Lesson 9: Holding the gain - Kanban, Poka-Yoke, and the control plan
IASSC Body of Knowledge 5.1, Lean Controls, and 5.3, Six Sigma Control Plans · 14 practice questions
0:00 / --:--
Reading
An improvement that erodes back to the old, broken state within a few
months was never really finished. This lesson covers the Control phase
material in the Yellow Belt Body of Knowledge: the Lean tools used to hold a
gain in place day to day, and the formal control plan document that makes
holding it everyone's explicit, assigned job rather than a hope.
The control plan and response plan work as a loop: monitor the process, and when it goes out of control, the response plan's pre-defined corrective action brings it back before returning to normal operation.
Control methods for 5S
5S, covered in Lesson 4, decays without deliberate upkeep; a workspace
that was Sorted, Straightened, and Shined once will drift back toward
clutter within weeks unless something actively sustains it. The standard
control method is a recurring 5S audit, a short, scheduled walkthrough
against a checklist, scored and tracked over time, often visually posted so
everyone can see the current state and the trend. The audit is what turns
Sustain, the fifth S, from a vague aspiration into an actual, repeatable
practice with accountability attached.
Kanban
Kanban is a visual signaling system, originally a physical card in
Toyota's system, used to control inventory and work in process by
triggering replenishment or production only when it is actually needed,
rather than on a fixed schedule or forecast. This is a pull
system: downstream demand pulls work forward, as opposed to a
push system, where each step produces according to a
schedule regardless of whether the next step is ready for it. Kanban
directly attacks the overproduction and excess inventory wastes covered in
Lesson 4, since nothing gets made or moved until a real signal calls for it,
which keeps work in process visible and bounded rather than silently
piling up between steps.
Read this sequence as a pull signal: downstream demand calls for replenishment. The lesson contrasts this with production based only on a schedule or forecast.
Poka-Yoke, mistake-proofing
Poka-Yoke, a Japanese term usually translated as mistake-proofing,
credited to Shigeo Shingo, is the practice of designing a process so that
errors are either physically impossible to make or are caught immediately
if they occur, rather than relying on an inspector or an operator's
attention and memory to prevent them. Poka-Yoke devices split into two
broad types: prevention, where the error cannot physically
occur at all, such as a part designed so it can only be assembled in the
one correct orientation, and detection, where the error can
still occur but is caught and signaled immediately, such as a sensor that
stops a machine the instant a required step is skipped. Prevention is
generally preferred over detection whenever it is achievable, since a
prevented error never happens at all, while a detected error still occurred
and still has to be corrected, just sooner rather than later.
Cost-benefit analysis for control
Not every control method is worth its ongoing cost. Before a control is
built into a process permanently, it is weighed against the cost and
frequency of the problem it prevents. A control that costs more to run,
year over year, than the defect it prevents would have cost the
organization is not a good design choice, and this is exactly the same
logic used earlier, in Lesson 3, to build a project's financial case in the
first place: a control plan is itself a small, ongoing investment decision
and deserves the same scrutiny.
Elements of the control plan
A control plan is the formal document that hands a finished project off
to the Process Owner named in the original charter, in Lesson 3, so that the
gain survives after the project team disbands. At minimum, a control plan
specifies: which CTQ or process characteristic is being controlled, how it
is measured and how often, what the acceptable range or specification is,
who is responsible for checking it, and where the data or results are
recorded. A control plan with no named owner, or no defined checking
frequency, is not really a control plan, just a description of a good idea
that nobody is specifically accountable for maintaining.
Elements of the response plan
A response plan is the part of the control plan that answers a different
question: what happens the moment a control point signals a problem. It
specifies who is notified, what immediate action they take, and what
corrective or containment steps follow, so that the reaction to an
out-of-control signal is decided in advance, calmly, rather than improvised
under pressure in the moment the problem actually appears. A control plan
that only says what to measure, with no response plan for what to do when
the measurement goes wrong, leaves the process exposed exactly when it
matters most.
Practice questions
1. What does a recurring 5S audit accomplish?
It replaces the need for the Sustain step entirely, since a scored checklist makes the fifth S redundant
It turns Sustain from a vague aspiration into a repeatable practice with accountability
It calculates a Risk Priority Number
It is only used during the Define phase
Answer: b. A scheduled 5S audit against a checklist, scored and tracked over time, turns Sustain from a vague aspiration into an actual, repeatable practice with accountability.
2. Kanban is best described as which kind of system?
A pull system, where downstream demand triggers replenishment or production
A synonym for a control plan
A push system, where each step produces on a fixed schedule regardless of downstream readiness
A random sampling system for inspection
Answer: a. Kanban is a pull system: downstream demand pulls work forward, triggering replenishment or production only when actually needed, rather than on a fixed schedule.
3. Which two of the seven wastes from Lesson 4 does Kanban most directly attack?
Overproduction and excess inventory
Motion and transportation only, the two wastes involved in moving people and material
Defects and overprocessing
Waiting and motion only
Answer: a. Kanban directly attacks overproduction and excess inventory, since nothing gets made or moved until a real downstream signal calls for it.
4. What is Poka-Yoke?
A synonym for Kanban, the card-based visual signaling system used to trigger replenishment of parts and production
Designing a process so errors are either physically impossible to make or are caught immediately
A statistical test for hypothesis testing
A type of value stream map
Answer: b. Poka-Yoke, mistake-proofing, is designing a process so errors are either physically impossible to make or are caught and signaled immediately if they occur.
5. A part is designed so it can only be assembled in the one correct orientation. Which type of Poka-Yoke is this?
Detection
Prevention
Reproducibility
Response
Answer: b. This is a prevention-type Poka-Yoke: the error cannot physically occur at all, as opposed to detection, where the error can occur but is caught immediately.
6. Why is prevention generally preferred over detection in Poka-Yoke design, when both are achievable?
Detection devices are always cheaper to build
Prevention only works for attribute data
There is no meaningful difference between the two in practice
A prevented error never happens at all, while a detected error still occurred and still has to be corrected
Answer: d. Prevention is generally preferred because a prevented error never happens at all, while a detected error still occurred and still has to be corrected, just sooner rather than later.
7. What determines whether a control method is a good design choice, according to cost-benefit analysis for control?
Whether it uses a physical device rather than a written checklist, since devices are always more reliable
Whether leadership personally likes the idea
Whether its ongoing cost is less than the cost and frequency of the problem it prevents
Whether it was included in the original project charter
Answer: c. A control's ongoing cost is weighed against the cost and frequency of the problem it prevents; a control that costs more to run than the defect would have cost is not a good design choice.
8. Which of the following is NOT typically specified in a control plan?
The acceptable range or specification for the characteristic being controlled
Who is responsible for checking the measurement
The original members of the executive leadership team from a decade ago
How often the characteristic is measured
Answer: c. A control plan specifies the characteristic controlled, how and how often it is measured, the acceptable range, and who is responsible, not unrelated historical leadership information.
9. A control plan names a CTQ, a measurement frequency, and a specification range, but has no named owner. What is missing?
Accountability; without a named owner, it is a description of a good idea, not a real control plan
Nothing; this control plan is complete as described, since the CTQ, frequency, and range are all present
A Risk Priority Number
A Gage R&R study
Answer: a. Without a named responsible owner, a control plan is just a description of a good idea, not something anyone is specifically accountable for maintaining.
10. What does a response plan specifically add beyond the rest of the control plan?
The original business case for the project
A repeat of the measurement frequency already stated elsewhere
The project's financial savings calculation
What happens the moment a control point signals a problem: who is notified and what corrective action follows
Answer: d. A response plan specifies what happens the moment a control point signals a problem, deciding the reaction in advance rather than improvising it under pressure.
11. As contrasted with Kanban in this lesson, which of the following describes a push system?
A synonym for a control plan's response plan
Downstream demand pulls work forward only when it is actually needed
Work in process is kept visible and bounded by a visual signal
Each step produces according to a fixed schedule regardless of whether the next step is ready for it
Answer: d. A push system produces according to a fixed schedule or forecast regardless of downstream readiness, the opposite of Kanban's pull approach.
12. GCHS's rehab crew currently orders replacement HVAC filters on a fixed monthly schedule regardless of how many are actually used on site, leaving a growing stockpile in the supply closet. Which control concept from this lesson would most directly address the excess inventory this creates?
Calculating the Risk Priority Number for the filters by scoring severity, occurrence, and detection
Kanban, triggering reorders only when a real downstream signal calls for them
A response plan naming who is notified of a stockout
A 5S audit of the supply closet
Answer: b. A fixed reorder schedule regardless of actual usage is a push system; replacing it with a Kanban pull signal ties replenishment to real demand and directly attacks the excess inventory waste.
13. A sensor on GCHS's drywall lift detects that a safety strap was left loose and immediately stops the lift and sounds an alarm, after the strap had already been left unsecured. Which type of Poka-Yoke is this?
Reproducibility
A response plan
Detection, since the error already occurred but is caught and signaled immediately
Prevention, since the strap can be fastened in only one position and the lift cannot start unsecured
Answer: c. The strap was already left loose, so the error occurred; the sensor catches and signals it immediately, which is the detection type of Poka-Yoke rather than prevention.
14. GCHS's control plan for its window-repair CTQ names the characteristic being controlled, the measurement frequency, and the acceptable range, but does not say who should be notified or what immediate action to take if a measurement falls outside range. What is missing?
A response plan
A control chart
A capability study
A Gage R&R study
Answer: a. A response plan is what specifies who is notified and what corrective action follows the moment a control point signals a problem; without it, the control plan only says what to measure, not what to do when the measurement goes wrong.
Glossary
Kanban
A visual pull system that triggers replenishment or production only when downstream demand calls for it.
Pull system
A system in which downstream demand pulls work forward, as opposed to a push system's fixed schedule.
Poka-Yoke
Mistake-proofing: designing a process so errors are either physically impossible or are caught immediately.
Prevention (Poka-Yoke)
A mistake-proofing design in which the error cannot physically occur at all.
Detection (Poka-Yoke)
A mistake-proofing design in which the error can still occur but is caught and signaled immediately.
Control plan
The formal document specifying the CTQ controlled, how and how often it is measured, the acceptable range, and who is responsible.
Response plan
The part of a control plan specifying who is notified and what corrective action follows when a control point signals a problem.
5S audit
A recurring, scheduled walkthrough against a checklist that sustains a 5S workspace over time.