CDBG 100%

CDBG Administration

Lesson 6: Eligible activities

24 CFR 570.201 to 570.206 · 14 practice questions

Content current as of September 22, 2026, per the 2026 TxCDBG Project Implementation Manual (effective September 1, 2026) and the current eCFR.

0:00 / --:--

Reading

Meeting a national objective is not enough on its own. An activity also has to be one of the kinds of activities CDBG is allowed to pay for in the first place. That list lives at 24 CFR 570.201 through 570.206, six sections covering everything from acquiring land to running the grant program itself. This lesson is a map of that list, weighted toward the sections that touch GCHS's actual work. One caution first: 570.201 through 570.206 are the Entitlement rules. TxCDBG runs under Subpart I, where 570.482 says the eligible activities are those listed at section 105(a) of the Act (42 USC 5305(a)). The two lists overlap heavily, but for a TxCDBG award the State's program design and manual decide what a local government can actually fund.

The six sections of eligible activities under 570.201 through 570.206 A grid of six boxes, one per CFR section: 570.201 basic eligible activities, 570.202 rehabilitation and preservation, 570.203 special economic development, 570.204 community based development organization activities, 570.205 planning and capacity building, and 570.206 program administrative costs. 570.201 Basic Eligible Activities Acquisition, public facilities, clearance 570.202 Rehabilitation & Preservation Single family, multifamily, code enforcement 570.203 Special Economic Development Business loans, job creation deals 570.204 CBDO Activities Neighborhood revitalization by a CBDO 570.205 Planning & Capacity Building Studies, plans, capacity building 570.206 Program Administration General management, oversight, coordination Under the Entitlement rule, every eligible activity traces back to one of these six sections.
The six CFR sections that define what CDBG money can pay for. Almost all GCHS-adjacent work sits under 570.202, rehabilitation and preservation.

570.201, basic eligible activities

This is the largest section, running through a long list of paragraphs. The ones worth knowing by letter: (a) acquisition of real property; (b) disposition; (c) public facilities and improvements; (d) clearance, demolition and environmental remediation; (e) public services; (f) interim assistance; (g) payment of the non-Federal share required in connection with a Federal grant program; (h) completion of an urban renewal project; (i) relocation payments and assistance; (j) loss of rental income; (k) housing services and housing counseling; (l) privately owned utilities; (m) construction of certain housing under Section 17 of the United States Housing Act of 1937; (n) direct homeownership assistance; (o) microenterprise assistance; (p) technical assistance for neighborhood revitalization or economic development; (q) assistance to institutions of higher education under defined circumstances.

That list is broad by design. CDBG was written as a flexible block grant, not a narrow categorical program, and 570.201 is where that flexibility shows up most.

570.202, rehabilitation and preservation

This is the section most GCHS work falls under. It covers rehabilitation of residential, public, commercial, and nonprofit-owned property, and manufactured housing. It also covers energy and water efficiency improvements, connection of housing to water and sewer lines, homeowner warranties and insurance, improvements that remove material and architectural barriers restricting the mobility and accessibility of elderly or severely disabled persons (570.202(b)(11), the heart of GCHS's accessibility work), code enforcement in deteriorating areas, historic preservation, renovation of closed buildings for use, lead-based paint activities, and broadband installation. Broadband is not optional in one case: substantial rehabilitation of a building with more than four rental units must include it unless the recipient documents that it is infeasible or an undue burden (570.202(g); 570.482(c)(5) for States, which also covers new construction).

Notice how wide this section's definition of rehabilitation actually reaches. It is not limited to structural repair. Energy efficiency, utility connections, and lead work all sit inside the same eligible activity category as the structural work itself.

570.203, special economic development

This covers acquisition and construction of commercial and industrial buildings, direct assistance to private for-profit businesses, and economic development services connected to those activities. This is the section a partner jurisdiction is more likely to use than GCHS directly, since GCHS's work is rehabilitation and accessibility rather than business assistance.

570.204, activities by community based development organizations

A qualified community-based development organization, a CBDO, can carry out neighborhood revitalization, community economic development, and energy conservation activities under a somewhat different eligibility framework than a standard grantee-run activity. Whether GCHS itself operates as a CBDO on a given grant depends on how that grant is structured, but the category is worth recognizing because it changes what an organization in GCHS's position can be authorized to do.

570.205, planning and capacity building

This covers the plans, studies, analyses, and policy development work that supports a CDBG program without being construction or direct service itself. A needs assessment for a rehabilitation program, or a study of housing conditions in a target area, fits here.

570.206, program administrative costs

This covers the cost of running the CDBG program: general management, oversight and coordination, public information, fair housing activities, and indirect costs charged under an approved cost allocation plan. This is the section that interacts directly with the 20 percent planning and administration spending cap covered in the next lesson. Every dollar spent under 570.206, together with planning costs under 570.205, counts against that cap for an Entitlement grantee. For States, the administrative limits sit at 570.489(a).

Reading the six sections as a set

A useful way to hold these six sections in mind: 570.201 is the general catalog, 570.202 is where GCHS's rehabilitation work actually lives, 570.203 and 570.204 are economic development routes a grantee or CBDO can take, 570.205 is the thinking and planning that supports a program, and 570.206 is the cost of running the program itself. An activity has to fit somewhere in this list before the question of which national objective it meets even comes up. Eligibility and national objective are two separate gates, in that order.

What this means in practice for GCHS

Nearly every GCHS project starts its eligibility analysis at 570.202. The practical habit worth building is to identify the specific paragraph of 570.202 an activity fits under before writing the project description, because 570.202's own list, structural rehab, energy and water efficiency, utility connections, accessibility improvements, code enforcement, lead work, is broad enough that a project can often be documented under more than one paragraph at once. Being specific about which paragraph an activity relies on makes the file easier to defend later, and it also makes clear whether a piece of work, such as broadband in a substantial rehab of a larger rental building, is actually required or covered or needs a separate eligibility basis.

Practice questions

1. Which CFR section covers rehabilitation of residential, public, commercial and nonprofit property, and is the section most GCHS work falls under?

  1. 570.201
  2. 570.202
  3. 570.203
  4. 570.206

2. Besides structural repair, what else does 570.202 cover?

  1. Only cosmetic improvements such as paint and landscaping
  2. Nothing beyond structural repair; other work needs a separate CFR basis
  3. Energy and water efficiency improvements, utility connections, homeowner warranties, code enforcement, historic preservation, and lead-based paint activities
  4. New construction of single family homes only

3. Which section covers acquisition and construction of commercial and industrial buildings and direct assistance to private for-profit businesses?

  1. 570.203, special economic development
  2. 570.204, CBDO activities
  3. 570.205, planning and capacity building
  4. 570.201, basic eligible activities, exclusively

4. What kind of organization can carry out neighborhood revitalization and community economic development activities under 570.204's somewhat different eligibility framework?

  1. Any private for-profit contractor hired by the grantee to carry out rehabilitation work
  2. Only a state agency acting through its own program staff and offices
  3. Any subrecipient regardless of structure, qualification or organizational purpose
  4. A qualified community-based development organization, a CBDO

5. A grantee commissions a housing conditions study to support future CDBG programming, with no construction involved. Which section covers this?

  1. 570.206, program administrative costs
  2. 570.202, rehabilitation and preservation
  3. 570.205, planning and capacity building
  4. 570.201(c), public facilities and improvements

6. What does 570.206 cover, and how does it connect to the planning and administration spending cap?

  1. Public services such as job training, child care and health care, and it is subject to the 15 percent public services cap
  2. Program administration such as management, oversight and fair housing, which counts against the 20 percent cap
  3. Acquisition of real property, with no connection to either spending cap
  4. Rehabilitation activities, capped at 70 percent of the grant

7. Which paragraph of 570.201 covers public services as a basic eligible activity?

  1. 570.201(e)
  2. 570.201(a)
  3. 570.201(k)
  4. 570.201(o)

8. Which paragraph of 570.201 covers microenterprise assistance?

  1. 570.201(c)
  2. 570.201(i)
  3. 570.201(n)
  4. 570.201(o)

9. An activity meets one of the three national objectives under 570.208. Is that alone sufficient for the activity to be funded with CDBG dollars?

  1. Yes, meeting a national objective is the only test that matters once the file documents the objective
  2. No, the activity must also be one of the kinds of activities eligible under 570.201 through 570.206
  3. Yes, as long as the recipient is a nonprofit organization
  4. No, but only for activities exceeding $25,000 in total cost or those paid with program income

10. A grantee funds the substantial rehabilitation of a rental building with 12 units. What does 570.202(g) require about broadband?

  1. The rehabilitation must include broadband infrastructure unless the recipient documents that it is infeasible or an undue burden
  2. Nothing, because broadband is never a CDBG-eligible cost
  3. Broadband is required only if a tenant requests it in writing
  4. Broadband is required only for buildings with fewer than four rental units

11. Which paragraph of 570.201 covers payment of the non-Federal share required in connection with a Federal grant program?

  1. 570.201(d)
  2. 570.201(f)
  3. 570.201(g)
  4. 570.201(m)

12. Why does this lesson recommend identifying the specific paragraph of 570.202 an activity relies on before writing the project description?

  1. Because HUD requires a separate CFR citation form for every project regardless of content
  2. Because 570.202 is the only eligible activity section that applies to nonprofits
  3. Because paragraph citation determines which national objective automatically applies
  4. Because 570.202's list is broad enough that a project can often fit more than one paragraph, and being specific makes the file easier to defend and clarifies whether a particular piece of work is actually covered

13. Which paragraph of 570.201 covers housing services and housing counseling?

  1. 570.201(i)
  2. 570.201(k)
  3. 570.201(n)
  4. 570.201(q)

14. The reading describes 570.201's list as broad "by design." What does it say this reflects about CDBG as a program?

  1. CDBG was written to fund only economic development activities, with housing left to other programs
  2. CDBG activities are limited to those listed in 570.202, with everything else needing a HUD waiver
  3. CDBG was written as a narrow categorical program limited to construction
  4. CDBG was written as a flexible block grant, not a narrow categorical program

Glossary

Eligible activity
An activity described in 24 CFR 570.201 through 570.206, the threshold test an activity must pass before its national objective is even considered.
CBDO
Community-based development organization; a qualified entity that can carry out neighborhood revitalization, community economic development, and energy conservation activities under 570.204's separate eligibility framework.
National objective
The separate requirement, under 570.208, that an eligible activity must also meet before it can be funded with CDBG dollars.
Program administration (570.206)
The cost of running the CDBG program itself: general management, oversight, coordination, public information, fair housing activities, and approved indirect costs.
Rehabilitation and preservation (570.202)
The eligible activity category covering residential, public, commercial and nonprofit property rehab, energy and water efficiency, utility connections, code enforcement, historic preservation, lead-based paint work, and broadband in substantial rehabs of buildings with more than four rental units.
Special economic development (570.203)
The eligible activity category covering acquisition and construction of commercial and industrial buildings and direct assistance to private for-profit businesses.
Microenterprise assistance
Eligible activity under 570.201(o) supporting business assistance at the microenterprise level, one paragraph among many within the basic eligible activities section.
Previous lesson Next lesson