People - Task 3 of 8

Day 3: Lead the Project Team

about 4.1% of the exam content - about 90 minutes - 14 practice questions

0:00 / --:--

Reading

Managing is about tasks; leading is about people. The PMP exam draws that line hard. A project manager manages a schedule and leads a team, and most People-domain questions are testing whether you reach for the leadership move or the administrative one. The administrative move (update the plan, log the issue, notify the manager) is usually the distractor.

For a GCHS crew lead moving into formal project management, the biggest adjustment is this: your job is no longer to do the best work on the site. It is to make it possible for other people to do their best work. PMI calls that servant leadership, and it is the dominant model on the modern exam.

Servant leadership

A servant leader inverts the usual picture. Instead of the team existing to execute the manager's instructions, the leader exists to serve the team's ability to deliver value. Concretely, that means:

  • Removing impediments. If the crew is waiting on a permit, a material delivery, or an access decision, clearing that is the PM's highest-value work that day.
  • Shielding the team from noise. Absorbing interruptions, ad-hoc requests, and political pressure so the team can focus.
  • Coaching rather than directing. Asking questions that help people find the answer, so the capability stays with them.
  • Providing what the team needs: tools, training, information, access, and cover to make decisions.
  • Getting out of the way. A self-organizing team decides how to do the work; the product owner or sponsor decides what is most valuable.
Key points
  • Servant leader: how can I help you deliver? Command-and-control: here is what you will do.
  • The strongest exam answers usually involve removing a blocker, coaching, or empowering, not assigning, instructing, or reporting.
  • Empowerment means the team makes decisions within agreed boundaries; it does not mean the PM is absent or unaccountable.
  • Leadership is situational; a brand-new team and a mature team need different things from you.
Tuckman's five stages of team development and the matching leadership style Five boxes in a row connected by forward arrows, showing team development from Forming to Storming to Norming to Performing to Adjourning. A dashed backward arrow from Performing to Storming shows that a change in membership or scope can regress a mature team. Below each stage box is the leadership style it calls for: Forming calls for directive; Storming calls for coaching; Norming calls for supporting; Performing calls for delegating; Adjourning calls for recognizing. Forming Directive Storming Coach Norming Support Performing Delegate Adjourning Recognize new member or scope change can regress the team

Tuckman: how teams actually develop

Bruce Tuckman's model is on the exam and is genuinely useful for reading a described team. The stages are sequential, but teams can regress: a new member, a new scope, or a lost member can send a performing team back to storming.

StageWhat you observeWhat the leader should do
Forming Polite, cautious, dependent on the leader; roles unclear; little real disagreement Be directive. Provide structure, clarify roles and goals, establish the team charter and ground rules
Storming Disagreement about approach and roles; challenges to authority; frustration; productivity dips Coach. Facilitate conflict openly, reinforce ground rules, do not suppress the friction or bypass it
Norming Working agreements settle in; trust builds; the team starts self-correcting Support. Step back gradually, reinforce good behavior, let the team own more decisions
Performing High trust, high output, self-organizing; conflict is handled internally Delegate. Stay out of the way, remove impediments, protect the team's focus
Adjourning Work completes; the team disbands; a mix of pride and loss Recognize contributions, capture lessons learned, help people transition

Notice that the leader's style shifts from directive to delegating as the team matures. That is the same idea as situational leadership: adapt your style to the readiness (the competence and the confidence) of the person or team in front of you. A skilled carpenter who has never run a permit process needs direction on permits and delegation on framing, from the same manager on the same day.

Clarifying who does what: RACI and role clarity

A large share of team dysfunction is not attitude, it is ambiguity. A RACI chart (a type of responsibility assignment matrix) fixes that by assigning, for each activity:

  • R (Responsible): does the work. Can be more than one person.
  • A (Accountable): owns the outcome and approves it. Exactly one per activity: this is the rule most often tested.
  • C (Consulted): two-way input before the decision.
  • I (Informed): one-way notification after the decision.

If two people are Accountable for the same activity, nobody is. If a task is being dropped repeatedly, look for a missing A before you look for a lazy team member.

Motivation: what actually moves people

PMI leans on a few motivation theories. You do not need to recite them, but you need to recognize them in a scenario.

  • Maslow's hierarchy: people pursue higher needs (belonging, esteem, self-actualization) only once basic ones (physiological, safety) are met. A crew worried about layoffs will not be inspired by a vision statement.
  • Herzberg's two-factor theory: hygiene factors (pay, working conditions, supervision, job security) cause dissatisfaction when missing but do not motivate when present. Motivators (achievement, recognition, the work itself, responsibility, growth) are what actually drive engagement. Fixing a broken truck removes a complaint; giving someone ownership of a scope creates energy.
  • McGregor's Theory X and Theory Y: Theory X assumes people avoid work and need supervision; Theory Y assumes people are self-motivated when given responsibility. The servant-leadership approach PMI favors reflects Theory Y.
  • McClelland: people are driven by differing needs for achievement, affiliation, or power; effective leaders assign work accordingly.
  • Intrinsic motivation: autonomy, mastery, and purpose. This is why self-organizing teams often outperform closely supervised ones.
Recognition and rewards

Recognition works when it is timely, specific, and culturally appropriate, and when it does not pit team members against each other. Zero-sum awards such as employee of the month can quietly undermine the collaboration you are trying to build. Team-based recognition generally beats individual competition on project work.

Building capability: training, mentoring, and the AI question

PMI expects the PM to ensure team members are adequately trained and to mentor deliberately. Practically: identify the competency gap against what the project actually needs, plan how to close it (training, pairing, shadowing, mentoring), fund it in the budget, and verify it worked. On a GCHS job that might mean lead-safe renovation certification, ADA and Texas Accessibility Standards familiarity, or moisture-control detailing for coastal humidity.

AI tools change the training conversation rather than ending it. Teams now need judgment about when to trust an AI-generated estimate, scope draft, or photo assessment, and when to verify. Good practice: treat AI output as a draft from a fast but inexperienced assistant, require human review before anything reaches a homeowner or funder, and be explicit that accountability stays with the named person, not the tool. A PM who lets a junior estimator ship unreviewed AI output has a training gap, not a technology problem.

Leading virtual and distributed teams

GCHS runs crews across counties with remote design and grant staff, so virtual leadership is not optional. What PMI expects:

  • Invest deliberately in relationship-building; it does not happen incidentally without a shared job site.
  • Agree communication norms explicitly: channels, response-time expectations, and which decisions require synchronous discussion.
  • Use video for anything involving disagreement, feedback, or nuance; text loses tone.
  • Watch for exclusion of remote members in hybrid meetings, and actively bring them in.
  • Respect time zones and site schedules; rotate the inconvenience rather than always imposing it on the same group.
  • Make work visible through shared boards so trust rests on transparency, not on surveillance.
Underperformance: diagnose before you act

When a scenario describes someone underperforming, the first move is a private conversation to understand why: capability, clarity, capacity, tools, or something personal. Reassigning the person, reporting them to their functional manager, or documenting for a performance review before you have talked to them are all classic wrong answers. Address performance privately, praise publicly.

Practice Questions

1. A team reports being blocked because a required permit has not been issued. What is the servant leader's PRIMARY responsibility here?

  1. Ask the team to escalate to the permitting office themselves
  2. Document the delay in the issue log and report it in the status report
  3. Actively work to remove the impediment so the team can continue
  4. Reassign the team to other tasks and wait

2. A newly formed team is polite, avoids disagreement, and looks to the project manager for direction on everything. Which Tuckman stage is this, and what should the project manager do?

  1. Storming: facilitate conflict openly
  2. Forming: provide structure, clarify roles and goals
  3. Norming: step back and let the team self-correct as it settles into a rhythm
  4. Performing: delegate and stay out of the way

3. A team that had been working smoothly begins arguing about approach after two new members join and the scope expands. What is the MOST likely explanation?

  1. The team lacks technical competence
  2. The ground rules were poorly written
  3. The team has entered adjourning
  4. The team has regressed to storming because its composition and scope changed

4. In a RACI chart, how many people should be Accountable for a single activity?

  1. At least two, for redundancy
  2. Exactly one
  3. One per functional department involved
  4. As many as are Responsible

5. A task keeps falling through the cracks between two departments. What should the project manager examine FIRST?

  1. Whether the schedule allows enough duration
  2. Whether the task should be outsourced
  3. Whether the individuals involved are motivated enough to take ownership without being told
  4. Whether the RACI gives that task one clear Accountable party

6. According to Herzberg's two-factor theory, which of the following is a MOTIVATOR rather than a hygiene factor?

  1. Salary
  2. Working conditions
  3. Recognition for achievement
  4. Job security

7. On a RACI chart, who has a two-way conversation with the decision maker before a task is finalized, but does not perform the work and does not approve it?

  1. Accountable
  2. Informed
  3. Consulted
  4. Responsible

8. A skilled carpenter moving into a lead role is confident framing walls but has never handled a permit application. What is the BEST leadership approach for the project manager to take with this person?

  1. Delegating on both, since the person is generally skilled
  2. Coaching on both, to build confidence evenly
  3. Directive on the permit process, delegating on framing
  4. Directive on both tasks until fully cross-trained

9. GCHS's remote design consultant works Central time while two crews are on Eastern time, and meetings are always scheduled for the crews' convenience. What should the project manager do?

  1. Rotate the inconvenient meeting time so no one group always bears it
  2. Keep the current schedule, since the majority of attendees are on Eastern time
  3. Require the consultant to shift permanently to Eastern hours
  4. Move all coordination to text messages and recorded videos to avoid live scheduling entirely

10. GCHS crew members are anxious about a rumored funding cut that could mean layoffs. Leadership responds with an inspiring speech about the project's long-term impact. According to Maslow's hierarchy, why is this unlikely to land?

  1. Because motivators only matter once hygiene factors are already poor
  2. Because vision statements only apply in adaptive environments
  3. Because Theory Y assumes people avoid work without supervision
  4. Because safety needs must be addressed before higher needs like belonging or self-actualization can motivate

11. A project manager designs work assignments assuming team members are self-motivated and will seek out responsibility when given the chance. Which management assumption does this reflect?

  1. Theory Y
  2. Herzberg's hygiene theory
  3. McClelland's need for power
  4. Theory X

12. A regional office proposes an "employee of the month" award for the rehab crews. What risk should the project manager raise?

  1. It costs too much to administer across multiple counties
  2. Zero-sum individual awards can quietly undermine the collaboration the team relies on
  3. It violates the definition of done
  4. It will motivate every team member equally

13. A previously reliable estimator has missed three consecutive deadlines. What should the project manager do FIRST?

  1. Have a private conversation to understand the cause
  2. Document the pattern for the next performance review
  3. Reassign the estimator's tasks to someone else
  4. Report the pattern to the estimator's functional manager

14. A junior estimator assigned to a coastal rehab project has never handled moisture-control detailing. What is the project manager's BEST first step?

  1. Wait for the next annual training budget cycle
  2. Assign the task and let the estimator learn from any mistakes
  3. Permanently reassign all coastal jobs to a senior estimator until the estimator's next annual review
  4. Identify the competency gap and plan to close it, for example by pairing with a senior estimator

Glossary

Servant leadership
A leadership model in which the leader's role is to remove impediments, coach, and provide what the team needs, rather than to direct and control.
Tuckman's stages
Forming, storming, norming, performing, and adjourning: the sequential, but reversible, stages of team development.
Situational leadership
Adapting leadership style to the readiness, meaning competence and confidence, of the person or team for a specific task.
RACI chart
A responsibility assignment matrix identifying who is Responsible, Accountable, Consulted, and Informed for each activity, with exactly one Accountable party per activity.
Maslow's hierarchy of needs
A theory holding that people pursue higher-order needs, such as belonging and self-actualization, only after basic needs like safety are met.
Herzberg's two-factor theory
Distinguishes hygiene factors, such as pay and job security, which prevent dissatisfaction, from motivators, such as recognition and growth, which drive engagement.
Theory X and Theory Y
Two contrasting management assumptions: Theory X holds people avoid work and need supervision; Theory Y holds people are self-motivated when given responsibility.
Intrinsic motivation
Motivation driven by autonomy, mastery, and purpose, which is why self-organizing teams often outperform closely supervised ones.