test for two independent groups?
One-way ANOVA
Mann-Whitney test
Friedman test
1-sample sign test
Answer: b. The Mann-Whitney test compares two independent, non-normal samples by ranking all observations together, replacing the 2-sample t test.
5. GCHS wants to compare rehab cost overruns between two neighborhoods, and the overrun data are heavily skewed by a few extreme outlier jobs. Which test fits best?
One-way ANOVA
Mann-Whitney test
Chi-square test for one variance
Paired t test
Answer: b. Two independent, non-normal (skewed) samples call for the Mann-Whitney test rather than the 2-sample t test.
6. Which two tests can replace one-way ANOVA when comparing three or more independent, non-normal samples?
Anderson-Darling test and Levene's test
Paired t test and 1-sample t test
Kruskal-Wallis test and Mood's median test
Friedman test and Mann-Whitney test
Answer: c. Kruskal-Wallis and Mood's median test both replace one-way ANOVA for three or more independent, non-normal groups.
7. Compared to Kruskal-Wallis, Mood's median test is generally described as which of the following?
Only usable with exactly two groups
More powerful than Kruskal-Wallis, but less robust to outliers because it uses the full rank information
More robust to outliers, at some cost in statistical power
Identical in every respect
Answer: c. Mood's median test only classifies observations as above or below the overall median, which makes it more robust to outliers but less powerful than Kruskal-Wallis.
8. The Friedman test is the nonparametric counterpart to which design?
A randomized block design (repeated measures across blocks)
A contingency table of counts, where each cell records how many items fall in each category
A single sample compared to a target
Two independent samples
Answer: a. The Friedman test replaces a randomized block ANOVA when the response variable is non-normal, ranking observations within each block.
9. GCHS has the same five inspectors each score three competing checklist formats on the same properties. Which test fits this design?
Friedman test
1-sample Wilcoxon test
2-sample t test
Mann-Whitney test
Answer: a. The same inspectors (blocks) rating multiple conditions is a randomized block design, so the Friedman test applies.
10. Which nonparametric test only considers whether each observation is above or below a hypothesized median, ignoring the size of the difference?
1-sample Wilcoxon test
Kruskal-Wallis test
Friedman test
1-sample sign test
Answer: d. The 1-sample sign test only uses the direction (above or below the hypothesized median), not the magnitude, of each difference.
11. What additional assumption does the 1-sample Wilcoxon test require that the 1-sample sign test does not?
The variance must be known in advance
The data must be counts, not measurements
The sample size must exceed 100
The distribution must be reasonably symmetric around the median
Answer: d. The Wilcoxon test uses the ranked size of each distance from the median, which is only meaningful if the distribution is roughly symmetric; the sign test carries no such requirement.
12. A sample of 10 rehab change-order overruns shows a long right tail from two very large orders, clearly not symmetric. Testing the median against a $500 target, which test is defensible?
One-way ANOVA, because there are 10 observations
Mann-Whitney test, because there is one sample
1-sample Wilcoxon test, because it is more powerful and uses the size of each difference from $500
1-sample sign test, because it does not require symmetry
Answer: d. Because the data are asymmetric, the Wilcoxon test's symmetry assumption is violated, leaving the sign test as the defensible choice despite its lower power.
13. Compared to their parametric counterparts, nonparametric tests are generally described how in terms of statistical power?
Typically less powerful when the parametric test's assumptions actually hold
Always more powerful in every situation
Powered identically in all cases
Irrelevant, since power does not apply to nonparametric tests
Answer: a. When normality genuinely holds, the matching parametric test is usually more powerful, which is why normality should be checked rather than assumed away.
14. Nonparametric tests such as Mann-Whitney and Kruskal-Wallis primarily compare which measure between groups?
Correlation coefficients between each pair of groups, as in a regression analysis
Sample standard deviations only
Medians or overall rank distributions rather than means
Sample sizes only
Answer: c. Nonparametric tests generally work on ranks and compare medians or overall distributions, not means, which is what makes them resistant to skew and outliers.
Glossary
Anderson-Darling test
A goodness-of-fit test that checks whether sample data are consistent
with a normal distribution, returning a p-value.
Mann-Whitney test
The nonparametric counterpart to the 2-sample t test, comparing two
independent samples by ranking all observations together.
Kruskal-Wallis test
The nonparametric counterpart to one-way ANOVA for three or more
independent samples, based on average ranks within each group.
Mood's median test
A nonparametric test for three or more independent samples that compares
medians directly and is more robust to outliers than Kruskal-Wallis.
Friedman test
The nonparametric counterpart to a randomized block design, ranking
observations within each block before comparing conditions.
1-sample sign test
A nonparametric test comparing a sample's median to a target value using
only the direction of each observation's difference from that target.
1-sample Wilcoxon test
A nonparametric test comparing a sample's median to a target value using
the ranked size of each difference, which requires a symmetric distribution.