Lesson 3: TAS technical chapters, accessible route and doors
2012 Texas Accessibility Standards, Chapters 3 and 4 · 14 practice questions
0:00 / --:--
Reading
This lesson starts the technical core of TAS, the actual numbers a RAS
checks a building against. These come from the 2012 Texas Accessibility
Standards themselves, Chapter 3 (Building Blocks) and Chapter 4 (Accessible
Routes), not from a secondary summary. Every dimension below carries its
TAS section number so you can verify it directly in the standard.
Turning space, the building block behind every accessible room
Before a route or a room can be called accessible, a wheelchair user has
to be able to turn around in it somewhere. TAS Section 304.3 gives two
ways to satisfy that: a circular turning space of 60 inches diameter
minimum, or a T-shaped turning space, a 60-inch square footprint with arms
and stem 36 inches wide minimum, keeping 12 inches of clearance at the end
of each arm and 24 inches at the base. Either configuration may use knee
and toe clearance under Section 306, though the T-shaped option only
where that clearance falls at the end of the base or one arm. This is a
building block. It shows up again inside toilet rooms, at the base of
ramps, and anywhere else the standard requires room to turn.
The accessible route: clear width and slope
Section 403.5.1 sets the clear width of a walking surface at 36 inches
minimum, with an exception allowing a short segment down to 32 inches.
Section 403.3 caps the running slope of a walking surface, the slope in
the direction of travel, at 1:20, and the cross slope, perpendicular to
travel, at 1:48 maximum. Above a 1:20 running slope, the surface is no
longer a walking surface under this section, it is a ramp, and Section 405
takes over instead. That threshold matters on a plan review: a designer
who calls a steep walkway a "sidewalk" does not get to skip ramp
requirements just by not calling it a ramp.
Ramps
Section 405.2 caps a ramp's running slope at 1:12 in new construction;
an exception lets existing sites use steeper slopes under Table 405.2 where
space limitations require it. Section 405.6 limits the rise of any single ramp
run to 30 inches, and Section 405.7 requires a landing at the top and bottom of
each run. Section 405.8 requires handrails complying with Section 505 on any
ramp run with a rise greater than 6 inches. A RAS reviewing ramp drawings is
checking three numbers at once: does the slope stay at or under 1:12, does any
single run stay at or under a 30-inch rise, and are handrails present wherever
the rise exceeds 6 inches.
Doors: clear width
Section 404.2.3 requires a minimum clear width of 32 inches at a door
opening, measured with the door held open 90 degrees. This is a clear
opening measurement, not the door leaf's nominal size, so a "36-inch door"
on a set of drawings does not automatically satisfy this section once
you account for the door's thickness and the stop.
Doors: maneuvering clearance
Section 404.2.4 sets maneuvering clearance on both sides of a door, and
the required clearance changes depending on which side a wheelchair user
approaches from and whether the door swings toward or away from them. A
front approach on the pull side, the harder case, needs 60 inches of
clearance perpendicular to the doorway and 18 inches parallel to it, past
the latch side of the door. Other approach types, front push-side, hinge
side, and latch side, each carry their own clearance figures in the same
section. The practical point for a plan review: maneuvering clearance is
not one number, it depends on which side of the door and which direction
of swing you are looking at, so each door on a plan set needs its
clearance checked against the specific configuration drawn, not a single
memorized figure.
Why this lesson matters for GCHS's own work
GCHS already evaluates properties for TAS, ADA, and Section 504
compliance as part of its existing service lines. The specific numbers in
this lesson, the 36-inch route width, the 1:12 ramp slope, the 32-inch
door clearance, and the door maneuvering clearances, are the same numbers
that would appear in a RAS plan review report's list of deficiencies. This
is the technical vocabulary a plan review report is written in.
Core accessible route, ramp, and door dimensions from TAS Chapter 4, each traceable to its own section number.
Practice questions
1. What is the minimum clear width of a walking surface on an accessible route?
There is no minimum width if one wheelchair can pass
32 inches minimum along the entire route, with no exceptions permitted
44 inches minimum, measured at the widest point of the route
36 inches minimum, per Section 403.5.1
Answer: d. Section 403.5.1 sets 36 inches minimum, with an exception allowing a short segment down to 32 inches.
2. What running slope turns a walking surface into a ramp under TAS?
Any slope at all
Steeper than 1:20
Steeper than 1:12
Steeper than 1:48
Answer: b. Section 403.3 caps a walking surface's running slope at 1:20. Steeper than that, Section 405's ramp requirements apply instead.
3. What is the maximum cross slope allowed on an accessible route?
1:20
1:12
1:100
1:48
Answer: d. Section 403.3 caps cross slope, perpendicular to travel, at 1:48 maximum.
4. What is the maximum running slope for a new-construction ramp?
1:20
1:8
1:12
1:48
Answer: c. Section 405.2 caps new-construction ramp slope at 1:12.
5. What is the maximum rise permitted for any single ramp run?
30 inches
60 inches
There is no maximum
12 inches
Answer: a. Section 405.6 limits the rise for any ramp run to 30 inches maximum, and Section 405.7 requires landings at the top and bottom of each run.
6. At what rise does a ramp require handrails under Section 405.8?
Any rise at all
Only above 30 inches
Only above 12 inches
Above 6 inches
Answer: d. A ramp run with a rise greater than 6 inches requires handrails complying with Section 505.
7. What is the minimum clear width required at a door opening?
32 inches minimum, door open 90 degrees
36 inches minimum, door open 45 degrees
Doors have no clear-width requirement
28 inches
Answer: a. Section 404.2.3 requires 32 inches minimum clear width, measured with the door open 90 degrees.
8. Why does a "36-inch door" on a drawing not automatically satisfy the 32-inch clear-width requirement?
It does automatically satisfy it, since a 36-inch door leaf always provides at least 32 inches clear
Clear width is the actual opening with the door open 90 degrees, so thickness and stops reduce it
Because 36 inches is less than 32 inches, so the opening would always be too narrow to use
Because the requirement applies only to interior doors, and this drawing shows an exterior door
Answer: b. Clear width is the actual open clearance measured with the door at 90 degrees, not the nominal door size, so the door's own hardware and stop can reduce it below the nominal figure.
9. Under Section 404.2.4, what clearance does a front approach on the pull side of a door require?
60 inches perpendicular, 18 inches parallel, past the latch side
No clearance is required on the pull side of a door that has a closer
36 inches perpendicular, 12 inches parallel, past the hinge side of the door
18 inches perpendicular, 60 inches parallel, past the latch side of the door
Answer: a. A front pull-side approach requires 60 inches perpendicular to the doorway and 18 inches parallel to it, past the latch side.
10. Does maneuvering clearance at a door use a single figure regardless of approach direction?
Yes, but only for exterior doors
Yes, 60 by 18 inches applies to every door configuration
No, the required clearance changes depending on the approach side and swing direction
No, maneuvering clearance was eliminated in the 2012 edition
Answer: c. Section 404.2.4 sets different clearances for front, hinge-side, and latch-side approaches and for push versus pull sides. Each door has to be checked against its actual configuration.
11. What is the minimum diameter of a circular wheelchair turning space under Section 304.3?
60 inches
36 inches
72 inches
48 inches
Answer: a. Section 304.3.1 requires a 60-inch diameter minimum for a circular turning space.
12. What are the two options for satisfying the wheelchair turning space requirement?
A hallway or a doorway, as long as either is at least 36 inches wide
A 60-inch circle, or a T-shaped space within a 60-inch square
A rectangle or a triangle, each at least 60 inches on its longest side
Only the circular option; T-shaped spaces are not permitted in any room
Answer: b. Section 304.3 allows either a 60-inch-diameter circle or a T-shaped space, a 60-inch square footprint with 36-inch-wide arms and stem.
13. A designer labels a steeply sloped walkway a "sidewalk" instead of a ramp. Does this avoid ramp requirements?
Yes, sidewalks are exempt from TAS entirely
No, but only if the slope exceeds 1:8
Yes, labeling determines which section applies
No, a walking surface with a running slope steeper than 1:20 is a ramp under Section 405 regardless of what it is labeled
Answer: d. Slope, not the label on the drawing, determines whether Section 405's ramp requirements apply. Anything steeper than 1:20 running slope is a ramp regardless of what it is called.
14. Why does this lesson matter directly for a RAS plan review report?
Because these numbers only apply to inspections, not plan review
Because TAS Chapter 4 was repealed in 2012
Because a deficiency in a plan review report is written against a specific TAS section and the dimension the drawing fails to meet
Because plan review reports do not reference specific dimensions
Answer: c. A plan review report's deficiency list is written against the specific TAS section and the dimension the drawing fails, which is exactly the technical vocabulary this lesson covers.
Glossary
Turning space
A 60-inch circle or T-shaped space (Section 304.3) allowing a wheelchair to turn around.
Accessible route
A continuous path meeting Chapter 4's width and slope requirements (Section 403).
Ramp
A walking surface with a running slope steeper than 1:20, governed by Section 405.
Clear width (door)
The actual open clearance at a door held at 90 degrees (Section 404.2.3), not the door leaf's nominal size.
Maneuvering clearance
The floor space required on each side of a door, which varies by approach direction and swing (Section 404.2.4).