Lean Six Sigma 100%

Practice Certification Exam

Green Belt Practice Certification Exam

100 questions · 180 minutes · 70 percent to pass · drawn fresh every sitting

This practice exam draws 100 questions, 20 from each DMAIC phase, from a 210-question pool spanning the Yellow Belt and Green Belt lessons, shuffled in both question order and answer order every time you sit it. It matches the real IASSC Certified Lean Six Sigma Green Belt exam's question count, time limit, and 70 percent pass mark.

This is not a replica of the real exam. The actual IASSC Green Belt exam is closed book and is taken at a proctored testing center or through PeopleCert online proctoring. This practice exam matches the question count, the 3 hour time limit, and the 70 percent pass mark, but is not proctored. It is a check of what you have retained from the lessons, not a stand-in for sitting the real thing.

Rules

Back to Green Belt Lesson 10 Course hub