24 CFR 570.207, 570.200(g) and 570.201(e) · 14 practice questions
Content current as of September 22, 2026, per the 2026 TxCDBG Project Implementation Manual (effective September 1, 2026) and the current eCFR.
0:00 / --:--
Reading
Two different kinds of limits sit on top of the eligible activities from
the last lesson. 570.207 lists things CDBG generally cannot pay for at all,
each with a narrow exception carved out. Separately, two spending caps limit
how much of a grant can go toward planning and administration on one hand,
and public services on the other, even when the underlying activities are
fully eligible. As in the last lesson, 570.201 through 570.208 are the Entitlement
citations. TxCDBG runs under Subpart I (570.480 says other subparts do not apply to
the State program unless expressly stated), so the State-side rules are noted where
they differ.
Two independent ceilings, not one combined pool: 20 percent for planning and general administration, 15 percent for public services, each tracked against its own base.
Generally prohibited, 570.207(a)
Three categories are prohibited outright, each with one narrow exception:
Buildings for the general conduct of government.
Exception: removing architectural barriers, and the land portion of an
acquisition that includes an existing building, where the acquisition itself meets a
national objective.
General government expenses. Exception: expenses
specifically authorized elsewhere in the regulations.
Political activities. Exception: incidental use of a
CDBG-assisted facility, as long as all parties have equal access and are assessed
equal charges.
Prohibited unless an exception applies, 570.207(b)
A second, longer list is prohibited by default but opens up under specific
conditions:
Equipment purchase. Exceptions: lease or depreciation of
equipment used in an eligible activity; fire protection equipment;
construction equipment used for solid waste disposal facilities;
equipment and furnishings needed to administer CDBG-assisted activities; and
personal property that is part of a public service.
Operating and maintenance expenses. Exceptions: public
service activities; interim assistance; and office space for CDBG program
staff.
New housing construction. Exceptions: last resort
housing under 24 CFR Part 42; housing construction under Section 17 of the 1937 Act
(570.201(m)); direct homeownership assistance (570.201(n)); and activities carried
out by a CBDO under 570.204(a). Clearance, site work, public improvements and the
pre-construction costs in 570.206(g) that support housing are not treated as
subsidizing new construction.
Income payments. Exception: emergency grant payments,
limited to up to three consecutive months, and paid directly
to the provider of the food, housing or utilities rather than to the person or family
assisted.
The pattern across both lists is the same: a category that would, if left
wide open, let CDBG dollars substitute for ordinary local government
operating budgets or basic income support, closed off by default, with a
narrow and specific door left open for the situations where the exception
genuinely serves a CDBG purpose.
The planning and administration cap, 570.200(g): 20 percent
For origin year 2015 grants and later, no more than 20 percent
of any origin year grant can be expended on planning and administrative
costs (570.205 and 570.206), and expenditures of program income are excluded from
that calculation. Under the program year obligation test, the amount obligated is
limited to 20 percent of that program year's grant plus the program income received
in that year. This is the cap that 570.205 and 570.206 spending count against,
covered in the last lesson.
570.200(g) is the entitlement grantee's citation, sitting in Subpart C.
TxCDBG runs under Subpart I, where the parallel rule is
24 CFR 570.489(a)(3): the combined planning,
management and administrative spending by the State and its funded units of general
local government may not exceed 20 percent of any annual grant
(excluding program income) for origin year 2015 and later. Same percentage, but it
is measured against the State's and the local governments' spending together, not
against one entitlement grantee's own grant alone.
The State's own administration has a separate limit at 570.489(a)(1): it may use
CDBG funds for up to $100,000 plus 50 percent of administrative
expenses above $100,000 (the State pays the other half from its own funds). The
CDBG amount above $100,000, together with State technical assistance costs, is
capped at 3 percent of the annual grant plus 3 percent of program
income and of reallocated funds.
The public services cap, 570.201(e): 15 percent
This cap is more complicated than the planning and administration cap,
because the base it is measured against is not the same for every grantee.
Standard rule: 15 percent of each grant.
Entitlement grants, Hawaii non-entitlement, and insular
areas: 15 percent of the grant plus 15 percent of
program income.
Timing for entitlement grantees: compliance is measured
on funds obligated in each program year, tested against 15
percent of that year's entitlement grant plus 15 percent of the program
income received in the immediately preceding program year.
There is a one-year lag built into the program income half of that
calculation, and it is easy to apply the wrong year's program income figure
if that lag is overlooked.
Grandfathered grantees: a recipient that obligated more than
15 percent of its 1982 or 1983 grant for public services may exceed the cap,
within limits tied to its 1982 or 1983 level (570.201(e)(2)).
New or increased service: a public service is eligible only as a
new service or a quantifiable increase in the level of an existing service above
what the local government funded in the 12 calendar months before the action plan
was submitted.
One activity sits outside this cap entirely. Microenterprise
assistance under 570.201(o) is exempt from the public services cap
(570.201(o)(2); 570.482(c)(2) for States).
A grantee funding microenterprise assistance does not have to count that
spending against the 15 percent limit, which makes it a genuine escape hatch
worth knowing when a public services budget is getting tight.
570.201(e) itself sits in Subpart C and speaks directly to entitlement
grantees. Subpart I, which governs TxCDBG, does not restate the test in
those terms. The limit comes from section 105(a)(8) of the Act, which for
non-entitlement funds distributed by a State is 15 percent statewide, and 570.482(c)(2)
lists services that are outside it. A State may also impose stricter rules on the
local governments it funds (570.480(f)). Treat the base-and-lag rules here as the
entitlement program's, and confirm what applies to a TxCDBG award against the
current TxCDBG Project Implementation Manual.
Why two separate caps, not one
The planning and administration cap and the public services cap answer
different questions. The 20 percent cap limits how much of a grant goes to
running the program itself rather than to activities that serve the
community directly. The 15 percent cap limits how much goes to public
services, which are direct services but not bricks-and-mortar activities like
rehabilitation or public facilities. A grantee tracking only one of the two
caps can still be non-compliant on the other, since they are measured
separately against separate spending categories.
What this means in practice for GCHS
GCHS's rehabilitation work is not public services and is not planning and
administration, so most of GCHS's direct project spending does not count
against either cap. Where these caps become directly relevant is in how a
partner jurisdiction structures its own program year budget, and in how GCHS,
if it ever administers grant funds on behalf of another entity or takes on a
public-service-adjacent activity like housing counseling, tracks that
spending separately from its rehabilitation budget. The microenterprise
exemption is worth remembering specifically because GCHS's broader community
development conversations sometimes touch small business support in the same
breath as housing rehabilitation, and knowing that one of those categories
does not compete with the public services cap for the same 15 percent is a
useful planning fact.
Practice questions
1. Buildings for the general conduct of government are generally prohibited under 570.207(a). What is the exception for removing barriers?
Removing architectural barriers from such a building is an exception, along with the land portion of an acquisition where the acquisition itself meets a national objective
There is no exception; government buildings are prohibited with no exceptions whatsoever
The exception applies only if the building is under 5,000 square feet
The exception applies only to buildings constructed before 1978
Answer: a. The exception for buildings for the general conduct of government covers removing architectural barriers, and the land portion of an acquisition for such a building where the acquisition itself meets a national objective.
2. Political activities are generally prohibited under 570.207(a). What is the narrow exception?
Political activities are permitted if conducted outside normal business hours and paid for with program income
Political activities are permitted if the recipient is a nonprofit organization with tax-exempt status
Incidental use of a CDBG-assisted facility is permitted, as long as access is equal for all parties
There is no exception under any circumstance
Answer: c. The exception for political activities is incidental use of a CDBG-assisted facility, with equal access for all parties.
3. Equipment purchase is generally prohibited under 570.207(b) unless an exception applies. Which of the following is one of the listed exceptions?
Purchase of vehicles for staff personal use
Fire protection equipment
Any equipment costing under $2,000
Equipment for a for-profit business regardless of activity type
Answer: b. Fire protection equipment is one of the listed exceptions to the general prohibition on equipment purchase, along with lease or depreciation for an eligible activity, construction equipment for solid waste facilities, equipment needed to administer CDBG activities, and personal property that is part of a public service.
4. New housing construction is generally prohibited under 570.207(b). Which of the following is one of the listed exceptions?
Construction of single-family homes for sale on the open market by a private for-profit developer
Construction of housing exceeding 8 units, regardless of purpose or who carries it out
Construction funded entirely by program income rather than the grant
Activities carried out by a community-based development organization, a CBDO
Answer: d. New housing construction carried out by a CBDO is one of the exceptions, along with last resort housing under 24 CFR Part 42, Section 17 construction under 570.201(m), direct homeownership assistance under 570.201(n), and the CBDO provision in 570.204(a).
5. Income payments to individuals are generally prohibited under 570.207(b). What is the exception, and how long can it run?
Emergency grant payments of up to three consecutive months, paid to the service provider rather than the recipient of the assistance
Any income payment under $500 per month with no maximum duration
Emergency grant payments of up to twelve consecutive months, paid directly to the individual
Income payments are never permitted under any circumstance
Answer: a. The exception allows emergency grant payments of up to three consecutive months, paid to the service provider rather than directly to the person receiving assistance.
6. Under 570.200(g), what is the maximum share of an origin year 2015 or later grant that can be spent on planning and administrative costs?
15 percent
20 percent
25 percent
10 percent
Answer: b. No more than 20 percent of any origin year 2015 or later grant can be expended on planning (570.205) and administrative (570.206) costs under 570.200(g), excluding program income. For a State and its local governments combined, the same 20 percent appears at 570.489(a)(3).
7. For a standard grantee, what is the public services cap under 570.201(e)?
20 percent of each grant
25 percent of each grant
15 percent of each grant
10 percent of each grant
Answer: c. The standard public services cap under 570.201(e) is 15 percent of each grant.
8. For an entitlement grantee, program income compliance under the 15 percent public services cap is tested against 15 percent of which year's program income?
The program income received during the same program year in which the funds are obligated
An average of the prior three program years' program income, adjusted for inflation
Program income projected for the next program year
The program income received in the immediately preceding program year
Answer: d. For entitlement grantees, compliance is tested against 15 percent of the current program year's entitlement grant plus 15 percent of the program income received in the immediately preceding program year, a one-year lag on the program income half of the calculation.
9. Which eligible activity is specifically exempt from the 15 percent public services cap?
Microenterprise assistance under 570.201(o)
Public facilities under 570.201(c)
Housing services and counseling under 570.201(k)
Program administrative costs under 570.206
Answer: a. Microenterprise assistance under 570.201(o) is exempt from the public services cap, meaning spending on it does not count against the 15 percent limit.
10. What is the fundamental difference in what the 20 percent planning and administration cap and the 15 percent public services cap each measure?
They measure the same spending category under two different names
The 20 percent cap limits the cost of running the program, while the 15 percent cap limits direct public services that are not bricks-and-mortar
The 20 percent cap applies only to non-entitlement grantees and the 15 percent cap applies only to entitlement grantees, each measured on a three-year cycle
The 20 percent cap is measured annually and the 15 percent cap is measured only once per three-year certification period, using a different base each time
Answer: b. The two caps measure different spending categories: planning and administration covers the cost of running the program itself, while public services covers direct services that are not construction or rehabilitation activities. A grantee must track both separately.
11. A grantee wants to buy office equipment for its CDBG program staff. Under 570.207(b), how is this treated?
Prohibited outright with no exception available
Permitted only if the equipment costs less than the federal micro-purchase threshold for a single item
Permitted, since equipment needed to administer CDBG activities is a listed exception
Permitted only if purchased with program income rather than grant funds, and only once per year
Answer: c. Equipment needed to administer CDBG-assisted activities is one of the listed exceptions to the general prohibition on equipment purchase under 570.207(b)(1)(iii).
12. What common purpose do the exceptions across 570.207(a) and 570.207(b) generally serve, according to this lesson?
They exist to give HUD discretion to waive any requirement on a case-by-case basis
They exist so that state grantees are treated identically to entitlement grantees
They exist to allow unlimited spending once a grantee crosses a dollar threshold
They keep a category closed by default, so CDBG dollars do not substitute for ordinary government operating budgets or basic income support, while leaving a narrow door open for situations that genuinely serve a CDBG purpose
Answer: d. The pattern across both prohibited-activity lists is a default closure to prevent CDBG funds from substituting for ordinary local government operations or income support, with a narrow, specific exception left open where the purpose genuinely fits CDBG's aims.
13. General government expenses are generally prohibited under 570.207(a). What is the exception?
Expenses specifically authorized elsewhere in the regulations
Expenses under $1,000 regardless of purpose
Expenses for capital improvements only
No exception exists; general government expenses are prohibited outright with no carve-out
Answer: a. The exception for general government expenses is expenses specifically authorized elsewhere in the regulations.
14. For entitlement grantees, Hawaii non-entitlement grantees, and insular areas, how is the 15 percent public services cap calculated, compared to the standard rule?
20 percent of the grant, with no addition for program income
15 percent of the grant plus 15 percent of program income
10 percent of the grant only, with no program income component
25 percent of the grant plus 10 percent of program income
Answer: b. For entitlement grants, Hawaii non-entitlement grantees, and insular areas, the cap is 15 percent of the grant plus 15 percent of program income, rather than the standard rule of 15 percent of the grant alone.
Glossary
Planning and administration cap
The 20 percent limit under 570.200(g) on how much of an origin year 2015 or later grant may be spent on planning (570.205) and administrative (570.206) costs; for States and their local governments combined, 570.489(a)(3).
Public services cap
The 15 percent limit under 570.201(e) on public services spending, measured against a different base depending on grantee type.
Program income
Income a grantee receives connected to CDBG-funded activities, which factors into how the public services cap is calculated for entitlement, Hawaii non-entitlement, and insular area grantees.
Grandfathered grantee
A recipient that obligated more than 15 percent of its 1982 or 1983 grant on public services and may exceed the current cap within limits tied to that history (570.201(e)(2)).
570.207(a)
The category of activities generally prohibited outright, each with one narrow exception: government buildings, general government expenses, and political activities.
570.207(b)
The category of activities prohibited by default unless a specific exception applies: equipment purchase, operating and maintenance expenses, new housing construction, and income payments.
Obligated funds
Funds committed by a grantee in a program year, the measure used to test compliance with the public services cap timing rule for entitlement grantees.