Lean Six Sigma 100%

Green Belt · Control phase

Lesson 9: Statistical Process Control

IASSC Body of Knowledge 5.2.1-5.2.10, Statistical Process Control · 14 practice questions

0:00 / --:--

Reading

Lessons 7 and 8 asked how variables relate to each other. This lesson turns to a different, ongoing question: once a process has been improved, how does a team watch it in real time and know, from the data alone, whether it is behaving the way it always has or whether something has actually changed? That is the job of Statistical Process Control, SPC. This lesson covers common cause versus special cause variation, how data should be collected for a control chart, how to pick the right chart for a given kind of data, control limits versus specification limits, and the basic signals that flag a process as out of control.

P-chart with UCL, center line, LCL, and one out-of-control point A control chart of 12 weekly proportions of inspected units with a code violation, plotted around a center line at 0.06, an upper control limit near 0.161, and a lower control limit floored at zero. Week 8 rises above the upper control limit and is flagged as out of control. P-chart: weekly proportion of inspected units with a code violation UCL = 0.161 CL = 0.06 LCL = 0 (floored) 0.00 0.06 0.12 0.18 Week 8: out of control (beyond UCL) Week Proportion defective (p)
A p-chart tracking the weekly proportion of inspected units with at least one code violation. Week 8's point rises above the upper control limit, signaling a special cause that the routine common-cause variation in the other 11 weeks does not show.

Common cause vs. special cause variation

Every process varies, and SPC's first job is separating two kinds of variation. Common cause variation is the routine, expected noise built into a process as it normally runs, coming from many small, ever-present sources; it produces a stable, predictable pattern over time. Special cause variation comes from something outside that routine pattern, a specific, identifiable event such as a new inspector, a damaged tool, a supplier change, or a change in material, and it shows up as a point or pattern that does not belong with the rest of the data. A process showing only common cause variation is said to be in statistical control; treating an ordinary common-cause blip as if it were a special cause, chasing every small wiggle with a new corrective action, tends to make a stable process worse, not better.

Data collection for SPC: rational subgrouping

A control chart is only as good as the subgroups used to build it. A rational subgroup is a small set of measurements collected close together in time or in production sequence, so that the variation within a subgroup reflects only ordinary common-cause noise, while variation between subgroups is where a real process shift would show up. For a GCHS punch-list inspection process, a rational subgroup might be several homes inspected by the same crew on the same day, rather than homes inspected across different weeks and different crews lumped together, which would blur a genuine shift with the extra noise of mixing different conditions inside one subgroup.

Choosing the right control chart

The right chart depends on the type of data and how it is collected: continuous, measured data (cycle time in hours, square footage) uses one chart family, while attribute, count-based data (pass/fail, number of defects) uses another, and within each family the chart also depends on subgroup size.

ChartData typeSubgroup sizeTracks
I-MRContinuous, individualsn = 1 (one reading at a time)Individual value and moving range
Xbar-RContinuous, subgroupedRoughly n = 2-9Subgroup average and range
Xbar-SContinuous, subgroupedCommonly n = 10+Subgroup average and standard deviation
PAttribute, proportion defectiveVariable sample sizeProportion of defective units
NPAttribute, count defectiveConstant sample sizeCount of defective units
UAttribute, defects per unitVariable sample sizeAverage defects per unit
CAttribute, count of defectsConstant sample sizeCount of defects

Two continuous-data charts track subgroup averages alongside subgroup spread: Xbar-R pairs the average with the range, and is the standard choice for smaller subgroups, roughly 2 to 9 measurements, where the range is an efficient and simple estimate of spread. Xbar-S pairs the average with the standard deviation instead, and becomes the better choice as subgroups grow larger, commonly 10 or more, because the range starts throwing away information about spread that the standard deviation still captures once there are enough points in each subgroup for it to matter.

Among attribute charts, the distinction is proportion versus count, and constant versus variable sample size. The P chart plots a proportion defective and tolerates a sample size that changes from period to period, recalculating its control limits for each subgroup's size. The NP chart plots the raw count of defective units instead of a proportion, but only works when the sample size is fixed. The U chart plots defects per unit (distinguishing a defect, a single flaw, from a defective unit, an item with one or more defects) and, like the P chart, tolerates a variable sample size. The C chart plots the raw count of defects and, like the NP chart, requires a constant sample size.

Two further charts, CuSum (cumulative sum) and EWMA (exponentially weighted moving average), are built to detect small, sustained shifts in a process mean faster than a standard Shewhart chart like those above, because they accumulate information across many points rather than judging each point mostly on its own.

Why this matters

Chart-selection questions typically present a short scenario, continuous or attribute data, roughly what subgroup size, constant or variable sample size, and ask for the one correct chart. Working through those four questions in order, using the table above, resolves nearly every one of them.

Start chart selection with the dataIndividuals: Continuous data, One reading at a time, I-MR. Subgroups: Continuous data, Average and spread, Xbar-R or Xbar-S. Attributes: Defective units or defects, Count or proportion, P, NP, U, or C IndividualsContinuous dataOne reading at a timeI-MRSubgroupsContinuous dataAverage and spreadXbar-R or Xbar-SAttributesDefective units or defectsCount or proportionP, NP, U, or C
Start with the data family, then use the lesson's table to check subgroup size and whether sample size is constant or variable.

Control limits vs. specification limits

Control limits and specification limits answer two different questions and come from two different places. Control limits, typically the center line plus or minus three standard deviations of the plotted statistic, are calculated from the process's own historical data; they describe what the process actually does, the voice of the process. Specification limits come from the customer or a design requirement; they describe what the process is supposed to do, the voice of the customer. A process can be perfectly in statistical control, every point inside its control limits, while still producing output outside specification limits, if the process is not capable of meeting the requirement in the first place. Confusing the two, for example plotting spec limits on a control chart, is a common and consequential mistake.

Out-of-control signals

The most basic out-of-control signal is a single point falling beyond the upper or lower control limit, roughly three standard deviations from the center line, which by itself is already an unlikely event under common cause variation alone and is treated as evidence of a special cause. Beyond that single-point rule, most SPC references also flag non-random patterns inside the limits, such as a long run of consecutive points on one side of the center line, as signals worth investigating even without a point crossing a limit outright. Any of these signals should prompt an investigation into what specific, assignable cause changed, not an automatic adjustment to the process; adjusting a stable process in response to ordinary common-cause variation, sometimes called overcontrol or tampering, is itself a way to make the output worse.

Worked example: p-chart control limits

Over 20 weeks, GCHS inspects 50 units per week (1,000 total inspections) and finds 60 units total with at least one code violation. The center line is the overall proportion defective: p̄ = 60 / 1,000 = 0.06.

The control limits use p̄ ± 3√(p̄(1-p̄)/n), with n = 50 per week. First, p̄(1-p̄) = 0.06 × 0.94 = 0.0564. Dividing by n: 0.0564 / 50 = 0.001128. Taking the square root: √0.001128 ≈ 0.0336. Multiplying by 3: 3 × 0.0336 ≈ 0.1008.

The upper control limit is UCL = 0.06 + 0.1008 ≈ 0.161. The lower control limit works out to LCL = 0.06 - 0.1008 ≈ -0.041, which is below zero; since a proportion can never be negative, the lower control limit is floored at 0, as shown in the figure. Any week with a proportion defective above 0.161 is flagged as out of control, which is exactly what happens at week 8 in the chart above.

Practice questions

1. What is the defining feature of common cause variation?

  1. It always signals a defective product, so every affected unit must be scrapped or reworked before shipment
  2. It only occurs in attribute data
  3. It is the routine, expected noise built into a stable process from many small, ever-present sources
  4. It requires an immediate process adjustment

2. A crew supervisor notices one week's punch-list defect count is far outside the usual pattern, traced to a newly hired inspector using the wrong checklist. What kind of variation is this?

  1. Special cause variation
  2. Specification variation
  3. Sampling variation that should be ignored
  4. Common cause variation

3. What is a rational subgroup?

  1. A small set of measurements collected close together in time or sequence, so variation within it reflects only common-cause noise
  2. Any random sample of any size collected at any time
  3. A subgroup that always contains exactly 30 observations
  4. A subgroup collected only once a year

4. GCHS records one continuous cycle-time measurement per completed work order, with no natural way to group several readings together. Which chart is designed for this situation?

  1. I-MR chart
  2. Xbar-S chart
  3. P chart
  4. Xbar-R chart

5. A process collects continuous measurements in subgroups of 4. Which chart pair is the standard choice?

  1. P chart, pairing proportion with sample size
  2. C chart, pairing count of defects with a constant sample size
  3. Xbar-R, pairing the subgroup average with the range
  4. Xbar-S, pairing the subgroup average with the standard deviation

6. As subgroup size grows larger, commonly 10 or more, why does Xbar-S become the better choice over Xbar-R?

  1. Because P charts always replace Xbar charts above n = 10
  2. Because Xbar-R cannot be plotted on a computer
  3. Because larger subgroups require attribute charts instead
  4. Because the range becomes a less efficient estimator of spread than the standard deviation as subgroup size grows

7. GCHS inspects a variable number of housing units each month and tracks the proportion found with at least one code violation. Which chart fits?

  1. C chart
  2. Xbar-R chart
  3. NP chart
  4. P chart

8. GCHS inspects exactly 40 homes every month and tracks the raw count of homes found defective, not a proportion. Which chart fits?

  1. C chart
  2. NP chart
  3. U chart
  4. P chart

9. GCHS counts the total number of individual code violations found (not just whether a home has one) across a varying number of inspected homes each week. Which chart fits?

  1. C chart
  2. NP chart
  3. U chart
  4. Xbar-S chart

10. Which charts are built to detect small, sustained shifts in a process mean faster than a standard Shewhart chart?

  1. C and U charts
  2. CuSum and EWMA charts
  3. P and NP charts
  4. I-MR and Xbar-R charts

11. A process's control chart shows every point within its control limits, yet a large share of finished units still fail to meet the customer's specification. What does this indicate?

  1. Control limits and specification limits are the same thing here, so the chart limits should be tightened
  2. The special cause has already been fixed
  3. The control chart's math must be wrong
  4. The process is in statistical control but is not capable of meeting specification

12. Over 20 weeks, GCHS inspects 50 units per week and finds 60 total units with a code violation. What is the center line, p̄, for the p-chart?

  1. 0.006
  2. 0.06
  3. 0.60
  4. 6.0

13. Using p̄ = 0.06 and n = 50, what is the upper control limit, UCL = p̄ + 3√(p̄(1-p̄)/n)?

  1. 0.0336
  2. Approximately 0.161
  3. Approximately 0.300
  4. 0.06

14. The same p-chart's calculated lower control limit works out to about -0.041. What should actually be reported as the LCL, and why?

  1. The chart cannot be used if this happens, and the limits must be recomputed from a larger sample
  2. -0.041, exactly as calculated
  3. 0, because a proportion can never be negative, so a negative lower limit is floored at zero
  4. 0.06, the same as the center line

Glossary

Common cause variation
Routine, expected variation from many small, ever-present sources in a stable process.
Special cause variation
Variation from a specific, identifiable event outside the process's normal, routine pattern.
Rational subgroup
A small set of measurements collected close together in time or sequence so within-subgroup variation reflects only common-cause noise.
Control limits
Statistical boundaries, typically center line ± 3 standard deviations of the plotted statistic, calculated from the process's own data.
Specification limits
Customer- or design-driven limits describing what the process output is required to be, unrelated to the process's own historical spread.
P chart
An attribute control chart for proportion defective, tolerating a variable sample size.
C chart
An attribute control chart for the raw count of defects, requiring a constant sample size.
Out-of-control signal
Evidence a process has shifted, most basically a single point beyond a control limit, or a non-random pattern of points inside the limits.