2012 Texas Accessibility Standards, Sections 208 and 502 · 14 practice questions
0:00 / --:--
Reading
Lesson 3 already covered a ramp's slope, rise, and handrail requirements
as part of the accessible route. This lesson picks up parking, the other
site element a RAS checks constantly, and revisits ramps only to connect
them to the site-arrival sequence: from the parking space, to the
accessible route, to the building entrance.
How many accessible spaces a lot needs
Section 208.2 sets the required number of accessible parking spaces as
a table keyed to the total spaces in the parking facility. For 1 to 25 total
spaces, 1 accessible space is required. The count then steps up: 26 to 50
requires 2, 51 to 75 requires 3, 76 to 100 requires 4, 101 to 150 requires 5,
151 to 200 requires 6, 201 to 300 requires 7, 301 to 400 requires 8, and 401
to 500 requires 9. From 501 to 1,000 total spaces, the requirement is 2 percent
of the total. At 1,001 spaces and over, it is 20 spaces plus 1 for every
additional 100 spaces or fraction of 100 over 1,000. Where a site has more than
one parking facility, each facility's required count is calculated on its own
total, not the combined total across the whole site.
Van-accessible spaces
Section 502.2 sets a standard accessible car space at 96 inches wide
minimum, paired with an adjacent access aisle under Section 502.3. Section
502.3.1 sets the access aisle at 60 inches wide minimum, and Section 502.3.2
runs it the full length of the space it serves. A van-accessible space is
wider, 132 inches minimum, though the standard allows an exception: a van
space can instead be 96 inches wide if the access aisle is 96 inches wide
minimum, effectively moving the extra width into the aisle instead of the
space itself. Either way, the combined width of space plus aisle is the same,
192 inches (132 plus 60, or 96 plus 96); the standard just allows it to be
split between the space and the aisle in two different ways.
The arrival sequence: parking to route to entrance
None of these numbers work in isolation. An accessible parking space
has to connect to an accessible route, the 36-inch-wide path from lesson
3, without that route relying on a curb ramp that itself exceeds the
1:12 maximum slope from lesson 3's ramp requirements (Section 406.1 applies the
Section 405.2 ramp slope to curb ramps, with the same exception for existing
sites). A RAS reviewing a
site plan is tracing a continuous path: van-accessible space, access
aisle, curb ramp or level connection, accessible route, to the entrance
door's clear width and maneuvering clearance from lesson 3. A single
broken link anywhere in that sequence, a curb ramp too steep, a route
segment narrower than 36 inches, an entrance door without clearance,
makes the whole path noncompliant even if every individual element
elsewhere on the site is correct.
Why this sequence thinking matters for a plan review
A common design error is treating parking, routes, and entrances as
separate drawings reviewed by separate people, each individually
compliant, without anyone checking that they actually connect as one
path a wheelchair user could travel start to finish. A RAS plan review is
partly about catching that specific kind of gap: each piece is correct on
its own sheet, but the site as a whole does not deliver an unbroken
accessible path from the parking space to the door.
Accessible parking connects through an unbroken sequence of aisle, ramp, route, and entrance; one weak link fails the whole path.
Practice questions
1. A parking lot has 40 total spaces. How many accessible spaces does Table 208.2 require?
3
4
1
2
Answer: d. 26 to 50 total spaces requires 2 accessible spaces under Table 208.2.
2. A lot has 600 total spaces. How is the required accessible space count calculated?
2 percent of the total spaces
20 spaces plus 1 per additional 100
Still read directly from the table's fixed numbers
Always exactly 9 spaces, the same as the 401-500 tier
Answer: a. Above 500 total spaces, the requirement switches to 2 percent of the total rather than a fixed table number.
3. A lot has 1,200 total spaces. How is the requirement calculated?
20 spaces plus 1 for each additional 100 spaces or fraction over 1,000
2 percent of 1,200, since the percentage applies to every lot above 500 spaces
A fixed 9 spaces, the same as the 401 to 500 tier, with no further increase
1 accessible space for every 25 total spaces, without any upper limit
Answer: a. Above 1,000 spaces, the rule is 20 spaces plus 1 for each additional 100 spaces or fraction of 100.
4. A site has two separate parking facilities. How is the accessible space count determined?
The combined total across both facilities is used once
Accessible spaces are optional if a site has more than one facility
Each facility's requirement is calculated on its own total, not the combined site total
Only the larger facility needs any accessible spaces
Answer: c. Where more than one parking facility exists on a site, each facility's required count is calculated separately, based on its own total.
5. What is the van-accessible space ratio under Section 208.2.4?
1 van space for every 6 accessible spaces, or fraction of 6
Van spaces are not required separately unless the lot has more than 100 spaces
1 van space for every 2 accessible spaces, or fraction of 2
1 van space for every 10 accessible spaces, or fraction of 10
Answer: a. At least 1 van-accessible space is required for every 6 accessible spaces or fraction of 6.
6. Is the van ratio applied to the lot's total parking count or to the accessible space count?
Neither; it is a fixed number regardless of lot size
The number of employees at the facility
The total parking count for the whole lot
The accessible space count required from Table 208.2
Answer: d. The 1-in-6 ratio applies to the accessible space count, not the lot's total space count.
7. What is the minimum width of a standard accessible car parking space?
84 inches
96 inches
132 inches
60 inches
Answer: b. Section 502.2 sets a standard accessible car space at 96 inches wide minimum.
8. What is the standard minimum width for a van-accessible parking space?
108 inches wide, with a 60-inch access aisle on either side
132 inches, or 96 inches with a 96-inch access aisle
96 inches, with a 60-inch access aisle in every case
60 inches
Answer: b. The standard is 132 inches wide minimum, with an exception allowing 96 inches if paired with a 96-inch-wide access aisle instead.
9. What does the 96-inch space plus 96-inch aisle exception actually change for a van user?
Nothing functionally; it splits the same 192 inches between space and aisle differently
It reduces the combined width available for lift or ramp deployment to 156 inches
It eliminates the need for an access aisle when the van space is at least 96 inches wide
It only applies to compact vans
Answer: a. The combined width is 192 inches either way (132 plus a 60-inch aisle, or 96 plus a 96-inch aisle); the standard allows it to be split between the parking space and the access aisle in two different configurations.
10. What maximum slope must a curb ramp connecting a parking space to the accessible route meet in new construction?
1:20, the running slope limit for a walking surface
Curb ramps have no slope limit if a landing is provided
1:8, the steepest slope allowed for any new curb ramp
1:12, the same ramp maximum from lesson 3
Answer: d. A curb ramp on an accessible route is governed by the 1:12 maximum ramp slope covered in lesson 3 (Section 406.1 applies Section 405.2), subject only to the existing-site exception.
11. Why does a RAS trace the whole arrival sequence, parking through entrance, rather than checking each element separately?
Because TAS only requires checking the entrance door
Because a single broken link anywhere in the sequence, an overly steep curb ramp or a narrow route segment, makes the whole path noncompliant even if every other element is correct
Because sequence checking is optional and not part of a plan review
Because only the parking space itself matters for compliance
Answer: b. The accessible path has to be unbroken from parking to entrance. One noncompliant link anywhere fails the whole sequence.
12. A common design error a RAS is trained to catch is:
Making the accessible route wider than the 36-inch minimum so it exceeds the standard
Installing additional grab bars beyond the minimum at every toilet compartment
Individually compliant drawings that never connect into one unbroken accessible path
Providing more van-accessible spaces than the ratio requires
Answer: c. A frequent gap is separate drawings each passing their own individual review without anyone confirming they connect into one continuous accessible path.
13. A site with 90 total parking spaces provides 4 accessible spaces, none marked van-accessible. Is this compliant on the van requirement?
Yes, van spaces are optional at the owner's discretion
No, all 4 spaces must be van-accessible
Yes, van spaces are only required above 100 total spaces
No, 4 accessible spaces falls within the first 6, so at least 1 must be van-accessible
Answer: d. The 1-per-6 ratio means any count from 1 to 6 accessible spaces requires at least 1 van-accessible space among them.
14. What is the minimum door clear width an accessible route must ultimately reach, connecting back to lesson 3?
28 inches
36 inches
32 inches, per Section 404.2.3
Door width is not part of the arrival sequence
Answer: c. The arrival sequence ends at the entrance door's 32-inch minimum clear width from Section 404.2.3, covered in lesson 3.
Glossary
Table 208.2
Sets required accessible parking space counts by total lot size, switching to 2 percent of the total from 501 to 1,000 spaces, then to 20 plus 1 per 100 over 1,000.
Van-accessible space
Required at a 1-per-6 ratio of accessible spaces (Section 208.2.4); wider, or paired with a wider access aisle (Section 502.2).
Access aisle
The clear space adjacent to an accessible parking space, 60 inches wide minimum (Section 502.3.1).
Arrival sequence
The unbroken accessible path from parking space through access aisle, curb ramp, accessible route, to the building entrance.