CDBG Administration

Lesson 11: Procurement and financial management

2 CFR 200.318 to 200.327 · 14 practice questions

Content current as of September 22, 2026, per the 2026 TxCDBG Project Implementation Manual (effective September 1, 2026) and the current eCFR.

0:00 / --:--

Reading

Every contract a CDBG grantee signs, from a small purchase order to a major construction contract, has to follow federal procurement rules at 2 CFR 200.318 through 200.327. These rules exist to make sure federal dollars are spent through a fair, competitive process rather than handed to whoever the grantee happens to know. The rules organize into three tiers of method, tied to dollar thresholds that grantees regularly get wrong, and this lesson is built around exactly where those thresholds actually come from.

Three tiers of procurement method, from micro-purchase to formal competition A ladder of three procurement tiers. Informal methods cover anything at or below the simplified acquisition threshold, split into micro-purchases needing no competitive quotes and small purchases needing quotes from an adequate number of sources. Formal methods, above the simplified acquisition threshold, require sealed bids or competitive proposals. Noncompetitive procurement is allowed only under narrow, specific circumstances regardless of dollar amount. Informal methods At or below the simplified acquisition threshold: micro-purchases (no competitive quotes needed) and small purchases (quotes from several sources) Formal methods Above the threshold: sealed bids (fixed price, multiple bidders) or competitive proposals (stated evaluation factors) Noncompetitive procurement Allowed only under narrow exceptions: single source, public emergency, agency approval in writing, or competition failed
Three procurement tiers, from informal micro-purchases up to formal sealed bids or proposals, with noncompetitive procurement held to narrow, specific exceptions regardless of dollar amount.

Three tiers of procurement method

Informal methods, for anything at or below the simplified acquisition threshold. This tier splits further into micro-purchases, which may be awarded without soliciting competitive quotations at all, as long as the price is considered reasonable based on research, experience, or purchase history, and small purchases, which require quotations from an adequate number of qualified sources even though the process stays informal.

Formal methods, for anything above the simplified acquisition threshold. This can take the form of sealed bids, which need complete specifications, multiple bidders, and a firm fixed price, or competitive proposals, which need public notice, stated evaluation factors, and written technical evaluation procedures. Sealed bids are the preferred method for construction.

Noncompetitive procurement, allowed only under specific circumstances: the amount is at or below the micro-purchase threshold; only one source can actually perform the work; a public emergency will not permit the delay competition would require; the federal agency or pass-through entity approves noncompetitive procurement in writing after a written request; or competition was solicited and found inadequate.

The dollar amounts, and the warning that matters most in this lesson

2 CFR 200.1 does not itself state the dollar thresholds. It points to the Federal Acquisition Regulation, specifically 48 CFR part 2 subpart 2.1, which currently reads:

ThresholdAmount
Micro-purchase, general$15,000
Micro-purchase, construction subject to Davis-Bacon$2,000
Micro-purchase, services subject to Service Contract Labor Standards$2,500
Simplified acquisition$350,000

Two things follow from where these numbers actually live, and both matter more than the numbers themselves. First, these figures move. They are set in the FAR and adjusted for inflation over time, so a course, or a grantee's own procurement manual, that hardcodes them will eventually go stale. Learn the structure, the tiers and what triggers each one, and check the current FAR figure before relying on a specific number in an actual procurement decision.

Second, and this is the point most likely to show up as a monitoring finding, a recipient may set its own lower thresholds, and must establish a simplified acquisition threshold that does not exceed the FAR value, documented in its own written procedures. A recipient can also self-certify a micro-purchase threshold up to $50,000 annually under the conditions in 200.320. What this means in practice is that the number actually governing a specific purchase is the grantee's own written threshold, not the FAR ceiling by default. A grantee that procured something as a micro-purchase because it was under the FAR's $15,000 figure, while its own written procurement policy set a lower threshold, has not followed its own procedures, and that gap between the FAR ceiling and the grantee's own policy is exactly the kind of thing a monitoring finding gets written about.

For TxCDBG projects the number that actually governs is often lower still. The 2025 TxCDBG Project Implementation Manual applies both 2 CFR Part 200 and Texas local government purchasing law, and it sets its own lines: micro-purchases up to $2,000, small purchases from $2,000 to $100,000 with at least three qualified sources, and sealed bids above $100,000 for construction. Under 24 CFR 570.489(g) the State sets these requirements for units of local government, so check the current manual before relying on any of these figures.

One detail worth noticing on its own: the construction micro-purchase threshold of $2,000 is the same dollar figure as the Davis-Bacon trigger covered in an earlier lesson. That is not a coincidence, and it is a useful anchor point. A construction purchase that stays under the micro-purchase threshold is, by the same $2,000 figure, also staying under the point where Davis-Bacon itself would apply.

Financial management under grant administration

Procurement does not stand alone. It sits inside the broader financial management framework at 24 CFR 570.502 (subpart J, the standard HUD rule for entitlement and HUD-administered grants). For State programs such as TxCDBG, 24 CFR 570.480(a) says other subparts of part 570 do not apply unless expressly stated, and 570.489 leaves procurement details to the State's own policies, so TxCDBG recipients follow the TxCDBG manual. Under 570.502, 2 CFR Part 200 applies to CDBG with specific CDBG substitutions: payment procedures under 200.305 are modified for the lump sum drawdown method at 570.513, cost sharing under 200.306 does not apply to CDBG at all, budget revisions under 200.308 do not apply, program income under 200.307 is replaced entirely by the CDBG-specific rules at 570.504, real property under 200.311 is replaced by 570.505, and equipment under 200.313 applies with sale proceeds treated as program income. A grantee's financial management system has to be able to tie every procurement and every expenditure back to a specific activity, a specific eligibility basis, and a specific grant origin year or program income year, the same recordkeeping standard covered under 570.506 in an earlier lesson.

What this means in practice for GCHS

The first practical step for any GCHS procurement under a CDBG-funded rehab contract is to know two numbers, not one: the current FAR threshold for the relevant category, and GCHS's own written procurement threshold, which may be lower. Whichever is lower governs the purchase. The second practical step is to remember that construction work touching the $2,000 micro-purchase line is the same dollar figure that turns on Davis-Bacon, so a procurement decision and a labor standards decision can hinge on the exact same number at the exact same time, and both should be checked together rather than as separate questions asked by different people on different days.

Practice questions

1. What is the informal procurement tier used for?

  1. Any purchase regardless of dollar amount, at the grantee's discretion, provided the vendor is listed on a state contract
  2. Anything at or below the simplified acquisition threshold, split into micro-purchases and small purchases
  3. Only purchases funded entirely by program income
  4. Only purchases made by a subrecipient rather than the recipient directly

2. Under what condition may a micro-purchase be awarded without soliciting competitive quotations at all?

  1. Whenever the recipient prefers a specific vendor
  2. Only with prior written HUD approval for each purchase
  3. Never; competitive quotations are always required regardless of dollar amount or the reasonableness of the price
  4. If the price is considered reasonable based on research, experience, or purchase history

3. What distinguishes sealed bids from competitive proposals within the formal procurement tier?

  1. Sealed bids are used only below the simplified acquisition threshold
  2. Competitive proposals require no public notice at all
  3. Sealed bids need complete specifications, multiple bidders and a firm fixed price, while competitive proposals need public notice, stated evaluation factors, and written technical evaluation procedures
  4. They are two names for the identical process under 2 CFR 200

4. Which of the following is one of the specific circumstances that permits noncompetitive procurement?

  1. A public emergency that will not permit the delay competition would require
  2. The recipient's board prefers a particular vendor that has performed well on earlier projects
  3. The purchase exceeds the simplified acquisition threshold
  4. The vendor offers a discount for repeat business

5. Where are the actual dollar thresholds for micro-purchases and simplified acquisition set, since 2 CFR 200.1 does not state them directly?

  1. In each grantee's own citizen participation plan
  2. The Federal Acquisition Regulation, specifically 48 CFR part 2 subpart 2.1
  3. The TxCDBG Implementation Manual exclusively, superseding any federal figure
  4. 24 CFR 570.502 directly states the dollar figures

6. What is the current micro-purchase threshold specifically for construction work subject to Davis-Bacon?

  1. $15,000
  2. $50,000
  3. $2,000
  4. $350,000

7. Why does this lesson caution that the FAR dollar thresholds should not simply be memorized as fixed numbers?

  1. Because they differ by HUD region
  2. Because they only apply to nonprofit subrecipients, never to units of local government
  3. Because TDA overrides them for all TxCDBG procurement, so the federal figures never matter
  4. Because the FAR sets them and adjusts them for inflation, so a fixed number can go stale

8. A recipient's own written procurement policy sets a micro-purchase threshold lower than the current FAR figure. Which threshold actually governs a specific purchase?

  1. The FAR figure always governs, regardless of the recipient's own policy
  2. The recipient's own written threshold governs, since it must establish a simplified acquisition threshold not exceeding the FAR value, documented in its own procedures
  3. Whichever threshold the vendor prefers
  4. The higher of the two figures always governs

9. Under what condition, and up to what amount, may a recipient self-certify its own micro-purchase threshold above the general FAR figure, per 200.320?

  1. Up to $50,000 annually, under the conditions in 200.320
  2. Up to $100,000 annually, with no additional conditions
  3. Recipients may never set a micro-purchase threshold above the FAR figure under any circumstance
  4. Up to $15,000, matching the general FAR micro-purchase figure exactly

10. Under 24 CFR 570.502, which uniform administrative requirement from 2 CFR Part 200 does not apply to CDBG, with no CDBG-specific rule taking its place?

  1. 200.313, equipment
  2. 200.305, payment
  3. 200.306, cost sharing
  4. 200.311, real property

11. What replaces the standard 2 CFR 200.307 program income provision for CDBG grantees?

  1. 200.313, the equipment provision
  2. There is no replacement; 200.307 applies unmodified to every CDBG grantee and subrecipient
  3. The state's own procurement code exclusively
  4. 24 CFR 570.504, the CDBG-specific program income rule

12. Why does this lesson treat the $2,000 construction micro-purchase threshold as worth remembering alongside the Davis-Bacon trigger, rather than as an unrelated coincidence?

  1. Because Davis-Bacon applies only to purchases above the micro-purchase threshold, with no other connection
  2. Because the two figures are the same dollar amount, so a construction purchase staying under the micro-purchase threshold is, by that same figure, also staying under the point where Davis-Bacon would apply
  3. Because HUD requires both determinations to be made by the same staff member
  4. Because the FAR and 24 CFR 570 use different definitions of construction, making the shared figure meaningless

13. What is the current micro-purchase threshold specifically for services subject to Service Contract Labor Standards?

  1. $2,500
  2. $15,000
  3. $350,000
  4. $2,000

14. Under 24 CFR 570.502, what replaces the standard 2 CFR 200.311 real property provision for CDBG grantees?

  1. 200.313, the equipment provision
  2. There is no replacement; 200.311 applies unmodified
  3. 570.504, the CDBG-specific program income rule
  4. 570.505, the CDBG-specific real property rule

Glossary

Micro-purchase
A purchase at or below the micro-purchase threshold that may be awarded without competitive quotations if the price is considered reasonable based on research, experience, or purchase history.
Small purchase
An informal-tier purchase above the micro-purchase threshold but at or below the simplified acquisition threshold, requiring quotations from an adequate number of qualified sources.
Simplified acquisition threshold
The FAR-set dollar line separating the informal procurement tier from the formal methods required above it; a recipient must set its own threshold at or below this figure.
Sealed bid
A formal procurement method needing complete specifications, multiple bidders, and a firm fixed price.
Competitive proposal
A formal procurement method needing public notice, stated evaluation factors, and written technical evaluation procedures.
Noncompetitive procurement
Procurement without competition, allowed only under narrow circumstances: an amount at or below the micro-purchase threshold, a single available source, a public emergency, written approval from the federal agency or pass-through entity, or competition solicited and found inadequate.
Real property under 570.505
The CDBG-specific rule that replaces 2 CFR 200.311 for real property acquired or improved with CDBG funds.