Tactile characters, Braille, mounting height, and audible alarm limits under Section 703 · 14 practice questions
0:00 / --:--
Reading
Signs and alarms are Chapter 7 of the 2012 TAS, Communication
Elements and Features. This chapter's requirements are checked less
often than the route and restroom sections earlier in this course, but
they are just as precisely dimensioned, and a mounted sign or an alarm
device is one of the easier things for a reviewer to measure on a site
visit.
Tactile character height
Section 703.2.5 sets raised tactile character height at 5/8 inch
minimum to 2 inches maximum, measured using the uppercase letter "I."
(An exception allows 1/2 inch minimum where separate raised and visual
characters carry the same information.) Signs that identify permanent
rooms and spaces (Section 216.2), and doors at exit passageways, exit
discharge, and exit stairways (Section 216.4.1), must include these
raised characters alongside Braille so a person who cannot read
visually can still identify the room by touch.
Braille dimensions
Table 703.3.1 sets the physical dimensions of Braille dots and cells:
dot base diameter, the distance between dots within a cell, and the
distance between corresponding dots in adjacent cells are all specified
numerically rather than left to the sign manufacturer's judgment. TAS
requires Grade 2 Braille, the contracted form used in standard Braille
literature, positioned below the corresponding raised text
(Section 703.3.2).
Mounting height and location
Section 703.4.1 sets sign mounting height at 48 inches minimum,
measured from the finish floor to the baseline of the lowest tactile
character, to 60 inches maximum, measured to the baseline of the
highest tactile character. Section 703.4.2 sets the sign's location at
the latch side of the door it identifies, with a clear floor space of 18
inches by 18 inches centered on the tactile characters, located beyond
the arc of any door swing between the closed position and a 45 degree
open position, so a person can stand close enough to read them by touch
without the door swinging into them. Special location rules apply at
double doors.
Pictograms and text descriptors
Where a sign includes a pictogram, the pictogram's field, the
background area it occupies, must be 6 inches minimum in height. A text
descriptor identifying what the pictogram represents is placed directly
below the pictogram field (Section 703.6.3), and it must itself comply
with the raised character, Braille, and mounting rules of Sections 703.2
through 703.4. Characters and Braille are not placed inside the
pictogram field (Section 703.6.1).
Audible alarms
Section 702.1 requires fire alarm systems to have permanently
installed audible and visible alarms complying with NFPA 72, the
National Fire Alarm and Signaling Code, incorporated by reference (TAS
cites the 1999 or 2002 edition). Audible notification appliances are
capped at a maximum sound level of 110 decibels at the minimum hearing
distance from the audible appliance. Section 215.1 scopes these
alarms where a fire alarm system provides audible alarm coverage. Guest
rooms that must provide communication features have their own
audible and visible alarm requirements under the same NFPA 72
sections.
Visual alarms and where they are required
Section 702.1's reference to NFPA 72 covers visible alarms as well
as audible ones, so the strobe devices that alert occupants who are
deaf or hard of hearing are part of the same requirement, not a
separate one. Section 215, in TAS Chapter 2's scoping provisions, sets
out where visible alarms must be provided: public and common use areas
(215.2), employee work areas, where the wiring must at least
accommodate future visible alarm integration (215.3), transient
lodging guest rooms (215.4), and residential dwelling units (215.5).
Existing facilities are not required to add visible alarms unless the
fire alarm system is upgraded, replaced, or newly installed. TAS's own
text does not state a candela intensity or flash-rate number for
visible alarms anywhere in Chapter 7 or Chapter 2; those figures are
set by NFPA 72 itself, which TAS incorporates by reference rather than
restates. A GCHS evaluator checking a visible alarm should confirm it
against the installed system's NFPA 72 listing rather than look for a
number inside the TAS text.
Why signage and alarms matter alongside the route and restroom work
A building can have a perfectly compliant accessible route, doors,
and restroom and still fail a person who cannot read a visual sign or
hear a standard alarm. Chapter 7 exists because accessibility is not
only about physical movement through a space, it is also about
identifying where you are and being alerted to an emergency, which is
why a review against TAS looks at signs and alarms alongside the
physical route. Lesson 9 covers TDLR's registration and review
process.
Signage combines raised characters, Braille, mounting height, and clear floor space into one system; alarms add an audible decibel limit under Section 702.1 and a visible-alarm requirement scoped by Section 215, whose candela and flash-rate figures come from NFPA 72 rather than TAS's own text.
Practice questions
1. Under Section 703.2.5, what is the raised tactile character height range, and how is it measured?
5/8 to 2 inches, measured using the uppercase letter "I"
1 to 3 inches, measured on the tallest character in the sign's text, whatever the letter
There is no specified range; the sign maker sets the height according to the expected viewing distance
1/4 to 1 inch, measured on the height of a lowercase letter such as x
Answer: a. Raised tactile characters must be 5/8 inch minimum to 2 inches maximum, measured using the uppercase letter "I."
2. Under Table 703.3.1, are Braille dot dimensions and cell spacing left to the sign manufacturer's discretion?
Yes, manufacturers may choose any dot diameter and spacing they find readable, provided the sign is Grade 2
Braille is optional under TAS and rarely required
No; dot base diameter, within-cell spacing, and between-cell spacing are all set numerically in the table
Only dot base diameter is specified in the table; the spacing within and between cells is left to the sign maker's discretion
Answer: c. Table 703.3.1 sets Braille dot base diameter and both within-cell and between-cell spacing numerically.
3. What grade of Braille does TAS require, and where is it positioned relative to the raised text?
Grade 1 (uncontracted) Braille, positioned above the raised text and separated from it by 3/8 inch or more
Either grade is acceptable, positioned anywhere on the sign
Braille is not required if tactile characters are present
Grade 2 (contracted) Braille, positioned below the corresponding raised text
Answer: d. Section 703.3 requires contracted (Grade 2) Braille, and Section 703.3.2 positions it below the corresponding text.
4. Under Section 703.4.1, what is the required sign mounting height, and how is it measured?
48 to 60 inches, the minimum measured to the baseline of the lowest tactile character and the maximum to the baseline of the highest
36 to 48 inches, measured to the top of the sign
60 to 72 inches, measured to the center of the sign
40 to 54 inches, measured to the bottom of the sign
Answer: a. Signs mount 48 inches minimum above the finish floor, measured to the baseline of the lowest tactile character, to 60 inches maximum, measured to the baseline of the highest tactile character.
5. Under Section 703.4.2, where is a room identification sign located relative to the door, and why?
On the door itself, so it swings with the door
On the latch side of the door, with 18 by 18 inches of clear floor space, so the door swing does not block someone reading it by touch
On the hinge side of the door, wherever space allows
Location is not specified; any nearby wall is acceptable
Answer: b. The sign goes on the latch side with an 18-by-18-inch clear floor space centered on it, so the door swing doesn't interfere with someone reading it by touch.
6. What is the minimum height of a pictogram's field (background area) on an accessible sign?
2 inches
4 inches
6 inches
10 inches
Answer: c. A pictogram field must be 6 inches minimum in height.
7. Under Section 703.6, where is a pictogram's text descriptor placed, and must it also be tactile?
Text descriptors are not required for pictograms
Inside the pictogram field itself, overlapping the image, in visual characters only with no raised lettering
Directly below the pictogram field, with raised characters and Braille like other tactile text
Above the pictogram field, as plain visual text that need not be raised or have Braille
Answer: c. Section 703.6.3 places text descriptors directly below the pictogram field and requires them to comply with 703.2 through 703.4, so they are raised and have Braille. Section 703.6.1 keeps characters and Braille out of the pictogram field.
8. Under Section 702.1, what code does TAS incorporate by reference to set audible alarm requirements, and what is the maximum sound level?
NFPA 72; 110 decibels maximum
IBC Chapter 9; 95 decibels maximum
ADA Standards Part 6; 100 decibels maximum
NEC Article 700; 120 decibels maximum
Answer: a. Section 702.1 incorporates NFPA 72 by reference and caps audible alarm signals at 110 decibels.
9. Under Section 702.1, where is the 110-decibel maximum for an audible notification appliance measured?
At the face of the device itself, whatever the size of the room it serves
At the far wall of the largest room the alarm is meant to serve
No measurement point applies; it limits only the rated output of the device
At the minimum hearing distance from the audible appliance
Answer: d. Section 702.1 limits audible notification appliances to no more than 110 dB at the minimum hearing distance from the audible appliance.
10. Where do the specific visible alarm candela intensity and flash-rate figures come from under TAS?
TAS Section 702.1 states them directly, giving a specific candela minimum
They are set by NFPA 72, which Section 702.1 incorporates by reference rather than restating in TAS's own text
Visual alarms are not addressed by TAS at all
They are set locally by each county's fire marshal
Answer: b. Section 702.1 requires visible alarms complying with NFPA 72 (1999 or 2002 edition); the candela and flash-rate specifics live in NFPA 72, not in TAS's own text.
11. Who is the visual alarm requirement primarily intended to alert?
Building maintenance staff, who need a visual cue to service the fire alarm panel after hours
Occupants who are deaf or hard of hearing, who may not perceive an audible alarm
Visual alarms serve no distinct population; they simply duplicate the audible alarm in every space and are optional
People with mobility impairments only, since they need extra time to reach an exit from upper floors
Answer: b. Visual (strobe) alarms alert occupants who are deaf or hard of hearing and would not reliably perceive an audible signal alone.
12. A reviewer finds a room sign with the baseline of its highest tactile character 62 inches above the floor, with correct raised characters and Braille. Is the mounting height compliant?
Compliance depends only on the clear floor space, not mounting height
No; 62 inches exceeds the 60-inch maximum set by Section 703.4.1
Yes, any height above 48 inches is compliant
Yes, because the sign content itself is correct
Answer: b. 62 inches exceeds the 60-inch maximum measured to the baseline of the highest tactile character (703.4.1), so it is not compliant even though the sign's content is otherwise correct.
13. Why does this course connect signage and alarm requirements back to the route and restroom lessons rather than treating them separately?
Signage and alarms are unrelated to accessibility and included only for completeness at the end of the technical lessons, after the route and restroom material
Because TDLR does not actually review signage or alarms
Because Chapter 7 replaces the earlier chapters entirely
Because full accessibility includes identifying where you are and being alerted to an emergency, not just physical movement through a space
Answer: d. A compliant route and restroom don't help someone who can't read a sign or hear an alarm; Chapter 7 covers that other half of accessibility.
14. What is the clear floor space dimension required in front of a latch-side room identification sign under Section 703.4.2?
No clear floor space is required for signage
24 by 24 inches
18 by 18 inches
30 by 48 inches
Answer: c. An 18-inch-by-18-inch clear floor space, centered on the tactile characters and beyond the arc of any door swing, is required (703.4.2).
Glossary
Tactile character
A raised letter or number on a sign, 5/8 to 2 inches tall, readable by touch and required alongside Braille for permanent room identification.
Grade 2 Braille
The contracted form of Braille used in standard literature, required by TAS and placed below the corresponding raised text.
Pictogram field
The background area behind a pictogram symbol on a sign, required to be 6 inches minimum in height, with a text descriptor placed below it.
NFPA 72
The National Fire Alarm and Signaling Code, incorporated by reference under TAS Section 702.1 (1999 or 2002 edition) to govern both audible and visible fire alarms. TAS adds its own 110-decibel audible maximum; the candela and flash-rate figures for visible alarms come from NFPA 72.
Visual alarm
A strobe-type alarm device required to alert occupants who are deaf or hard of hearing; scoped by Section 215 and required under Section 702.1, with its candela and flash-rate figures set by NFPA 72 rather than stated in TAS's own text.