Commercial Plumbing 100%

2021 IPC Chapter 6

Lesson 6: Water Supply and Distribution, Part 1: Service, Pressure, and Sizing

IPC 602 to 606, Tables 604.3 and 604.5 · 14 practice questions

0:00 / --:--

Reading

Chapter 6 of the 2021 IPC answers a simple question: will water reach every fixture at a usable pressure, and will it arrive safely? This lesson follows the water from the street main to the fixture: the service pipe, its separation from the sewer, the flow and pressure each fixture needs, the valve that caps building pressure, and the shutoff valves an inspector expects to find. Lesson 7 continues with hot water circulation and protection of the potable supply. The numbers are model code numbers; Houston enforces the Uniform Plumbing Code, so confirm the adopted code first.

Water service from the street main through the meter and pressure-reducing valve A schematic of a water service. Water leaves the street main through a full-open valve near the curb, passes a meter with a full-open valve on its discharge side, enters the building through another full-open valve, then a strainer and pressure-reducing valve that hold building pressure to 80 psi static or less. A key lists the minimum flow pressures from Table 604.3: 8 psi for most fixtures, 20 psi for tank closets and mixing valves, 25 psi for valve urinals and 35 to 45 psi for flushometer closets. The service pipe is at least 3/4 inch. Street side Design for the lowest main pressure (604.6) Example: main reads 95 psi static Building side 80 psi static maximum after the PRV (604.8) Water service pipe, 3/4 in minimum (603.1) Building wall M PRV To fixtures 1 2 3 4 5 Key to the service (606.1, 604.8) 1 Full-open valve on the service near the curb 2 Meter 3 Full-open valve on the meter outlet 4 Full-open valve at the building entrance 5 Strainer and PRV, removable for repair Fails open on valve failure (604.8.1) Flow pressure at the outlet (Table 604.3) 8 psi: most lavatories, sinks, showers 20 psi: tank closets, mixing-valve tubs, showers 25 psi: valve urinals 35 to 45 psi: flushometer valve closets If the main cannot deliver these: booster system (604.7, 606.5)
Water service from the main to the fixtures: valves along the way, a PRV above 80 psi, and the pressure each fixture needs.

Required supply and the water service (602, 603.1)

Any structure with plumbing fixtures that people occupy or live in must have a potable water supply in the amounts and pressures the chapter sets (602.1). Only potable water may serve fixtures used for drinking, bathing, cooking, or for processing food, medical, or pharmaceutical products, and unless the code says otherwise, potable water serves every fixture (602.2). The water service pipe is sized to deliver the required quantities at the required pressures and may not be smaller than 3/4 inch in diameter (603.1).

Separating service and sewer (603.2)

A water service may share a trench with the building sewer only if the sewer is made of a material listed in Table 702.2. Otherwise the two are kept at least 5 feet apart horizontally, in undisturbed or compacted earth. The 5-foot rule does not apply at a crossing if the service is sleeved to at least 5 feet on each side of the sewer centerline, or if the bottom of the service within 5 feet of the sewer is at least 12 inches above the top of the sewer. A potable service may never run in, under, or above a cesspool, septic tank, drainage field, or seepage pit (603.2.1). Every yard rehab that trenches a new service beside an old sewer lateral of unknown material meets this rule.

Flow rate and pressure at the fixture (604.3)

The distribution system is designed so that, at peak demand, each fixture supply outlet delivers at least the flow rate and flow pressure in Table 604.3 (604.3). The pressure column is what matters at the meter: it is the pressure that must remain at the outlet after friction and elevation are subtracted. Design uses the lowest street pressure the main ever shows (604.6). Where the street cannot deliver the Table 604.3 pressures, a booster system is required (604.7).

Fixture supply outletFlow, gpmPressure, psi
Lavatory, private0.88
Lavatory, public0.48
Shower, ordinary valve2.58
Shower or bathtub with a balanced-pressure or thermostatic valve2.5 or 420
Water closet, tank type or flushometer tank1.6 to 620
Urinal, valve1225
Water closet, flushometer valve (siphonic / blowout)2535 / 45
Key numbers
  • Water service pipe: 3/4 in diameter minimum (603.1)
  • Service to sewer: 5 ft horizontal separation, or a sleeve, or 12 in vertical (603.2)
  • Flow pressure at the fixture: 8 psi for most; 20 psi for tank closets and mixing valves; 25 psi for valve urinals; 35 to 45 psi for flushometer closets (Table 604.3)
  • Pressure-reducing valve: required above 80 psi static, with a strainer (604.8)
  • Fixture supply pipe ends within 30 in of the fixture (604.5)
  • Underground service pipe pressure rating: 160 psi minimum (605.3)
  • Booster pump low-pressure cutoff: at 10 psi or less on the suction side (606.5.5)

Pressure-reducing valves (604.8)

Where pressure in the building exceeds 80 psi static, an approved pressure-reducing valve with a strainer must reduce it to no more than 80 psi static (604.8). Two exceptions exist: service lines to sill cocks and outside hydrants, and main risers, where the pressure is brought to 80 psi or less at the individual fixtures. The valve is designed to stay open if it fails, so a failed valve delivers full main pressure rather than no water (604.8.1). The valve and strainer must be arranged so parts can be repaired or removed without cutting the line or taking the valve out (604.8.2).

Worked example: a restaurant sits on a main that measures 95 psi static. The building distribution exceeds 80 psi, so a valve and strainer are required, set at or below 80 psi static. A flushometer closet needs 35 to 45 psi at the fixture, so with the valve set at 80 psi the design has up to 35 psi to lose to friction and elevation before a blowout flushometer closet drops below its 45 psi. If the main showed only 30 psi at peak, a booster system would be required for flushometer fixtures (604.7).

Booster systems (604.7, 606.5)

Where the main cannot supply the minimum pressures and quantities, the supply is supplemented by an elevated tank, a hydropneumatic system, or a booster pump (606.5.1). Every booster pump needs a low-pressure cutoff that protects the suction side from a vacuum when suction pressure falls to 10 psi or less (606.5.5).

Fixture supply sizes (604.5)

A fixture supply pipe ends no more than 30 inches from its connection to the fixture and extends to the adjacent floor or wall. Table 604.5 gives the minimum sizes. Note how large the flushometer closet supply is.

FixtureMinimum supply pipe
Lavatory, flush-tank water closet, drinking fountain3/8 in
Kitchen sink, bathtub, single shower head, service sink, hose bibb1/2 in
Urinal, flushometer valve3/4 in
Water closet, flushometer valve1 in

Materials, water hammer, and valves (605, 604.9, 606)

At summary level: pipe and fittings in the water supply may contain no more than 8 percent lead, and those supplying drinking or cooking water must meet a weighted average of 0.25 percent or less (605.2). Underground service pipe must be listed for potable use and rated for at least 160 psi (605.3). Piping may not be installed in soil or groundwater contaminated with solvents or fuels, and a chemical analysis is required where that is suspected (605.1). Where quick-closing valves are used, a water hammer arrestor is required (604.9).

Full-open valves belong on the service near the curb, on the discharge side of every meter, at the entrance to the structure (one for each tenant in a multi-tenant building), at the base of most risers, on the water supply to every water heater, and to tanks (606.1). Shutoff valves belong at each fixture supply, each sillcock, and each appliance (606.2). All of these valves need access (606.3), and service and remote valves must be identified (606.4).

In the field

In a three-tenant strip center rehab, the owner asks GCHS to swap out an old meter and tie the new service to the existing risers. Confirm that each tenant has its own shutoff valve where the branch enters the space, that the meter has a valve on its discharge side, and that the PRV and its strainer can be serviced without cutting the line. Ask what the street pressure reads: a static reading over 80 psi at the meter means a PRV is required, and a low reading may mean a flushometer closet will never flush well.

Practice questions

1. A designer for a Group B office shows a 1/2-inch water service pipe from the meter to the building. What is the finding under 2021 IPC Section 603.1?

  1. It is too small: the water service pipe must be at least 3/4 inch
  2. It is acceptable: 1/2 in is the minimum
  3. It is too small: the minimum is 1 in for any commercial building water service
  4. It is acceptable if the meter is 5/8 in

2. A new water service is laid in the same trench as an existing building sewer of a material that is not listed in Table 702.2, at a Group R-2 site. What separation does Section 603.2 require?

  1. At least 12 in horizontally, with the service placed on a bench in the trench wall
  2. At least 3 ft vertically only
  3. At least 5 ft horizontally of undisturbed or compacted earth
  4. No separation is required

3. A water service crosses over a building sewer at a Group B site. The bottom of the service pipe is 14 inches above the top of the sewer within 5 ft of the crossing. Under Section 603.2, the sleeve requirement:

  1. Applies: a sleeve is always required wherever a water service crosses a sewer line
  2. Applies unless the pipe is copper
  3. Does not apply only if the sewer is cast iron
  4. Does not apply: the service bottom is 12 in or more above the sewer top

4. A rural GCHS rehab plans to run a new potable water service across a septic tank drainage field. What does Section 603.2.1 say?

  1. It is allowed if the pipe is sleeved
  2. It is prohibited: potable service pipe may not be in, under or above a drainage field
  3. It is allowed if buried 12 in deep
  4. It is allowed with a backflow preventer at the building and warning tape above the pipe

5. A Group R-2 apartment building has a static pressure of 92 psi at the entrance to the building water distribution piping. What does Section 604.8 require?

  1. A pressure-reducing valve with a strainer, set at or below 80 psi
  2. Nothing, because the limit is 100 psi at the entrance for buildings with risers
  3. A pressure-reducing valve set at 92 psi
  4. A water hammer arrestor on each riser

6. A Group A-3 pool building has a hose bibb line that runs ahead of the pressure-reducing valve at 90 psi static. What does the exception to Section 604.8 say?

  1. Every branch must be reduced to 60 psi, including lines to outside hydrants
  2. Only the water heater branch may skip the valve
  3. Service lines to sill cocks and outside hydrants are excepted
  4. There is no exception in the section

7. What must a pressure-reducing valve do if it fails, according to Section 604.8.1?

  1. Close fully to protect the fixtures and stop water from reaching them
  2. Vent to the drain
  3. Reduce flow to 50 percent
  4. Remain open to allow uninterrupted water flow

8. A design calculation for a Group A-3 community hall shows 30 psi left at a siphonic flushometer valve water closet at peak demand. What does Table 604.3 conclude?

  1. It is enough: 30 psi is the minimum for any flushometer
  2. It is short: the outlet needs 35 psi, so add a booster or larger piping
  3. It is too high: the maximum for a siphonic flushometer valve is 25 psi at peak flow
  4. It is enough: flushometer closets need only 8 psi

9. On the top floor of a Group R-2 building, a design shows 15 psi remaining at close-coupled tank water closets at peak demand. What is the finding?

  1. It is short: tank-type closets need 20 psi at the outlet
  2. It is enough: 15 psi is the minimum for tank closets
  3. It is enough: tank closets need 8 psi
  4. It is short: tank closets need 35 psi at the outlet, as flushometer closets do

10. A Group B high-rise design needs a water pressure booster pump. What low-pressure protection does Section 606.5.5 require on the pump?

  1. A pressure gauge only
  2. A check valve at the discharge
  3. A low-pressure cutoff to prevent a vacuum when suction pressure is 10 psi or less
  4. A relief valve set at 150 psi and a high-pressure cutoff set at 125 psi at the pump

11. A Group A-4 locker room uses flushometer-valve water closets. What is the smallest fixture supply pipe permitted by Table 604.5?

  1. 3/8 inch
  2. 1/2 inch
  3. 3/4 inch
  4. 1 inch

12. An inspector finds a lavatory supply stub-out that ends 40 inches from the lavatory, with flexible connectors made up at the fixture. Under Section 604.5, the supply pipe:

  1. May end up to 6 ft away
  2. Must end not more than 30 in from the point of connection to the fixture
  3. May end up to 60 in from the fixture where flexible connectors are used at the stop
  4. Must end 12 in or less from the floor

13. A three-tenant Group M strip center has a common water supply system. What does Section 606.1 require at each tenant space?

  1. A pressure-reducing valve for each tenant
  2. A backflow preventer for each tenant
  3. A main shutoff valve for each tenant
  4. A separate meter for each tenant

14. A contractor in a Group R-2 building is laying new underground water service pipe outside the structure. What minimum working pressure rating does Section 605.3 require at 73.4 degrees F?

  1. 160 psi
  2. 80 psi
  3. 100 psi
  4. 250 psi

Glossary

Static pressure
Water pressure with no flow; the pressure-reducing valve rule caps it at 80 psi in building piping.
Flow pressure
The pressure at a fixture outlet while water is flowing; Table 604.3 sets the minimum for each fixture.
Water service pipe
The pipe from the public main or other source to the building, at least 3/4 in in diameter.
Pressure-reducing valve
A valve with a strainer that holds building pressure at or below 80 psi static and fails open.
Full-open valve
A valve, such as a gate or ball valve, that leaves the pipe unobstructed when open; required at the curb, meter outlet, and entrance.
Booster system
A pump, tank, or hydropneumatic system that raises pressure where the main cannot meet the Table 604.3 values.
Fixture supply
The short pipe from the distribution piping to a fixture, ending within 30 in of the fixture connection.
Flushometer valve
A pressure-operated valve that flushes a closet or urinal; it needs high flow pressure and a large supply pipe.