Lesson 10: Labor standards: Davis-Bacon and the rest
Davis-Bacon and related Acts · 14 practice questions
Content current as of September 22, 2026, per the 2026 TxCDBG Project Implementation Manual (effective September 1, 2026) and the current eCFR.
0:00 / --:--
Reading
CDBG construction work does not run under one labor law. It runs under a
stack of them, sometimes called the Davis-Bacon and related Acts, and each
one covers a different piece of what happens to the people doing the work.
Getting the stack right matters for a grantee like GCHS because the
single-family rehab work this organization does sits right on top of one of
the biggest exemptions in the whole framework, and knowing exactly where
that exemption ends is the difference between a routine job and a wage
violation nobody caught in time.
The unit count decides everything: under eight units, residential rehabilitation is exempt from Davis-Bacon. At eight or more, Davis-Bacon and Copeland apply, and CWHSSA layers on top above $100,000.
The Davis-Bacon Act
Section 110 of the Housing and Community Development Act (42 U.S.C. 5310)
applies Davis-Bacon to construction work financed with CDBG, and the
Davis-Bacon Act's own threshold puts the trigger at contracts over
$2,000. Once triggered, workers on the job have to be paid no
less than the prevailing wage for similar work in the area. The idea behind
the rule is straightforward: federal construction dollars should not be used
to undercut the going local wage for a trade, so the wage decision has to be
obtained and built into the bid and contract documents before work starts,
not added after the fact.
The residential rehabilitation exemption
Davis-Bacon does not apply to rehabilitation of
residential structures with fewer than eight units (section
110 reaches residential rehabilitation only when the property has eight or
more units), and it
does not apply to force-account labor, meaning construction carried out by
the grantee's own employees rather than a contractor. This exemption is the
reason most GCHS single-family rehab work falls outside Davis-Bacon
entirely. A single home, or a small multi-unit residential rehab under the
eight-unit line, is exempt regardless of the dollar amount of the contract.
That is worth sitting with, because it means the trigger for most GCHS
projects is not the $2,000 threshold at all. It is the unit count. A
project can be well over $2,000 in construction cost and still owe no
prevailing wage, as long as it stays residential and stays under eight
units. The moment a project crosses into eight units or more, or stops being
residential rehab, that exemption is gone and the standard Davis-Bacon
trigger applies again.
Contract Work Hours and Safety Standards Act
This one applies to contracts over $100,000 that involve
laborers or mechanics. It requires time-and-a-half pay for hours worked over
40 in a week, and it carries its own penalty: currently $33 per day
per worker in liquidated damages for violations (29 CFR 5.5(b)(2);
the statute's base figure is $10, and the Department of Labor adjusts it for
inflation, so check the current amount). It runs alongside Davis-Bacon rather than replacing it, so a
large enough contract can be subject to both the prevailing wage requirement
and the overtime requirement at the same time.
Copeland Anti-Kickback Act
Copeland is about how workers actually get paid, not just how much.
It requires weekly payment of workers, limits payroll deductions to those
specifically allowed, and requires weekly certified payrolls, each accompanied by a signed Statement
of Compliance (Form WH-347 is an optional format, 29 CFR 5.5(a)(3)). Those
payroll rules are carried in the Davis-Bacon contract clauses, so they come with
Davis-Bacon coverage. The name comes
from what the Act is designed to stop: a contractor quoting the prevailing
wage on paper and then clawing part of it back from workers off the books.
Weekly certified payrolls are the paper trail that makes that harder to get
away with.
What the grantee actually has to do
Labor standards compliance is not something a grantee can hand entirely
to the contractor and forget about. The grantee's duties include:
Obtaining the wage decision and putting it in the bid and contract
documents
Including the labor standards clauses, form HUD-4010,
in every construction contract
Reviewing certified payrolls as they come in, not just filing them
Conducting on-site worker interviews
Investigating discrepancies and enforcing restitution (HUD guidance has
allowed the prime contractor 30 days to correct underpayments;
check the current TxCDBG manual for the state's timeline)
Reporting labor standards enforcement semi-annually on Form HUD-4710, which
HUD uses for its own report to the Department of Labor
Each of these exists to catch a different kind of problem. The wage
decision and HUD-4010 clauses set the rule before work starts. Certified
payroll review and worker interviews catch it if the rule is not being
followed. The restitution duty means a discrepancy cannot just
sit open once it is found, and the semi-annual enforcement report is what keeps the grantee's own compliance visible above the level of
a single project file.
Section 3
Section 3 comes from the Housing and Urban Development Act of 1968, and
it runs alongside the wage and hour rules rather than being part of them.
Where Davis-Bacon, Contract Work Hours and Copeland are about how a worker
is paid, Section 3 is about who gets the work and the contract in the first
place. It requires training and employment opportunities for lower-income
area residents, and contracting opportunities for businesses that benefit
low- and very low-income persons. Under 24 CFR Part 75 it applies to housing
rehabilitation, housing construction, and public construction projects when
the total assistance to the project exceeds $300,000 ($150,000 for lead hazard
control and healthy homes grants), the thresholds HUD set by notice effective
March 16, 2026 (the CFR text still shows the older $200,000 and $100,000).
What this means in practice for GCHS
For a small grantee doing single-family housing rehabilitation, the first
question on every project is not "how much does this cost" but "how many
units, and is this residential rehab." If the answer is under eight units
and it is residential rehab, Davis-Bacon itself does not apply, no matter
how large the contract is. That does not mean every labor-related duty disappears:
Section 3 (when total project assistance exceeds $300,000) and any state or
local wage requirement that applies are not tied to the eight-unit line that
Davis-Bacon uses. Copeland's certified payroll rules, by contrast, come with
Davis-Bacon coverage and fall away with it. The
practical habit worth building is to document the exemption determination
in writing on every project file the same way an environmental review
determination gets documented, so that a reviewer six months later can see
exactly why Davis-Bacon was or was not applied, rather than having to
reconstruct the unit count and the rehab classification after the fact.
It is also worth remembering that the unit count that matters is the
count for the structure being rehabbed, not the size of the grantee's
overall program for the year. A grantee running a program that touches
dozens of homes over a contract year is still looking at each individual
structure on its own terms. Ten separate single-family homes rehabbed under
one CDBG contract year are ten separate exempt projects, each under the
eight-unit line, not one combined project whose unit count somehow adds up
past it.
Practice questions
1. What is the dollar threshold above which Davis-Bacon is triggered on CDBG-financed construction work?
$2,000
$100,000
$10,000
$500
Answer: a. Davis-Bacon is triggered on construction work over $2,000 financed with CDBG, per the labor standards rules covered in this lesson.
2. A GCHS project rehabilitates a single owner-occupied home for $45,000 in construction cost. Does Davis-Bacon apply?
Yes, because the $45,000 cost is well over the $2,000 threshold
No, because rehabilitation of a residential structure with fewer than eight units is exempt from Davis-Bacon regardless of the contract amount
Yes, because Davis-Bacon applies to all CDBG-funded construction with no exemptions
No, but only because the contract is under $100,000
Answer: b. Davis-Bacon does not apply to rehabilitation of residential structures with fewer than eight units. That exemption is based on unit count, not contract dollar amount, so a project well over $2,000 in cost can still be exempt if it stays residential and under eight units.
3. What two things does the residential rehabilitation exemption from Davis-Bacon cover?
Rehabilitation of residential structures with fewer than eight units, and any construction contract under $100,000 regardless of who performs the work
Force-account labor only, regardless of the type of structure involved
Rehabilitation of residential structures with fewer than eight units, and force-account labor by the grantee's own employees
New construction of residential structures with fewer than eight units, and any public service activity
Answer: c. The exemption covers rehabilitation of residential structures with fewer than eight units, and it also covers force-account labor, meaning construction done by the grantee's own employees rather than a contractor.
4. A GCHS rehab project reaches nine units in a single structure. What happens to the Davis-Bacon exemption that would apply to a smaller project?
The exemption still applies, because the Act exempts rehabilitation projects regardless of unit count or contract size
The exemption still applies as long as the contract is under $100,000
The exemption no longer applies, but only if the contract also exceeds $2,000
The exemption no longer applies, because it only covers residential structures with fewer than eight units
Answer: d. The residential rehabilitation exemption covers structures with fewer than eight units. At nine units, the project no longer qualifies for the exemption, and the standard Davis-Bacon trigger over $2,000 applies.
5. Which act requires time-and-a-half pay for hours worked over 40 in a week on contracts over $100,000, and what is the liquidated damages penalty for a violation?
The Contract Work Hours and Safety Standards Act, with $33 per day per worker in liquidated damages
The Davis-Bacon Act, with $33 per day per worker in liquidated damages for any underpayment of the wage decision rates
The Copeland Anti-Kickback Act, with weekly payroll submission
Section 3, with semi-annual reporting to the Department of Labor
Answer: a. The Contract Work Hours and Safety Standards Act applies to contracts over $100,000, requires time-and-a-half for overtime over 40 hours a week, and sets liquidated damages, currently $33 per day per worker under 29 CFR 5.5(b)(2), for violations.
6. What does the Copeland Anti-Kickback Act require of how workers on a covered contract are paid?
Monthly payment of workers with unlimited payroll deductions, so long as the contractor keeps its own records
Weekly payment of workers, only specified payroll deductions, and weekly certified payrolls
Payment at the end of the contract with a single certified payroll submitted at closeout
Time-and-a-half pay for any hours over 40 in a week
Answer: b. Copeland requires weekly payment of workers, limits payroll deductions to those specifically allowed, and requires weekly certified payrolls, so wage skimming through off-the-books deductions is harder to hide.
7. A contractor on a Davis-Bacon covered contract submits its weekly certified payroll. What must accompany each certified payroll?
A notarized affidavit from every worker listed on the payroll for that week
A copy of the contractor's most recent income tax return
A Statement of Compliance signed by the contractor or its agent
The environmental review record for the project
Answer: c. Each certified payroll must be accompanied by a signed Statement of Compliance under 29 CFR 5.5(a)(3). Form WH-347 is an optional format for the payroll itself.
8. Which HUD form contains the labor standards clauses that must be included in every construction contract subject to these requirements?
HUD-4010 does not exist; the clauses are incorporated by reference to the CFR only
The Statutory Checklist used for environmental review
The Request for Release of Funds
HUD-4010
Answer: d. Grantee duties include including the labor standards clauses, form HUD-4010, in every construction contract, alongside obtaining the wage decision and putting it in the bid documents.
9. Besides putting the wage decision in the bid documents, what ongoing duties does the grantee have once a covered construction contract is underway?
Only reviewing certified payrolls; worker interviews and enforcement reporting are the contractor's responsibility under the HUD-4010 clauses
Only conducting worker interviews; certified payroll review is optional once the wage decision is issued
Nothing further, since the HUD-4010 clauses make the contractor solely responsible for the rest
Answer: a. The grantee's ongoing duties include reviewing certified payrolls, conducting on-site worker interviews, investigating discrepancies and enforcing restitution, and reporting enforcement semi-annually on Form HUD-4710. These stay with the grantee, not just the contractor.
10. What is Section 3, and how does it differ in purpose from Davis-Bacon?
Section 3 sets the prevailing wage rate, while Davis-Bacon governs who gets hired for the work
Section 3 requires training and employment for lower-income area residents and contracting opportunities for businesses benefiting low- and very low-income persons, while Davis-Bacon sets the prevailing wage a worker must be paid
Section 3 and Davis-Bacon cover the same requirement, just under two different statutes
Section 3 only applies to contracts over $100,000, the same threshold as the Contract Work Hours and Safety Standards Act
Answer: b. Section 3, from the Housing and Urban Development Act of 1968, is about training and employment for lower-income area residents and contracting opportunities for qualifying businesses. Davis-Bacon is about the wage rate paid, a different purpose entirely.
11. A GCHS project involves rehab work performed entirely by the grantee's own maintenance staff rather than an outside contractor, on a residential structure. How does Davis-Bacon treat this?
It is covered the same as any contractor job once the labor cost exceeds $2,000
It is exempt only if the structure has eight or more units
It is exempt as force-account labor, meaning construction carried out by the grantee's own employees
It is covered under the Contract Work Hours and Safety Standards Act instead of Davis-Bacon, since the workers are public employees
Answer: c. Davis-Bacon does not apply to force-account labor, meaning construction by the grantee's own employees, regardless of the dollar amount of work performed.
12. A contractor on a $150,000 CDBG-funded rehab of a 12-unit residential building argues that because it is residential rehab, no labor standards apply at all. Is this correct?
Yes, because all residential rehabilitation is exempt from Davis-Bacon regardless of unit count
No, but only the Contract Work Hours and Safety Standards Act applies; Davis-Bacon itself is still exempt at any unit count for residential rehab
Yes, because the $2,000 threshold only applies to non-residential construction
No, the residential rehabilitation exemption only covers structures with fewer than eight units, so at 12 units Davis-Bacon applies, and the contract is also over $100,000 so the Contract Work Hours and Safety Standards Act applies as well
Answer: d. The residential rehabilitation exemption applies to structures with fewer than eight units. A 12-unit building exceeds that, so Davis-Bacon applies, and because the contract is over $100,000, the Contract Work Hours and Safety Standards Act applies too.
13. GCHS runs a program touching ten separate single-family homes in one CDBG contract year, each rehabbed individually under the eight-unit line. How is the exemption applied?
The ten homes are combined into one project whose total unit count exceeds eight, so Davis-Bacon applies to all ten homes in the program
Each structure is evaluated on its own; ten separate single-family homes are ten separate exempt projects, not one combined project
The exemption applies only to the first home rehabbed in the contract year
Davis-Bacon applies automatically once a program touches more than five homes in a year
Answer: b. The unit count that matters is the count for the structure being rehabbed, not the size of the grantee's overall program for the year. Ten separate single-family homes are ten separate exempt projects, each judged on its own terms.
14. Even when Davis-Bacon itself does not apply because a project is exempt residential rehab, what can still be in play according to this lesson?
Nothing; an exempt project has no labor standards obligations of any kind under federal, state, or local law, whatever the size of the contract
Section 3, when total project assistance exceeds $300,000, and any state or local wage requirement that applies
Only Copeland's weekly certified payroll rules
Only the HUD-4010 labor standards clauses
Answer: b. Labor-related duties do not disappear entirely when Davis-Bacon does not apply: Section 3 (above the $300,000 project threshold) and any state or local wage requirement can still be in play, and neither follows Davis-Bacon's eight-unit line. Copeland's payroll rules ride with Davis-Bacon coverage.
Glossary
Davis-Bacon Act
The law requiring prevailing wages on CDBG-financed construction contracts over $2,000, subject to the residential rehabilitation exemption.
Residential rehabilitation exemption
The exemption from Davis-Bacon for rehabilitation of residential structures with fewer than eight units, and for force-account labor.
Force-account labor
Construction work carried out by a grantee's own employees rather than an outside contractor, exempt from Davis-Bacon regardless of dollar amount.
Contract Work Hours and Safety Standards Act (CWHSSA)
The law requiring time-and-a-half pay for hours over 40 in a week on contracts over $100,000, with liquidated damages, currently $33 per day per worker, for violations.
Copeland Anti-Kickback Act
The law requiring weekly payment of workers, limited payroll deductions, and weekly certified payrolls to prevent wage skimming.
Section 3
A requirement from the Housing and Urban Development Act of 1968 for training, employment, and contracting opportunities for lower-income area residents and qualifying businesses.
HUD-4010
The HUD form containing labor standards clauses required in every covered construction contract.