This lesson pulls the nine lessons of this course into one place. It
introduces no new dimensions; every figure below was already verified in
Lessons 1 through 9. Use it as a map back to the lesson covering a topic
in depth, and the questions to find any gaps.
When UFAS applies under 24 CFR Part 8
UFAS, published August 7, 1984 under the Architectural Barriers Act, was
jointly adopted by GSA, HUD, DoD, and USPS. GSA, USPS, and DoD each moved to the
newer ABA Accessibility Standards; HUD did not.
24 CFR 8.32 states that conformance with UFAS sections 3 through 8 "shall
be deemed to comply" with HUD's design, construction, and alteration
requirements in 8.21, 8.22, 8.23, and 8.25. Those rules cover facilities
designed, constructed, or altered after July 11, 1988; where design began
before that date, they apply "to the maximum extent practicable." That is
why UFAS is still the standard HUD applies to GCHS's housing.
The 5 percent and 2 percent unit rules, and the substantial-alteration test
UFAS sets the technical design of an accessible unit; 24 CFR Part 8 sets
how many units need it. Section 8.22(b) requires new construction to
make at least 5 percent of units (or 1) accessible for mobility
impairments, plus a separate 2 percent (or 1) for hearing or vision
impairments. Section 8.23(a) applies those percentages to an alteration
only at 15 or more units and 75 percent or more of replacement cost.
Below that, Section 8.23(b) requires alterations to be made accessible to the maximum extent feasible until
5 percent of units are accessible. Section 8.26 requires accessible
units distributed, not clustered.
The building-block numbers: space, reach, and surfaces
Section 4.2 sets dimensions repeated throughout UFAS: 36 inches for
continuous wheelchair passage, a 60-inch turning space, a 30-by-48-inch
clear floor space, forward reach of 15 to 48 inches, and side reach of 9
to 54 inches unobstructed. Section 4.4 caps protruding objects at 4
inches between 27 and 80 inches high, with 80 inches of headroom.
Section 4.5 governs level changes: 1/4 inch needs no treatment, 1/4 to
1/2 inch needs a bevel, and anything greater needs a ramp.
Getting there: routes, parking, and ramps
Section 4.3 sets an accessible route's minimum width at 36 inches with a
1:50 maximum cross slope; above 1:20 slope, a surface becomes a ramp.
UFAS ties parking counts to a table keyed to lot size, and sizes a
standard space at 96 inches with a 60-inch aisle; for a van space it
recommends a 96-inch aisle, while the 2010 ADA Standards make a van space
132 inches wide with a 60-inch aisle unless the space is 96 inches wide
with a 96-inch aisle. Curb ramps and ramps cap slope at 1:12 in new
construction, with ramps
capped at 30 inches of rise per run, handrails above a 6-inch rise, and
a 2-inch minimum edge curb.
Doors and vertical access
Section 4.13.5 sets minimum clear doorway width at 32 inches, and
Figure 25 sets maneuvering clearances that vary by approach and by
pushing or pulling. Stairs require an 11-inch minimum tread, prohibit
open risers, and mount handrails 30 to 34 inches above the nosings.
Elevators must self-level within 1/2 inch, with set dimensions for
buttons, lanterns, and reopening devices. A platform lift may
stand in for an elevator only where no other alternative is feasible.
Toilet and bathing facilities
Water closets sit 17 to 19 inches high with grab bars at least 36
inches (rear) and 42 inches (side) long, as drawn in Figure 29. Toilet
stalls are drawn 60 inches wide in Figure 30(a), with 9 inches of toe
clearance. Lavatories cap rim height at 34 inches with at least 29 inches
from the floor to the bottom of the apron. Section 4.26 sets one shared
rule behind every grab bar: 1-1/4 to 1-1/2 inches in diameter, 1-1/2 inches
of wall clearance, and a 250-pound-force load rating. The fixture figures
place the bars 33 to 36 inches above the floor.
Alarms and signage
An audible alarm must exceed ambient sound by at least 15 decibels, or
any 30-second maximum by 5, whichever is louder, never exceeding 120
decibels; a visual alarm must flash under 5 Hz. Sleeping accommodations
need a wired visual alarm or a 110-volt receptacle, with instructions.
Signage requires set character proportions, contrast, raised characters
for tactile reading, and mounting on the latch side, 54 to 66 inches
above the floor. Section 4.34.2(10) carries the alarm rule into the
unit, and 8.22(b)'s 2 percent figure scopes how many units need it.
Dwelling unit kitchens and baths
A unit may be built permanently accessible or adaptable, with
documentation of how an adaptable feature converts later. Kitchens need
40 inches of clearance between opposing counters (60 inches U-shaped), a
30-inch counter section at 34 inches maximum or adjustable to 28, 32, or
36 inches, and a sink bowl no deeper than 6.5 inches. Section 4.27
governs every control: reach ranges matching Section 4.2, receptacles at
least 15 inches above the floor, and one-hand operation at no more than
5 pounds of force.
HUD's 2014 alternative and where the rule stands today
HUD's May 23, 2014 notice, docket FR-5784-N-01, lets a
recipient use the 2010 ADA Standards instead of UFAS, only in full, with
HUD's exceptions layered on top for alteration scoping, common-use and
employee work areas, vehicular-only site connections, private-building
elevator exemptions, the visible-alarm trigger, and common-use laundry
equipment. Real differences remain: UFAS's 54-inch, 9-inch side reach
differs from the 2010 ADA Standards' 48-inch, 15-inch range, and UFAS
requires front-loading common-use laundry where the 2010 ADA Standards
allow top-loading. The official notices checked for this course show
no change finalized as of September 2026: HUD's April 25, 2023 Advance
Notice of Proposed Rulemaking sought comment, closing July 24, 2023, and no
later proposed or final rule turned up. UFAS remains the rule GCHS works
under today.
Key numbers board
8.22/8.23(a): 5%+2% units; 15+ units, 75%+ replacement cost. Turning
space: 60 in. Route/ramp: 36 in. min., 1:12 max slope. Doors: 32 in.
min. Grab bars: 33-36 in., 250 lbf. Alarms: +15 dB, 120 dB cap; flash
under 5 Hz. Signage: latch side, 54-66 in. Kitchen counter/sink: 34 in.
max. Side reach, UFAS vs. ADA: 54/9 in. vs. 48/15 in.
Ten key numbers from Lessons 2 through 9, each keeping its section number.
Why this matters for GCHS
GCHS jobs rarely touch one section at a time. A single bathroom
remodel can involve the substantial-alteration question from Lesson 2,
the reach ranges from Lesson 3, the grab bar rule from Lesson 6, and,
if the 2010 ADA Standards were elected, the side-reach difference from
Lesson 9, all at once. Keeping the numbers straight across sections is
what keeps a project compliant end to end.
Practice questions
1. Under HUD's own regulation, 24 CFR 8.32, why does UFAS remain a live compliance standard for GCHS's HUD-funded work even though GSA, USPS, and DoD have all moved to the current ABA Accessibility Standards?
HUD adopted the 2004 ABA Standards in 2010, the same year as the other three agencies
UFAS binds only federal buildings, never HUD-funded housing
GCHS itself is a federal agency required to follow UFAS directly
Section 8.32 states that conformance with UFAS sections 3 through 8 "shall be deemed to comply" with HUD's design and construction requirements, and HUD has not adopted the ABA or 2010 ADA Standards outright
Answer: d. 24 CFR 8.32 deems UFAS-conforming work compliant with 24 CFR 8.21, 8.22, 8.23, and 8.25, and HUD, unlike GSA, USPS, and DoD, has not adopted the ABA or 2010 ADA Standards as its primary standard, so UFAS is still the rule for HUD-funded housing (Lesson 1).
2. UFAS was published in the Federal Register on what date, and under what federal law was it jointly developed and adopted?
March 15, 2012, under the Americans with Disabilities Act
August 7, 1984, under the Architectural Barriers Act of 1968, as amended
July 11, 1988, under the Fair Housing Act of 1968, as amended, by HUD alone
2004, under the Rehabilitation Act of 1973, jointly by the Access Board and the Department of Justice
Answer: b. UFAS was published August 7, 1984, jointly developed and adopted under the Architectural Barriers Act of 1968, as amended, by GSA, HUD, DoD, and USPS (Lesson 1).
3. Under 24 CFR 8.22(b), new HUD-funded multifamily housing must provide accessible units in what split?
2 percent for mobility impairments, 5 percent for hearing or vision impairments
7 percent combined, with no separate counts kept
A minimum of 5 percent of units (or 1, whichever is greater) for mobility impairments, plus an additional 2 percent (or 1) for hearing or vision impairments
10 percent for mobility impairments only, with no hearing/vision requirement
Answer: c. Section 8.22(b) sets 5 percent (or 1 unit) for mobility impairments plus an additional, separate 2 percent (or 1 unit) for hearing or vision impairments (Lesson 2).
4. Field scenario: GCHS is scoping a rehab of a 22-unit HUD-assisted apartment building where the alteration is budgeted at 80 percent of the building's replacement cost. Which standard governs the required accessible-unit count?
No accessibility standard applies, since this is existing housing, not new construction
The 2010 ADA Standards automatically, regardless of any HUD election
Section 8.22's full new-construction percentages, because the project meets both parts of 8.23(a)'s substantial-alteration test: 15 or more units, and 75 percent or more of replacement cost
Section 8.23(b), "maximum extent feasible," because any alteration work defaults there
Answer: c. With 22 units (over the 15-unit floor) and an alteration cost at 80 percent of replacement cost (over the 75 percent floor), this project meets both conditions of 8.23(a) and is held to the same 5 percent and 2 percent figures as new construction under 8.22 (Lesson 2).
5. Under Section 4.2.5, unobstructed forward reach runs from what minimum to what maximum height above the floor?
9 inches minimum to 54 inches maximum
15 inches minimum to 44 inches maximum
9 inches minimum to 48 inches maximum
15 inches minimum to 48 inches maximum
Answer: d. Section 4.2.5 sets unobstructed forward reach at 15 inches minimum to 48 inches maximum (Lesson 3).
6. Under Section 4.5.2, a floor level change of 5/8 inch requires what treatment?
A beveled edge sloped no steeper than 1:2, the same treatment allowed for a 3/8-inch change in level
5/8-inch level changes are prohibited outright under any circumstance
No treatment is required at that height
A ramp or similar sloped transition, since 5/8 in. exceeds the 1/2 in. limit for a bevel
Answer: d. Section 4.5.2 allows a bevel only up to 1/2 inch; anything greater, including 5/8 inch, must be handled as a ramp or similar sloped transition (Lesson 3).
7. Under Section 4.3, what is the maximum cross slope allowed on an accessible route?
There is no cross-slope limit on an accessible route
1:12
1:20
1:50
Answer: d. Section 4.3 caps an accessible route's cross slope at 1:50 maximum, tighter than the 1:20 threshold that turns a walking surface into a ramp (Lesson 4).
8. Field scenario: A GCHS-built ramp has a compliant 1:12 slope and a 28-inch rise in a single run, with a full 36-inch clear width, but no landing at the top and no handrails anywhere along the run. Is this ramp compliant with Section 4.8?
No, but only because a 36-inch clear width is too narrow for a ramp with a 28-inch rise
No; 4.8.4 requires landings at both ends of a run and 4.8.5 requires handrails above a 6-inch rise
Yes, because slope and rise are the only two figures that Section 4.8 regulates, and both are within the limits
Yes, because a rise under 30 inches never requires a landing
Answer: b. A compliant slope and rise do not excuse a missing landing or missing handrails; Section 4.8.4 requires landings at both ends of a run and Section 4.8.5 requires handrails wherever rise exceeds 6 inches, which a 28-inch rise does (Lesson 4).
9. Under Section 4.13.5, what is the minimum clear opening width of a doorway on an accessible route?
28 inches
32 inches
30 inches
36 inches
Answer: b. Section 4.13.5 sets the minimum clear doorway opening at 32 inches, measured with the door open 90 degrees (Lesson 5).
10. Under Section 4.9.4, at what height above the stair nosings must a handrail's gripping surface be mounted?
24 to 28 inches
36 to 42 inches, fixed
34 to 38 inches
30 to 34 inches
Answer: d. Section 4.9.4 requires the handrail gripping surface at 30 to 34 inches above the stair nosings, with 1-1/2 inches of clearance from the wall (Lesson 5).
11. Under Section 4.16.3, what is the required height range for an accessible water closet, measured to the top of the seat?
19 to 21 inches
17 to 19 inches
14 to 16 inches
15 to 17 inches
Answer: b. Section 4.16.3 sets water closet height at 17 to 19 inches, measured to the top of the seat (Lesson 6).
12. Field scenario: A GCHS crew installs a shower stall grab bar rated to resist a 200 pound-force load without failure. Does this meet Section 4.26.3?
No; Section 4.26.3 requires resisting a 250 pound-force load, so a 200 lbf rating falls short
Yes, because 200 lbf is well above ordinary hand-load use
Yes, because Section 4.26.3 only regulates a grab bar's diameter and wall clearance, not its load rating
Yes, since any load rating above 100 lbf satisfies UFAS
Answer: a. Section 4.26.3 sets the minimum load rating at 250 pounds-force; a bar rated to only 200 lbf does not meet that requirement regardless of its height or diameter (Lesson 6).
13. Under Section 4.28.2, how much must an audible emergency alarm exceed ambient sound by, and what ceiling may it never exceed?
At least 15 dB over ambient (or 5 dB over any 30-second maximum, whichever is louder), never exceeding 120 dB
Exactly 10 decibels over ambient in every room, with no stated ceiling on alarm sound levels
At least 20 decibels over ambient, or 10 decibels over any 30-second maximum, whichever is louder, never exceeding 110 decibels
At least 5 decibels over ambient or 15 over any 30-second maximum, never exceeding 130 decibels
Answer: a. Section 4.28.2 requires at least 15 dB over ambient, or 5 dB over any 30-second maximum, whichever is louder, capped at 120 dB (Lesson 7).
14. Under Section 4.30.6, where and at what height must required interior room signage be mounted?
Anywhere in the room, at standing eye level
On the hinge side of the door, at any convenient height between 48 and 72 inches above the floor
Alongside the door on the latch side, between 54 and 66 inches above the finished floor
On the face of the door itself, at exactly 48 inches
Answer: c. Section 4.30.6 requires mounting alongside the door on the latch side, between 54 and 66 inches above the finished floor (Lesson 7).
15. Under Section 4.34.6.1, what clearance must separate opposing base cabinets, countertops, appliances, or walls in a U-shaped kitchen?
36 inches minimum
40 inches minimum, the same as any other kitchen layout
60 inches minimum
30 inches minimum
Answer: c. Section 4.34.6.1 sets 40 inches minimum clearance generally, rising to 60 inches minimum in a U-shaped kitchen (Lesson 8).
16. Field scenario: A GCHS kitchen remodel has a compliant 34-inch counter section and the correct 30-by-48-inch clear floor space at the sink, but the faucet is a round knob that requires a firm twist to turn on. Does this comply with Section 4.27.4?
No; Section 4.27.4 requires controls usable without tight grasping, pinching, or twisting, so the twist knob fails
Yes, because faucet handle type is outside the scope of Section 4.27
Yes, because the 34-inch counter height and the 30-by-48-inch clear floor space are the only requirements that matter here
No, but only because the counter should have been 36 inches instead of 34 inches
Answer: a. Section 4.27.4 applies to every control in the unit, including the kitchen faucet; a twist knob requiring a firm grip fails that section regardless of the correct counter height and clear floor space (Lesson 8).
17. HUD's May 23, 2014 Federal Register notice, docket FR-5784-N-01, permits a HUD recipient to do what?
Ignore Section 504 accessibility requirements for new construction going forward when a 2010 ADA design is used
Use the 2010 ADA Standards instead of UFAS, but only with the exceptions HUD attaches
Repeal UFAS entirely for all HUD-funded housing
Mix individual UFAS and 2010 ADA provisions freely, element by element, on the same project
Answer: b. The 2014 notice lets a recipient elect the 2010 ADA Standards instead of UFAS, but only in full and only with HUD's own list of exceptions layered on top; it does not repeal UFAS or allow mixing standards (Lesson 9).
18. As of September 2026, what do the official notices checked for this course show about HUD's Section 504 rulemaking on a possible replacement for UFAS?
HUD's April 25, 2023 Advance Notice of Proposed Rulemaking sought comment; no proposed or final replacement rule turned up
HUD repealed 24 CFR Part 8 entirely in 2025 and replaced it with a rule that adopts the 2010 ADA Standards without exceptions
HUD has taken no action of any kind on this question since UFAS was published in 1984, including notices seeking public comment
HUD's final rule adopted the 2010 ADA Standards outright, effective in 2024, and repealed the 2014 alternative-standard notice
Answer: a. HUD's April 25, 2023 Advance Notice of Proposed Rulemaking sought comment (closing July 24, 2023) on possible updates, but the official notices checked for this course show no proposed or final rule following it as of September 2026; UFAS remains the governing standard under 24 CFR 8.32 (Lesson 9).
19. Field scenario: GCHS is scoping a 12-unit HUD-assisted rehab where alteration costs will run 90 percent of the building's replacement value. Because the project has fewer than 15 units, which section governs, and what technical rulebook applies to the units that must be made accessible?
Section 8.23(a)'s substantial-alteration threshold is not met because the project has fewer than 15 units, so Section 8.23(b)'s "maximum extent feasible" standard applies instead, with UFAS (or the 2010 ADA Standards, if properly elected under the 2014 notice) still supplying the technical requirements
The 2010 ADA Standards apply automatically to every project under 15 units, with no HUD election required
Section 8.22 applies automatically regardless of unit count, with UFAS sections 3 through 8 as the technical rulebook
No accessibility standard applies to any project with fewer than 15 units
Answer: a. Even at 90 percent of replacement cost, a project under 15 units cannot meet 8.23(a)'s substantial-alteration test, which requires both conditions; 8.23(b)'s "maximum extent feasible" standard governs instead, and the technical numbers still come from UFAS or, if properly elected, the 2010 ADA Standards under HUD's 2014 notice (Lessons 2 and 9).
20. Field scenario: A GCHS project elects the 2010 ADA Standards under HUD's 2014 notice for a HUD-funded rehab. The design sets a light switch at 50 inches with an unobstructed side approach, citing UFAS's 54-inch maximum, and specifies a top-loading common-use washer, citing Section 611 of the 2010 ADA Standards. Are both choices compliant?
Yes, because side reach and laundry equipment fall outside the scope of the 2010 ADA Standards entirely
No, but only because of the light switch height; the top-loading washer is acceptable either way
No; having elected the 2010 ADA Standards, the design must follow that standard's own 48-inch side-reach maximum, so 50 inches fails, and HUD's 2014 notice still requires UFAS 4.34.7's front-loading rule for common-use laundry regardless of which standard is elected
Yes, because electing the 2010 ADA Standards means every 2010 ADA number and every 2010 ADA exception applies without exception
Answer: c. A project cannot borrow the more permissive UFAS side-reach figure while using the 2010 ADA Standards; that election means following the 2010 ADA Standards' own 48-inch maximum, so 50 inches fails. Separately, HUD's 2014 notice keeps UFAS 4.34.7's front-loading requirement in force for common-use laundry equipment no matter which standard governs the rest of the project, so the top-loading washer also fails (Lesson 9).
Glossary
UFAS
Uniform Federal Accessibility Standards, published August 7, 1984 under the Architectural Barriers Act; still applied by HUD for residential facilities under 24 CFR 8.32.
Substantial alteration
Under 24 CFR 8.23(a), an alteration to a project of 15 or more units costing 75 percent or more of the replacement cost of the completed facility; triggers the same accessible-unit percentages as new construction under 8.22.
Accessible route
The continuous, unobstructed path connecting accessible site elements to a building entrance and through it; 36 inches wide minimum with a 1:50 maximum cross slope under Section 4.3.
Grab bar
A wall-mounted support bar required at water closets, tubs, and showers; Section 4.26 sets a shared 1-1/4-to-1-1/2-inch diameter, 1-1/2-inch wall clearance, and 250-pound-force load rating for every fixture that requires one, and the fixture figures place the bars 33 to 36 inches above the floor.
HUD's 2014 alternative-standard notice
HUD's May 23, 2014 Federal Register notice, docket FR-5784-N-01, permitting a recipient to use the 2010 ADA Standards instead of UFAS, subject to a specific list of HUD-attached exceptions.
Adaptable design
An accessible dwelling unit built with required clearances and structural blocking in place, but with certain features, most often counter heights, designed to convert later without reconstruction, under Section 4.34.3.
Reach range
The height band within which a control must fall to be usable from a seated position; forward reach is 15 to 48 inches and side reach is 9 to 54 inches under UFAS Sections 4.2.5 and 4.2.6, both reduced over an obstruction.
Clear floor space
The 30-by-48-inch minimum footprint a stationary wheelchair needs in front of a fixture or control, required under Section 4.2.4.1 and repeated throughout the toilet, bathing, and kitchen sections of this course.