RAS 100%

Registered Accessibility Specialist

Lesson 2: The three eligibility pathways in depth

Texas Administrative Code Rule 68.70 · 14 practice questions

0:00 / --:--

Reading

Texas Administrative Code Rule 68.70 sets out three separate pathways to qualify for RAS certification. An applicant needs to meet only one, not all three, and none of the three by itself is enough. Every pathway still leads to the same remaining requirements: passing the written exam TDLR approves (given by PSI), passing a criminal history background check, and paying the required fee, all finished within one year of the date TDLR receives the application.

Pathway one: degree plus one year of experience

This pathway requires a degree in architecture, engineering, interior design, landscape architecture, or an equivalent field, combined with a minimum of one year of experience related to building inspection, building planning, accessibility design or review, or accessibility inspection. The degree alone does not qualify an applicant. It has to be paired with real experience in the kind of work a RAS actually does, reviewing or inspecting buildings against a technical standard.

Pathway two: eight years of experience, no degree required

This pathway asks for eight years of experience in building inspection, building planning, accessibility design or review, accessibility inspection, or equivalent work, with no degree requirement at all. This is the pathway built for someone who has spent a long career doing this kind of work in the field rather than in a design office, and it is the pathway most likely to fit a construction manager, estimator, or inspector who has been doing hands-on building work for most of a career without an architecture or engineering degree.

Pathway three: four years of experience plus a model code certification

This pathway shortens the experience requirement to four years, but only if the applicant also holds a certification as an accessibility inspector or plans examiner granted by a model building code organization. The rule does not name a specific organization, only that the certification has to come from "a model building code organization," the kind of body that publishes the model building codes used across jurisdictions. The International Code Council is one example of that kind of organization, but the rule leaves the list of qualifying organizations and certifications undefined rather than naming ICC or any other body.

Which pathway fits GCHS staff

GCHS's service lines are construction management, inspections, and estimating, not design. Staff without an architecture, engineering, or interior design degree who have spent eight years or more doing building inspection, planning, or related accessibility work would look first at pathway two. Staff with a shorter tenure but who already hold an accessibility inspector or plans examiner certification from a model building code organization would look at pathway three instead, since it cuts the experience requirement from eight years to four. The degree pathway is the least likely fit for GCHS's existing staff profile, since it depends on a specific academic background most construction management and inspection careers do not include.

What counts as qualifying experience

All three pathways use the same list of qualifying experience areas: building inspection, building planning, accessibility design or review, and accessibility inspection, or work TDLR considers equivalent to those. Rule 68.70 does not further define "equivalent," so an applicant relying on that language should be prepared to explain, in their own application, how their specific work history maps onto one of the named categories rather than assuming any construction-adjacent job automatically qualifies.

The application and the one-year clock

An applicant files the RAS License Application with TDLR, documenting which pathway they meet. TDLR asks for the completed application, a resume and copies of any degree or certification, and a non-refundable $300 fee. TDLR staff then verify eligibility, and PSI sends the applicant an eligibility notice to schedule the exam. From the date TDLR receives the application, the applicant has one year to complete every remaining requirement, including passing the written exam. After that year, the applicant must submit a new application, supporting documents, and a new fee. The clock starts when the application is received, so an applicant should file when ready to move toward the exam and plan the study and test date inside that year.

Criminal history

TDLR conducts a criminal history background check on everyone who applies. An applicant who has ever been convicted of a felony or a misdemeanor other than a minor traffic violation, or who pleaded guilty or no contest and received deferred adjudication, must send a completed Criminal History Questionnaire with the application materials. Convictions are reviewed case by case, and a license may be denied depending on the nature of the conviction and how long before the application it occurred.

The three eligibility pathways compared Three parallel bars showing the degree-plus-one-year pathway, the eight-years-experience pathway, and the four-years-plus-certification pathway, each converging on the same exam, background check, and fee requirements. Pathway 1Degree + 1 year experience Pathway 28 years experience, no degree Pathway 34 years + model code certification Exam, check, feeWithin 1 year of filing RASlicense Any one pathway qualifies an applicant; all three lead to the same exam, background check and fee
All three eligibility pathways lead to the same remaining steps: the PSI exam, the background check, and the fee, completed within one year of filing.

Practice questions

1. How many of the three eligibility pathways must an applicant satisfy?

  1. At least two
  2. All three
  3. None; the exam alone is sufficient
  4. Only one

2. What does pathway one require in addition to the qualifying degree?

  1. One year of related experience
  2. A second degree in a different field
  3. Nothing; the degree alone qualifies
  4. Five years of related experience

3. Pathway two requires how many years of experience, and what degree?

  1. Four years, plus a model code certification
  2. One year, plus any degree
  3. Eight years, with no degree required
  4. Twelve years, with no degree required

4. What does pathway three require alongside four years of experience?

  1. NGMA membership
  2. Completion of a separate TDLR apprenticeship
  3. Certification as an accessibility inspector or plans examiner from a model building code organization
  4. A degree in architecture or engineering

5. Does Rule 68.70 name a specific organization whose certification qualifies for pathway three?

  1. Yes, it names NGMA as the only qualifying organization
  2. No, it says only "a model building code organization"
  3. Yes, it names only the American Institute of Architects
  4. No organization's certification can qualify

6. A GCHS staff member has ten years of building inspection experience and no architecture or engineering degree. Which pathway fits?

  1. None; a degree is always required
  2. Pathway three, since ten years exceeds four
  3. Pathway one
  4. Pathway two

7. What requirements remain after an applicant qualifies under any of the three pathways?

  1. Board certification and a surety bond
  2. The Texas Accessibility Academy and an interview with a TDLR panel
  3. Nothing further is required
  4. Passing the TDLR-approved written exam, a criminal history background check, and the required fee

8. When does the one-year completion clock start?

  1. The day the applicant is born
  2. The day the applicant passes the exam
  3. The date TDLR receives the application
  4. The clock never starts; there is no deadline

9. What happens if an applicant does not complete every requirement, including the exam, within one year?

  1. Nothing happens; the application stays open indefinitely until the applicant chooses to test
  2. The applicant must submit a new application, supporting documents, and a new fee
  3. The pathway automatically upgrades to pathway one and the deadline resets
  4. TDLR extends the deadline automatically by one year for a small late fee

10. Which of these fields is named in pathway one's list of qualifying degrees?

  1. Criminal justice, with a concentration in code enforcement
  2. Architecture, engineering, interior design, or landscape architecture
  3. Business administration, with a concentration in construction management
  4. Public health, with a concentration in environmental health and safety

11. Which pathway is generally the least likely fit for GCHS's current staff profile, and why?

  1. Pathway one, since it depends on a specific academic degree most construction management careers do not include
  2. Pathway two, since it requires no degree
  3. Pathway three, since GCHS staff cannot hold any certifications
  4. None; all three are equally likely

12. The rule's list of qualifying experience areas includes all of the following except:

  1. Grant writing
  2. Building inspection
  3. Building planning
  4. Accessibility design or review

13. An applicant is unsure whether their specific job history counts as "equivalent" experience under the rule. What should they do?

  1. Explain in the application how their work history maps to the named categories
  2. Wait for TDLR to publish a list of job titles that count as equivalent before applying
  3. Apply under all three pathways simultaneously
  4. Assume any construction-related job automatically qualifies

14. An applicant was convicted of a misdemeanor, other than a minor traffic violation, several years ago. What does TDLR require, and how does it treat the application?

  1. Any conviction of any kind permanently bars the applicant from RAS certification, so applying is pointless
  2. TDLR ignores convictions more than five years old, so the applicant needs to submit nothing extra with the application
  3. The applicant sends a completed Criminal History Questionnaire, and the conviction is reviewed case by case
  4. The applicant must qualify under pathway three regardless of experience

Glossary

Rule 68.70
The Texas Administrative Code rule setting out the three RAS eligibility pathways and the exam, background check, and fee requirements.
Model building code organization
A body that publishes model building codes; the International Code Council is a well known example. Rule 68.70 does not name a specific one.
Accessibility inspector/plans examiner certification
The credential pathway three requires alongside four years of experience.
Qualifying experience
Building inspection, building planning, accessibility design or review, or accessibility inspection, or equivalent work.
Criminal History Questionnaire
The form an applicant with a prior conviction or deferred adjudication submits with the RAS application; TDLR reviews each case individually.