UFAS 100%

UFAS 4.2, 4.4, 4.5

Lesson 3: Space allowances, reach ranges, protruding objects, and surfaces

UFAS 4.2, 4.4, 4.5 · 14 practice questions

0:00 / --:--

Reading

This lesson covers the dimensions UFAS treats as building blocks, numbers that reappear once you reach later chapters on doors, toilet rooms, and dwelling units. Section 4.2, Space Allowances and Reach Ranges, sets how much room a wheelchair user needs to move and turn, and how high or low a control can be mounted and still be usable. Section 4.4, Protruding Objects, keeps hazards out of the path of a person walking with a cane or who has low vision. Section 4.5, Ground and Floor Surfaces, sets what a walking surface is made of and how a change in level along it is handled. Every number below carries its UFAS section number so it can be checked directly.

Wheelchair passage width (4.2.1, 4.2.2)

Section 4.2.1 sets the minimum clear width for a single wheelchair at 32 inches at a single point, such as a doorway, and 36 inches continuously. Section 4.2.2 sets the minimum width for two wheelchairs to pass each other at 60 inches. A GCHS rehab hallway narrowed to less than 36 inches over any real distance fails 4.2.1, even if every doorway along it is wide enough on its own.

Wheelchair turning space (4.2.3)

Section 4.2.3 requires a clear space for a full 180-degree wheelchair turn: either a 60-inch diameter circle, or a T-shaped space fitting within a 60-by-60-inch square, with the T's arms and stem 36 inches wide minimum, as drawn in UFAS Fig. 3(b). This is what lets a wheelchair user reverse direction inside a room rather than being able to enter but not turn back around, and it reappears inside bathrooms and kitchens covered later in this course.

Clear floor or ground space for wheelchairs (4.2.4)

Section 4.2.4.1 sets the minimum stationary clear floor space at 30 by 48 inches, sized for either a forward or a parallel approach to a fixture. Section 4.2.4.2 requires one full unobstructed side of that space to adjoin or overlap an accessible route, or to adjoin another wheelchair clear floor space, so it is actually reachable rather than isolated. If the space is in an alcove or otherwise confined on all or part of three sides, extra maneuvering clearance applies as shown in UFAS Fig. 4(d) and (e). Per those figures, a shallow alcove, 24 inches or less deep for a front approach or 15 inches or less for a side approach, needs no extra allowance, while a deeper alcove needs additional width or length beyond the 30-by-48 minimum. Section 4.2.4.3 requires the floor to meet the surface rules in Section 4.5, covered later in this lesson.

Forward reach (4.2.5)

Where the clear floor space allows only a forward approach, Section 4.2.5 sets the maximum high forward reach at 48 inches and the minimum low forward reach at 15 inches above the floor, the highest and lowest a control can be mounted and still be reachable from a seated position reaching straight ahead. Reaching over an obstruction, such as a counter with a knee space underneath, changes the number, as shown in UFAS Fig. 5(b): where the obstruction is 20 to 25 inches deep, the maximum forward reach drops to 44 inches.

Side reach (4.2.6)

Where the clear floor space allows a parallel approach, Section 4.2.6 sets the maximum high side reach at 54 inches and the minimum low side reach at 9 inches above the floor. Reaching sideways over an obstruction up to 24 inches deep and 34 inches high drops the maximum to 46 inches, as shown in UFAS Fig. 6(c). This is a real difference from the 2010 ADA Standards: Section 308.3.1 there caps unobstructed side reach at 48 inches maximum with a 15-inch minimum, both different from UFAS's 9-to-54-inch range. A fixture mounted to satisfy the ADA's 48-inch maximum also satisfies UFAS, but one mounted at UFAS's full 54-inch maximum would not meet the ADA figure, so a GCHS project using the 2010 ADA alternative under HUD's 2014 notice needs the ADA number here, not the UFAS one.

Protruding objects (4.4.1, 4.4.2)

Section 4.4.1 limits how far an object projecting from a wall, with its leading edge between 27 and 80 inches above the floor, can protrude into a walk, hall, or aisle: no more than 4 inches. The rule protects people using a long cane, which sweeps the lower path but will not detect something cantilevered out at chest or head height. An object at or below 27 inches can protrude further, since a cane sweep or wheelchair footrest reaches it first. A free-standing object on a post can overhang up to 12 inches within that same band. Section 4.4.2 separately requires 80 inches of clear head room through any circulation space, and a barrier to warn blind or visually impaired people where the vertical clearance of an area adjoining an accessible route drops below that.

Changes in level (4.5.1, 4.5.2)

Section 4.5.1 requires ground and floor surfaces on accessible routes to be stable, firm, and slip-resistant. Section 4.5.2 governs how abrupt a level change can be: up to 1/4 inch is allowed with no edge treatment; between 1/4 and 1/2 inch requires a bevel sloped no steeper than 1:2; anything greater than 1/2 inch must be handled as a ramp, curb ramp, or other sloped transition, not a simple lip. Doorway thresholds have their own limits in Section 4.13.8, covered in Lesson 5. A 3/4-inch vertical step in a hallway or room floor is a common, easy-to-miss failure on GCHS rehab sites.

Carpet and gratings (4.5.3, 4.5.4)

Section 4.5.3 caps carpet pile height at 1/2 inch and requires carpet to be securely attached, with a firm cushion, pad, or backing or none, with exposed edges fastened and trimmed along their full length. Carpet tile has its own limit: the combined thickness of pile, cushion, and backing may not exceed 1/2 inch, so a thick pad or backing under an otherwise low-pile carpet tile can push it over the limit. Section 4.5.4 limits grating openings to 1/2 inch in the smaller dimension, and elongated openings, such as a slotted floor drain, must run perpendicular to the dominant direction of travel so a caster or cane tip cannot drop into a long slot.

Key numbers

Wheelchair passage: 32 in. at a point, 36 in. continuous (4.2.1). Two wheelchairs passing: 60 in. (4.2.2). Turning space: 60 in. circle, or T-shape in a 60 by 60 in. square with 36 in. arms (4.2.3). Clear floor space: 30 by 48 in. (4.2.4.1). Forward reach: 48 in. max, 15 in. min; 44 in. max over a 20-25 in. deep obstruction (4.2.5). Side reach: 54 in. max, 9 in. min; 46 in. max over a 24 in. deep, 34 in. high obstruction (4.2.6). Protruding objects: 4 in. max between 27 and 80 in. high; 80 in. min headroom (4.4). Level changes: 1/4 in. unramped, 1/4-1/2 in. beveled at 1:2, over 1/2 in. needs a ramp (4.5.2). Carpet pile: 1/2 in. max; carpet tile 1/2 in. max combined pile, cushion, and backing (4.5.3). Grating openings: 1/2 in. max (4.5.4).

Why this matters for GCHS

These are the numbers a GCHS estimator or inspector checks on almost every modification: clear hallway width, a 30-by-48 clear floor space at the new grab bar, reach-range switch height, threshold lip height. Getting 4.2 and 4.5 right at estimating avoids rework later, and the side-reach difference from the 2010 ADA alternative matters directly on any project using that HUD 2014 option, covered fully in Lesson 9.

Reach ranges and clear floor space under UFAS 4.2 An elevation view on the left showing a seated figure's forward reach zone from 15 inches minimum to 48 inches maximum, and side reach zone from 9 inches minimum to 54 inches maximum, with the obstructed side reach reduced to 46 inches over a 24-inch-deep, 34-inch-high obstruction. A plan view on the right shows the 30-by-48-inch clear floor space in front of a fixture, connected to an accessible route. Forward reach (4.2.5) 48 in. 15 in. Forward reach zone 15-48 in. Side reach (4.2.6) 24 x 34 in. 54 in. max 46 in. over obstr. 9 in. min Plan: clear floor space (4.2.4) Fixture / control Clear floor space 30 in. x 48 in. 48 in. 30 in. Accessible route side
Reach ranges run lower and lower-topped for side reach than forward reach; obstructions in front of a fixture reduce both. The clear floor space in front of a fixture must connect to an accessible route on at least one full side.

Practice questions

1. Under Section 4.2.1, what is the minimum clear width for continuous single wheelchair passage?

  1. 28 inches
  2. 32 inches
  3. 36 inches
  4. 44 inches

2. What is the minimum width for two wheelchairs to pass each other under Section 4.2.2?

  1. 60 inches
  2. 36 inches
  3. 48 inches
  4. 54 inches

3. What two turning-space configurations does Section 4.2.3 allow?

  1. UFAS does not require turning space
  2. A 48-inch square only
  3. A 60-inch diameter circle, or a T-shape within a 60 by 60 inch square with 36-inch arms and stem
  4. Any space at least 30 inches wide

4. What is the minimum clear floor or ground space for a stationary wheelchair under Section 4.2.4.1?

  1. 30 inches by 48 inches
  2. 36 inches by 36 inches
  3. 24 inches by 48 inches
  4. 60 inches by 60 inches

5. Under Section 4.2.5, what is the unobstructed high forward reach maximum, and the low forward reach minimum?

  1. 48 inches max, 9 inches min
  2. 54 inches max, 9 inches min
  3. 44 inches max, 15 inches min
  4. 48 inches max, 15 inches min

6. Reaching forward over an obstruction 20 to 25 inches deep, what does the maximum forward reach become?

  1. 48 inches, unchanged
  2. 44 inches
  3. 54 inches
  4. Forward reach is prohibited over any obstruction

7. Under Section 4.2.6, what is the unobstructed high side reach maximum, and the low side reach minimum?

  1. 44 inches max, 9 inches min
  2. 60 inches max, 9 inches min
  3. 54 inches max, 9 inches min
  4. 48 inches max, 15 inches min

8. How does the 2010 ADA Standards' unobstructed side reach figure (Section 308.3.1) compare to UFAS Section 4.2.6?

  1. The ADA figure is higher than UFAS's maximum
  2. The ADA figure is 48 inches max, 15 inches min, both different from UFAS's 54 inches max, 9 inches min
  3. The two standards use identical numbers for unobstructed side reach, so a fixture set to the UFAS range also meets the ADA figure
  4. UFAS has no side reach requirement at all

9. Under Section 4.4.1, how far can a wall-mounted object with its leading edge between 27 and 80 inches above the floor protrude into a circulation path?

  1. No more than 4 inches
  2. No more than 12 inches
  3. Protrusions are prohibited entirely in this height band
  4. Any distance

10. What is the minimum clear head room required through a circulation space under Section 4.4.2?

  1. 78 inches
  2. 80 inches
  3. 84 inches
  4. 72 inches

11. Under Section 4.5.2, a change in level of 3/8 inch requires what treatment?

  1. A full ramp compliant with Section 4.8, because any change in level over 1/4 inch needs one
  2. 3/8 inch changes are prohibited outright
  3. No treatment is required
  4. A beveled edge sloped no steeper than 1:2

12. A GCHS rehab site has a 3/4-inch unramped vertical change in level in a hallway floor, away from any doorway. Does this comply with Section 4.5.2?

  1. Yes, any change in level under 1 inch is exempt
  2. Yes, because hallway floors are not covered by 4.5.2
  3. Yes, as long as it is beveled at 1:2
  4. No; changes greater than 1/2 inch must be handled as a ramp or similar sloped transition, not a beveled lip

13. Under Section 4.5.3, what is the maximum pile height of carpet used on an accessible floor?

  1. 1/4 inch
  2. There is no limit as long as the carpet is securely attached
  3. 1/2 inch
  4. 1 inch

14. Under Section 4.5.4, what is the maximum width of a grating opening, and how should elongated openings be oriented?

  1. No maximum width, any orientation
  2. 1/2 inch maximum, oriented perpendicular to the dominant direction of travel
  3. 1/2 inch maximum, oriented parallel to the dominant direction of travel, so the slots run with the traffic
  4. 1 inch maximum, oriented parallel to travel

Glossary

Clear floor space
The 30-by-48-inch minimum footprint a stationary wheelchair needs in front of a fixture or control, under Section 4.2.4.1.
Forward reach
Reach range for a person facing a control directly; 48 inches maximum, 15 inches minimum unobstructed under Section 4.2.5.
Side reach
Reach range for a person approaching a control from the side; 54 inches maximum, 9 inches minimum unobstructed under Section 4.2.6.
Protruding object
An object projecting from a wall with its leading edge between 27 and 80 inches above the floor; limited to 4 inches of protrusion into a circulation path under Section 4.4.1.
Turning space
A 60-inch circular or T-shaped clear floor area allowing a wheelchair user to reverse direction, required under Section 4.2.3.
Bevel
A sloped edge treatment, no steeper than 1:2, required for floor level changes between 1/4 inch and 1/2 inch under Section 4.5.2.
Detectable barrier
A barrier to warn blind or visually impaired people, required where the vertical clearance of an area adjoining an accessible route drops below 80 inches under Section 4.4.2.