1–5 or A–E to answer · ← → to move · F to flag · R for the review panel
Full Dress Rehearsal
This is not another quiz. It is the real instrument at real length (180 questions in 240 minutes, matching the PMP exam format PMI adopted in July 2026), so the first time you sit that long under a real clock is not the day that counts. (The real exam also includes two optional 10-minute breaks; this simulation does not model breaks, so treat the clock as slightly tighter than the real day.)
Questions are drawn fresh each sitting to these domain weights (the same weighting already used across the course content), never evenly across the pool. Question order and answer order both shuffle, and items you saw in your last two sittings are held back where the pool allows it.
| Domain | Weight | Questions |
|---|---|---|
| People | 33% | ~59 |
| Process | 41% | ~74 |
| Business Environment | 26% | ~47 |
Set aside the full 3 hours before you begin. Your answers, your flags and the start time are saved every 15 seconds, so a crash or a closed tab will not lose your work, but the clock keeps running against the original start time either way. If the 240 minutes elapse while the page is closed, the sitting is scored as it stood.
Everything works without a mouse. 1–5 or A–E selects an answer. → or N is next, ← or P is previous, F flags, R opens the review panel, Esc closes it. Every target is at least 48 pixels, and nothing needs a drag, a hover or a precise tap.
Sitting In Progress
1–5 or A–E to answer · ← → to move · F to flag · R for the review panel
Review
Pick any question to jump straight to it. The clock keeps running.