Commercial Mechanical 100%

2021 IFGC Chapter 3

Lesson 7: Combustion Air and Appliance Location

IFGC 303, 304, 305 · IMC 701 · 14 practice questions

0:00 / --:--

Reading

A flame is a slow, steady chemical reaction that needs a constant supply of fresh air and a place to send the exhaust. Starve it and the appliance makes carbon monoxide; pull the wrong air through the wrong room and it can spill flue gas into the occupied space. This lesson covers the two questions that come first on any gas-fired installation: where may the appliance sit (2021 IFGC Sections 303 and 305), and how does its air get there (Section 304). IMC Chapter 7 is only a short pointer back to the fuel gas code. Lesson 1 explains why you must confirm which mechanical and fuel gas codes your city has adopted, so check the local edition before you cite any number below.

Equipment room combustion air openings and a sizing example A section through a mechanical room holding a 200,000 Btu/h boiler and a 100,000 Btu/h water heater, 300,000 Btu/h in total. An adjoining space on the left is connected by an upper and a lower indoor opening of 300 square inches each. On the right, an upper and a lower outdoor opening of 75 square inches net free area each start within 12 inches of the ceiling and floor. A panel lists the sizing arithmetic for each method. Equipment room section, total input 300,000 Btu/h Indoor method 2 openings, 300 sq in each top and bottom Adjoining space, no doors on the openings Outdoor method 2 openings, 75 sq in net free area each Boiler 200,000 Water heater 100,000 Outdoor air Outdoor air 12 in max 12 in max Worked example 200,000 + 100,000 = 300,000 Btu/h input Two outdoor openings 300,000 / 4,000 = 75 sq in Metal louver, 75% free: 75 / 0.75 = 100 sq in gross Horizontal ducts 300,000 / 2,000 = 150 sq in One opening, top only 300,000 / 3,000 = 100 sq in Indoor openings 300,000 / 1,000 = 300 sq in Indoor volume needed 300 x 50 = 15,000 cu ft Sizes shown per opening Every opening: 3 in least dimension. Indoor openings not smaller than 100 sq in each. Ducts serve one enclosure, and upper and lower ducts stay separate all the way to the source. Outdoor intake on an exterior wall: lowest edge at least 12 in above finished ground. Sealed-combustion and power-burner appliances follow the manufacturer instead (304.1).
Size every opening from the total input of all appliances in the room, then check the placement: one opening near the top and one near the bottom.

Where appliances may not go (303.3)

Section 303.3 bans fuel-burning appliances from sleeping rooms, bathrooms, toilet rooms, storage closets and surgical rooms, and from any space that opens only into one of them. A small storage closet with a natural-draft water heater is the classic rehab violation. The section then lists narrow ways around the ban. A direct-vent appliance installed to its listing is allowed. A room that opens only into a bedroom or bathroom can hold an appliance if it has no other use, has a solid weather-stripped door with a self-closing device, and takes its combustion air straight from outdoors. Vented room heaters and wall furnaces are allowed in rooms that pass the indoor volume test of Section 304.5, and small wall-mounted unvented heaters are allowed only up to stated inputs (6,000 Btu/h in a bathroom, 10,000 Btu/h in a bedroom).

Other location rules (303.2, 303.4 to 303.7)

Appliances in a hazardous location must be listed and approved for it (303.2), and an appliance a vehicle could hit needs approved protection (303.4). Furnaces and boilers in closets and alcoves must be listed for that installation (303.5), and outdoor appliances must be listed for outdoors or protected from weather (303.6). In a pit, the appliance stays 12 inches from the walls and out of contact with soil, and pits deeper than 12 inches get lined walls (303.7).

Garages and clearance from grade (305.3, 305.4, 305.5, 305.7)

Gasoline vapor is heavier than air and pools near the floor, so the source of ignition must sit at least 18 inches above the floor in hazardous locations and in garages and fuel-dispensing areas (305.3), unless the appliance is listed as flammable vapor ignition resistant. In public and repair garages an appliance also goes at least 8 feet above the floor, and 1 foot above the tallest garage door opening if vehicles can pass beneath it (305.4). In a private garage the height is 6 feet (305.5). Both can be relaxed when the appliance is protected from impact and its ignition source is elevated. An appliance on grade sits on a level slab that extends at least 3 inches above adjoining grade, or is suspended at least 6 inches above it (305.7).

When the manufacturer governs (304.1)

Section 304 sizes air for ordinary natural-draft appliances. Direct-vent appliances, appliances of other than natural-draft design, vented appliances that are not Category I, and appliances with power burners take their air as the manufacturer directs. A modern condensing boiler with a sealed intake pipe is in that group, but every other appliance in the room is still judged on its own. A draft hood or barometric regulator goes in the same room as its appliance (304.3), and makeup air is required where exhaust fans, dryers or kitchen ventilation interfere with an appliance (304.4).

The indoor method (304.5)

The standard method wants 50 cubic feet of room volume for every 1,000 Btu/h of input (304.5.1), added up over all appliances in the space. Rooms joined to the appliance room through openings without doors, and openings sized as below, count toward that volume. A known-infiltration method (304.5.2) is required where the building is tighter than 0.40 air changes per hour, but its equations belong to the design professional. Openings between spaces on the same story come in a pair: each has at least 1 square inch of free area per 1,000 Btu/h of total input and never less than 100 square inches, one starting within 12 inches of the top of the enclosure and one within 12 inches of the bottom, with a least dimension of 3 inches (304.5.3.1). Spaces on different stories count as communicating when permanent openings in doors or floors total at least 2 square inches per 1,000 Btu/h (304.5.3.2).

The outdoor method (304.6)

Openings to outdoors also need a least dimension of 3 inches. The two-permanent-openings method uses one opening starting within 12 inches of the top and one within 12 inches of the bottom. Each opening is 1 square inch per 4,000 Btu/h when it opens straight outdoors or through vertical ducts, and 1 square inch per 2,000 Btu/h when it reaches outdoors through horizontal ducts, because a long horizontal run resists flow (304.6.1). The one-permanent-opening method uses a single opening starting within 12 inches of the top, sized at 1 square inch per 3,000 Btu/h and not less than the total area of all vent connectors in the space. The appliance must also have at least 1 inch of clearance at the sides and back and 6 inches at the front (304.6.2).

Combining indoor and outdoor air (304.7)

When the room is partly big enough, the outdoor openings can shrink. Divide the available volume of all communicating spaces by the required volume to get the ratio of interior spaces. Subtract that ratio from one to get the reduction factor, then multiply the full outdoor opening size from 304.6 by the factor (304.7.3).

Mechanical supply, louvers and ducts (304.9 to 304.11)

Where a fan supplies all the combustion air, it must deliver at least 0.35 cubic feet per minute per 1,000 Btu/h of total input from outdoors, and each appliance is interlocked so the burner cannot run when the fan is off (304.9). Louvers and grilles are sized on net free area. If the maker does not say, assume 25 percent free area for wood louvers and 75 percent for metal louvers and grilles, and use screen mesh no finer than 1/4 inch (304.10). Nonmotorized louvers are fixed open. Motorized louvers must be proven fully open before the burner lights and must shut the burner down if they close (304.10). Ducts are galvanized steel or equal, serve a single enclosure, keep upper and lower ducts apart, and a horizontal upper duct may not slope down toward the source. An exterior intake stays at least 12 inches above finished ground (304.11). Under IMC Section 701.2, dampers in combustion air openings are interlocked with the firing cycle, and manual dampers are not allowed in combustion air ducts.

Worked example. A community center mechanical room holds a 200,000 Btu/h boiler and a 100,000 Btu/h water heater, both natural draft: 300,000 Btu/h in all. Volume test: 300 x 50 = 15,000 cubic feet are required. The room is 12 by 15 feet with a 9 foot ceiling, only 1,620 cubic feet, so it fails on its own. Outdoor, two openings straight to the outside: 300,000 / 4,000 = 75 square inches of net free area each. A metal louver with unknown free area counts as 75 percent, so each louver is 75 / 0.75 = 100 square inches gross, about 10 by 10 inches. With horizontal ducts it is 300,000 / 2,000 = 150 net square inches each, and one top opening needs 300,000 / 3,000 = 100. Combined: the equipment room plus an adjoining storage room total 6,000 cubic feet. The ratio is 6,000 / 15,000 = 0.4, the reduction factor is 1 - 0.4 = 0.6, and each outdoor opening becomes 75 x 0.6 = 45 net square inches. The indoor openings to the storage room are then 300,000 / 1,000 = 300 square inches each, and no smaller than 100.

In the field

A crew rehabbing a community center replaces an old atmospheric boiler with a sealed-combustion condensing boiler, then closes the wall louvers because "the new one pipes its own air." The same room still holds a natural-draft gas water heater that depended on those louvers. Starved of air, the heater can backdraft and spill carbon monoxide. Count every appliance in the room, and ask what else is in it before you sign off a louver removal.

Key numbers
  • Indoor volume: 50 cu ft per 1,000 Btu/h (304.5.1); indoor openings 1 sq in per 1,000 Btu/h, at least 100 sq in (304.5.3.1)
  • Outdoor, two openings: 1 sq in per 4,000 Btu/h direct or vertical duct, per 2,000 Btu/h horizontal duct (304.6.1)
  • Outdoor, one opening: 1 sq in per 3,000 Btu/h (304.6.2)
  • Openings start within 12 in of the top and bottom; least dimension 3 in
  • Free area if unknown: wood 25 percent, metal 75 percent; screens no finer than 1/4 in (304.10)
  • Mechanical supply: 0.35 cfm per 1,000 Btu/h (304.9); garage ignition source at least 18 in above floor (305.3)

Practice questions

1. A Group B office building has a mechanical room with a 90,000 Btu/h natural-draft boiler and a 60,000 Btu/h natural-draft water heater. Using the standard indoor method in IFGC 304.5.1, what room volume is required?

  1. 3,000 cubic feet
  2. 7,500 cubic feet
  3. 15,000 cubic feet
  4. 1,500 cubic feet

2. An equipment room in a Group A-3 community hall holds 240,000 Btu/h of natural-draft appliances. Two permanent openings connect directly to outdoors. What net free area does each opening need under IFGC 304.6.1?

  1. 80 square inches
  2. 120 square inches
  3. 240 square inches
  4. 60 square inches

3. The same 240,000 Btu/h equipment room gets its outdoor air through horizontal ducts. What net free area does each of the two openings need?

  1. 120 square inches
  2. 60 square inches
  3. 80 square inches
  4. 240 square inches

4. A designer proposes a single outdoor combustion air opening near the top of a boiler room in a Group B clinic. The total input is 240,000 Btu/h and the vent connector areas are small. What minimum free area does IFGC 304.6.2 set?

  1. 60 square inches
  2. 120 square inches
  3. 80 square inches
  4. 240 square inches

5. Two small natural-draft appliances totaling 60,000 Btu/h share a room with a Group R-2 laundry on the same story, and the room will get its air from indoors through two openings. What is the minimum free area of each opening?

  1. 30 square inches
  2. 60 square inches
  3. 100 square inches
  4. 120 square inches

6. Each outdoor opening must supply 75 square inches of net free area. The designer picks wood louvers and the maker does not publish the free area. What gross opening area is needed under IFGC 304.10?

  1. 300 square inches
  2. 100 square inches
  3. 75 square inches
  4. 225 square inches

7. An inspector in a Group F-1 shop finds combustion air openings to outdoors in a boiler room. The upper opening starts 30 inches below the ceiling. Under IFGC 304.6.1, this installation:

  1. Passes, because any opening height works if the area is right
  2. Fails, because upper openings are prohibited in boiler rooms
  3. Passes, because the lower opening starts near the floor
  4. Fails, the upper opening must start within 12 inches of the top

8. A contractor sets a natural-draft gas water heater in the toilet room of a Group B clinic. The heater is not direct-vent. Under IFGC 303.3, this location is:

  1. Allowed if the room has 50 cubic feet per 1,000 Btu/h
  2. Prohibited, unless one of the listed exceptions applies
  3. Allowed if the toilet room has an exhaust fan and vent
  4. Allowed if the heater is listed and labeled for gas

9. A gas-fired unit heater in a Group S-1 repair garage has an ignition source, but it is not listed as flammable vapor ignition resistant. Vehicles can pass under it. At a minimum, how high above the floor must an appliance be under IFGC 305.4 unless the impact-protection exception is used?

  1. 8 feet
  2. 6 feet
  3. 18 inches
  4. 4 feet

10. A gas-fired boiler is being placed on an outdoor pad beside a Group A-3 community building. The pad rests on grade. Under IFGC 305.7, the slab must extend at least how far above adjoining grade?

  1. 12 inches
  2. 6 inches
  3. 1 inch
  4. 3 inches

11. A boiler room needs a full-size outdoor opening of 60 square inches each for two openings. The equipment room and an adjoining space total 5,000 cubic feet available, and the required volume is 10,000 cubic feet. Under IFGC 304.7.3, what is each outdoor opening?

  1. 60 square inches
  2. 15 square inches
  3. 30 square inches
  4. 20 square inches

12. A Group B building supplies all the combustion air for a 400,000 Btu/h boiler room by fan from outdoors. Under IFGC 304.9, what is the minimum supply rate?

  1. 100 cfm
  2. 140 cfm
  3. 1,600 cfm
  4. 14 cfm

13. On a rehab of a Group A-3 community hall, the crew replaces a natural-draft boiler with a sealed-combustion condensing boiler and closes the room's louvers. A natural-draft water heater remains in the room. Under IFGC 304.1, the louvers:

  1. Can go, because the new boiler is direct-vent
  2. Can go, because water heaters need no combustion air
  3. Must be replaced with a fan of 0.35 cfm per 1,000 Btu/h
  4. Are still needed for the natural-draft water heater

14. A combustion air supply to a boiler room in a Group I-1 facility uses a motorized louver. Under IFGC 304.10, what must be true before the main burner ignites?

  1. The louver is proven to be fully open
  2. The louver is at least half open
  3. The louver has a manual damper in series
  4. The louver is screened with 1/8 inch mesh

Glossary

Combustion air
Air supplied to an appliance so its fuel burns completely.
Dilution air
Air that mixes with flue gases in a draft hood, cooling and diluting them before they enter the vent.
Net free area
The open area of a louver or grille that air can actually pass through, after subtracting bars, slats and screen.
Direct-vent appliance
An appliance built and installed so all its combustion air comes from outdoors and all flue gases go directly outdoors.
Natural draft
Venting that relies on the buoyancy of hot flue gases rather than a fan.
Makeup air
Outdoor air brought in to replace air removed by exhaust fans, dryers or kitchen hoods.
Draft hood
A device built into or attached to an appliance that admits room air and relieves the flue from wind and pressure changes.
Free area
The open area of an opening that is actually available to air, used in place of the gross size of a louver.