Lesson 4: Post-award: monitoring, reporting, and drawdowns
Running the grant day to day once the money starts moving · 14 practice questions
0:00 / --:--
Reading
Post-award is where a grants manager spends most working hours, day to
day management of the money and the program once the award is signed.
This course files this territory under NGMA's Program Management domain,
though the payment mechanics also touch Fiscal Management: how funds move
from the federal government to the organization, and how performance
gets reported back. This lesson covers both halves, drawdowns and
performance reporting, since they run on parallel but separate clocks.
Two ways federal money reaches an organization: advance and reimbursement
2 CFR 200.305(b) requires payment methods for recipients and subrecipients
(other than States, which follow separate Treasury-State agreements) to
minimize the time between the transfer of funds and their disbursement.
Advance payment is the expected method: a recipient or subrecipient must
be paid in advance if it maintains, or shows it is willing to maintain,
written procedures that minimize that time and financial management
systems that meet the standards for fund control and accountability. In
other words, an organization should not draw money down and let it sit
unspent in its bank account for long. Advance payments must be limited to
the minimum amounts needed and timed with actual, immediate cash needs,
not padded for convenience. Recipients must be able to submit payment
requests as often as necessary when electronic funds transfers are used,
or at least monthly when they are not.
Reimbursement, and the 30-day payment clock
Reimbursement is preferred when the conditions for advance payment cannot
be met, when the federal agency or pass-through entity sets a specific
condition under 200.208, when the recipient requests it, or when the
award is for construction (or when a significant part of a construction
project is privately financed or federally loaned and the federal award
is a minor portion of it). Under reimbursement, the organization spends
its own funds first and then requests payment back. The federal agency or
pass-through entity must make payment within 30 calendar days after
receiving the payment request, unless it reasonably believes the request
to be improper (missing documentation, math errors, costs that look
unallowable). For an organization managing cash flow carefully,
understanding whether a given award runs on advance or reimbursement
terms is not a technicality, it determines whether the organization needs
its own working capital to float costs while waiting for reimbursement.
The working capital advance, a middle option
When an organization cannot meet the criteria for advance payment, and the
federal agency or pass-through entity has determined that reimbursement
is not feasible because the organization lacks sufficient working
capital, 200.305(b)(4) allows a working capital advance: the payer
advances cash to cover the organization's estimated disbursement needs for
an initial period, generally aligned to its disbursing cycle, and after
that reimburses its actual cash disbursements.
Performance reporting: what has to connect to what
2 CFR 200.329 governs monitoring and reporting program performance, and
its central requirement is that, when reporting program performance, the
recipient or subrecipient must relate financial data and project or
program accomplishments to the performance goals and objectives of the
award, and provide cost information (such as unit costs) when the award's
terms require it. As applicable, a performance report should compare
accomplishments to the objectives of the award for the period, explain why
established goals or objectives were not met, and explain any cost
overruns or higher-than-expected unit costs. Financial reporting alone
(how much was spent) does not satisfy this requirement; the report has to
show what that spending accomplished.
Reporting frequency: the floor and the ceiling
2 CFR 200.329 sets a floor and a ceiling on how often performance reports
can be required: no less often than annually and no more often than
quarterly, except when a specific condition under 200.208 applies. Annual
reports are due no later than 90 calendar days after the reporting
period, and quarterly or semiannual reports no later than 30 calendar
days after it. Financial reports under 200.328 (the SF-425 at the time of
publication) run on the same rhythm and deadlines. The final performance
report is due no later than 120 calendar days after the period of
performance ends for a direct recipient, and 90 calendar days for a
subrecipient reporting to its pass-through entity, the same numbers as
the final financial report, covered again in lesson 8 on closeout. The
agency or pass-through entity may extend a due date with justification
from the recipient or subrecipient.
What a pass-through entity does with subrecipient reports
When GCHS acts as a pass-through entity, passing federal funds on to its
own subrecipients, 200.332(e) requires it to monitor each subrecipient as
necessary to make sure it complies with the requirements and achieves the
goals of the subaward, not just submits paperwork on time. That includes
reviewing its financial and performance reports and making sure it takes
corrective action on significant developments, such as audit findings
and adverse conditions it reports. Under 200.329(f), a pass-through entity
may conduct in-person or virtual site visits as warranted. The waiver in
200.329(g) for a performance report that is not needed to show that the
award's goals are being achieved is written for the federal agency, so
GCHS should ask its own awarding agency rather than skip a required
report on its own.
Significant developments between reports
Between report due dates, 200.329(e) requires a recipient or subrecipient
to notify the federal agency or pass-through entity of a significant
development that could affect the award. That includes good news, such
as reaching milestones sooner or at less cost than expected, and problems,
delays, or adverse conditions that will affect its ability to meet
milestones or objectives. When a development hurts the award, the
notice has to include the plan for corrective action and any help needed
to resolve it.
Payment method and reporting frequency run on separate rules, but both exist to keep the money and the results connected.
Practice questions
1. Under 2 CFR 200.305(b), which payment method applies when an organization maintains written procedures that minimize the time between drawing down funds and disbursing them, and meets the fund-control standards?
Advance payment
Reimbursement only
Working capital advance only
Neither method is preferred; the choice is random
Answer: a. Under 200.305(b)(1), a recipient must be paid in advance when it maintains written procedures that minimize the time between fund transfer and disbursement and financial systems that meet the fund-control standards.
2. Once a proper reimbursement request is submitted, how quickly must the federal agency or pass-through entity make payment?
Immediately, same day
Within 90 calendar days
Within 30 calendar days, unless the agency reasonably believes the request is improper
There is no deadline
Answer: c. 200.305 requires payment within 30 calendar days after receipt of the payment request unless the agency or pass-through entity reasonably believes the request is improper (for example, missing documentation or errors).
3. When is reimbursement, rather than advance payment, the preferred method?
Only for awards under $10,000, where the paperwork for an advance would cost more than the award itself
When advance conditions cannot be met, when the agency sets a specific condition, or for construction
Reimbursement is never preferred
Only for subrecipients, never for direct recipients
Answer: b. Reimbursement is preferred when advance payment criteria are not met, when the agency or pass-through entity sets a specific condition, when the recipient requests it, or for construction awards.
4. What is a working capital advance?
A permanent grant supplement
An indirect cost recovery mechanism
A penalty imposed on a recipient after an audit finding, requiring it to return unspent cash within an initial period set by the agency
Cash advanced for estimated disbursements over an initial period, when reimbursement is not feasible for lack of working capital
Answer: d. A working capital advance covers estimated disbursements for an initial period when the payer has determined that reimbursement is not feasible for lack of working capital; after that, actual cash disbursements are reimbursed.
5. Which section of 2 CFR 200 governs monitoring and reporting program performance?
200.329
200.403
200.112
200.501
Answer: a. 2 CFR 200.329, Monitoring and reporting program performance, sets the requirements covered in this lesson.
6. What must a performance report do, beyond stating how much money was spent?
Nothing more; a total of dollars spent is a complete performance report if an authorized official certifies it is accurate and submits it on time
Relate financial data to accomplishments, compare results to goals, and explain unmet objectives or overruns as applicable
Only list the names of staff who worked on the grant
Include a Single Audit report
Answer: b. 200.329 requires performance reports to connect spending to accomplishments, comparing results to goals and explaining any shortfalls or overruns, not simply reporting a dollar figure.
7. Under 200.329, what is the least frequent a performance report can be required (the floor), and its deadline?
Monthly, within 10 days
Quarterly, within 30 days
Annually, within 90 calendar days of the period end
Once every 5 years
Answer: c. Annual reporting is the floor, due within 90 calendar days of the reporting period's end.
8. Under 200.329, what is the most frequent a performance report can generally be required (the ceiling, absent special conditions)?
Quarterly, within 30 calendar days of the period end
Weekly
Annually only
There is no ceiling; agencies can require daily reports
Answer: a. Quarterly is the general ceiling, due within 30 calendar days of the period end, unless specific conditions under 200.208 allow more frequent reporting.
9. Under 2 CFR 200.332(e), what must a pass-through entity do when monitoring a subrecipient?
Nothing; performance monitoring is solely the subrecipient's own responsibility
Monitor as necessary to ensure compliance and that the subaward's goals are met, including reviewing reports and requiring corrective action
Only review subrecipient performance once, at closeout, by comparing final expenditures to the approved budget and sending the subrecipient a summary letter
Automatically terminate any subrecipient that misses a report deadline
Answer: b. Section 200.332(e) makes the pass-through entity responsible for monitoring a subrecipient's overall performance. It must review financial and performance reports and make sure the subrecipient takes corrective action on significant developments; 200.329(f) also allows site visits as warranted.
10. Under 2 CFR 200.329(g), who may waive a performance report that is not necessary to ensure an award's goals and objectives are being achieved?
The federal agency, when it decides the report is not needed
No one; every required report must always be collected regardless of its usefulness
Only NGMA can grant such a waiver
The subrecipient itself, once it has submitted three reports
Answer: a. Section 200.329(g) says the federal agency may waive any performance report that is not necessary to ensure the goals and objectives of the award are being achieved. It does not give that waiver to a pass-through entity, so GCHS should ask its awarding agency.
11. GCHS draws down CDBG funds and lets them sit in its operating account for six weeks before disbursing them to a subrecipient. Does this align with 200.305's advance payment expectations?
Yes, there is no limit on how long advanced funds can sit before disbursement as long as they are recorded in the general ledger
No, advance payment procedures are supposed to minimize the time between drawdown and disbursement, not let funds sit idle
Yes, as long as the funds are in an interest-bearing account
This is only a problem for construction awards
Answer: b. 200.305(b) requires payment methods and procedures that minimize the time between transfer and disbursement, and advances limited to immediate cash needs; letting drawn funds sit for weeks runs against that.
12. Why does understanding whether an award runs on advance or reimbursement terms matter operationally for an organization like GCHS?
It doesn't matter; the two methods are functionally identical for cash flow and differ only in the name of the form used to request funds
It only matters for construction grants
It determines the CGMS exam domain the award falls under
Reimbursement requires the organization to have working capital to cover costs while waiting to be paid back; advance payment does not
Answer: d. Under reimbursement, the organization spends its own funds before being paid back, so it needs sufficient working capital to float those costs; advance payment avoids that cash-flow burden.
13. What deadlines does a final performance report generally follow, matching the closeout reporting deadlines covered in lesson 8?
120 days after the period of performance ends for a direct recipient, 90 days for a subrecipient
30 days for everyone, no exceptions
One year for everyone, no exceptions
There is no deadline for a final report
Answer: a. Final reporting deadlines mirror the closeout deadlines: 120 days for a direct recipient, 90 days for a subrecipient, after the period of performance ends.
14. A recipient learns midway between report due dates that a permit delay will keep it from meeting a project milestone. What does 200.329(e) require?
Nothing until the next scheduled report is due
Waiting to notify the agency until the delay has lasted a full quarter, then including it in the next performance report
Notifying the federal agency or pass-through entity, with a plan for corrective action and any help needed
Ending the award and returning all funds drawn to date
Answer: c. Section 200.329(e) requires the recipient or subrecipient to notify the federal agency or pass-through entity of significant developments between reporting dates, including delays that hurt its ability to meet milestones, and to include its plan for corrective action and any assistance needed.
Glossary
2 CFR 200.305
The Uniform Guidance section on federal payment methods: advance payment, reimbursement, and working capital advances.
2 CFR 200.328
The Uniform Guidance section on financial reporting: reports no less than annually and no more than quarterly, unless a specific condition applies.
Advance payment
Funds paid before they are spent, limited to the minimum amounts needed and timed with immediate cash needs.
Reimbursement
A payment method where the organization spends its own funds first and is paid back, generally within 30 calendar days of a proper request.
Working capital advance
Cash advanced to cover an organization's estimated disbursements for an initial period when it cannot yet operate on reimbursement.
2 CFR 200.329
The Uniform Guidance section on monitoring and reporting program performance, including reporting frequency floors and ceilings.