Lesson 7: Water Supply, Part 2: Hot Water and Backflow Protection

IPC 607, 608, 609, 610 · 14 practice questions

0:00 / --:--

Reading

Chapter 6 finishes with two jobs. Section 607 sets the rules for hot water: where it is required, how far it may travel, and how expansion is handled. Section 608 protects the drinking water from anything that could flow backward into it: which device fits which hazard, how high a vacuum breaker sits, and where only an air gap will do. Houston enforces the Uniform Plumbing Code (Lesson 1), so treat these numbers as the 2021 IPC and check the adopted code before you write a correction on a real permit.

Backflow device selection by hazard and backpressure, with an air gap sketch A four-cell chart matching backflow devices to hazard level and to backsiphonage or backpressure, with vacuum breaker critical level heights below it, and a faucet spout above a basin showing the air gap measured from the lowest end of the outlet to the flood level rim, with minimum gaps from Table 608.16.1. Which device? (Table 608.1) Hazard Backsiphonage only Backsiphonage or backpressure Low hazard (pollution) Atmospheric, pressure or spill-resistant vacuum breaker, barometric loop, or any device at right Double check assembly Dual check (to 1 in) Vented device (to 3/4 in) RP assembly or air gap High hazard (contamination) Atmospheric, pressure or spill-resistant vacuum breaker, barometric loop, or any device at right Reduced pressure (RP) assembly or air gap Double check is not allowed here Air gap and RP assembly are accepted in all four cells. Double check: low hazard only, siphon or backpressure. Low head backpressure means 4.33 psi or less (10 ft of water). Critical level above the flood level rim Atmospheric or pressure-type breaker at an outlet: 6 in Pressure or spill-resistant assembly: 12 in above all downstream piping and outlets Faucet with integral breaker: 1 in, per its listing Hose bibb: breaker on the hose connection Air gap (608.14.1) Potable supply Lowest end of the outlet Flood level rim Air gap Minimum gap, away from a wall Lavatory (1/2 in opening): 1 in Sink (3/4 in opening): 1 1/2 in Bath filler (1 in opening): 2 in Over 1 in: 2 x opening diameter Close to a wall 1 1/2, 2 1/2 and 3 in, or 3 x diameter (wall within 3 diameters of the spout)
Pick the device from two questions: how bad is the hazard, and can backpressure happen? Then check its installed height or air gap.

Where hot water is required (607.1)

In residential occupancies, hot water must reach fixtures for bathing, washing, cooking, cleaning, laundry and maintenance. In nonresidential occupancies, hot water is required for the culinary, cleansing, laundry and maintenance uses, but fixtures for bathing and washing may be served with hot or tempered water. That is why many small commercial restrooms have one tempered supply to the lavatories.

Tempered water and temperature control (607.1.1, 607.1.2)

Tempered water is controlled by one of four means: a limiting device to ASSE 1070 set to not more than 110°F, a thermostatic mixing valve to ASSE 1017, or a water heater listed to ASSE 1082 or ASSE 1084. A heater thermostat alone counts as the limiting means only if the heater meets ASSE 1082 or ASSE 1085 (607.1.1).

Distance, circulation, and thermal expansion (607.2, 607.3)

The developed length of hot or tempered piping from the source to the fixtures that need it may not exceed 50 feet. A recirculation loop or heat trace counts as a source. A demand recirculation pump starts on a user signal, presence, or flow, and must keep the water entering the cold pipe to no more than 104°F (607.2.1.2); the rest of circulation design goes to the energy code.

Thermal expansion is the quiet problem. When a storage water heater is fed through a check valve, pressure reducing valve or backflow preventer, heated water has nowhere to go. An expansion control device goes on the heater cold supply, downstream of all of them (607.3). Adding a backflow assembly to an old service can create this problem overnight.

Cross connections and the two kinds of backflow (608.1, 608.7)

A cross connection is any link between potable piping and a system holding water of doubtful quality, steam, gas or chemicals, where flow can go either way. Section 608.7 prohibits them unless an approved device or method protects the supply. Backsiphonage happens when supply pressure falls below atmospheric, for example in a main break, and draws water backward. Backpressure happens when downstream pressure from a boiler, pump or elevated tank exceeds supply pressure; 4.33 psi or less (a 10-foot column of water) is called low head. Hazard is graded too: pollution only spoils taste or appearance (low hazard), while contamination is an actual health hazard such as sewage (high hazard).

Choosing a device (Table 608.1)

DeviceHazardProtects againstField note
Air gapHigh or lowBothNo moving parts
Reduced pressure (RP) assemblyHigh or lowBothRelief port discharges through an air gap
Double check assemblyLow onlyBothNever on a high hazard
Pressure vacuum breakerHigh or lowBacksiphonage onlyNot where spillage can damage the building
Atmospheric-type vacuum breakerHigh or lowBacksiphonage onlyOperates at atmospheric pressure; no valve downstream
Dual checkLow onlyBothSmall sizes, up to 1 in

Ask two questions: is the hazard high, and can backpressure happen? A vacuum breaker only answers backsiphonage. A double check never protects a high hazard. An RP assembly or air gap is accepted in every case.

Air gaps and vacuum breaker heights (608.14, 608.16)

An air gap is measured straight up from the lowest end of the potable outlet to the flood level rim. Table 608.16.1 sets it by the effective opening: a lavatory (1/2 inch or less) needs 1 inch away from a wall and 1 1/2 close to one, a sink (3/4 inch) 1 1/2 and 2 1/2, an over-rim bath filler (1 inch) 2 and 3. Above 1 inch the gap is two times the diameter, or three times close to a wall. An outlet is close to a wall when one wall stands within three diameters of the spout, or within four where two walls meet. Outlets with hose threads may not use an air gap (608.16.1).

Vacuum breakers are protected by height, shown in the figure. Every hose bibb, sillcock and wall hydrant needs a breaker, except water heater and boiler drain valves and clothes washer valves protected another way (608.16.4.2).

Worked example. A mop basin in a corner is filled by a spout with a 1 1/2 inch effective opening. Over 1 inch, so the gap is a multiple of the diameter. Away from walls: 2 x 1.5 = 3 inches. Two walls count as close within 4 x 1.5 = 6 inches of the spout, so use the close figure: 3 x 1.5 = 4.5 inches. A 3 inch gap fails; 4.5 inches passes.

Specific connections (608.17)

  • Sprinklers and standpipes: a double check assembly or an RP fire protection assembly. Antifreeze, additives or a nonpotable second source under continuous pressure need an RP assembly.
  • Boilers: a backflow preventer with an intermediate atmospheric vent; with treatment chemicals, an air gap or RP assembly.
  • Lawn irrigation: an atmospheric or pressure vacuum breaker, or an RP assembly; chemical injection needs an RP assembly.
  • Beverage machines: carbonated dispensers use an ASSE 1022 device or an air gap; coffee machines may also use ASSE 1024.
  • High-hazard backpressure from a nonpotable line or tank: an RP assembly.

Relief port piping ends at an approved indirect waste receptor or outdoors, sized for the maximum published discharge (608.15.2.1). No potable outlet or stop-and-waste valve may be installed below grade (608.8).

In the field

A church hall rehab adds a coffee station, a mop sink with a threaded faucet, and a hose bibb at the loading door, and the boiler gets a chemical feed. Four answers from one walk-through: a listed device or air gap at the coffee machine, a vacuum breaker at the threaded mop faucet (no air gap on hose threads), a breaker on the hose bibb, and an air gap or RP assembly at the boiler feed.

Health care, disinfection, and sizing pointers (609, 610)

Section 609 adds rules for Group I-1, I-2, ambulatory care, medical offices and laboratories, including two water services for a Group I-2, Condition 2 facility. Section 610 requires a new potable system to be flushed and disinfected by the method the health authority or water purveyor prescribes. The code's own method is 50 ppm chlorine held 24 hours, or 200 ppm held 3 hours, then flushed and repeated if a bacteriological test still shows contamination. The model code also carries an optional pipe sizing appendix, but appendices apply only where specifically adopted (101.2).

Key numbers
  • Hot or tempered piping: 50 ft developed length from the source (607.2)
  • Tempered limiting device: not more than 110°F (607.1.2)
  • Vacuum breaker: 6 in above the flood level rim; pressure and spill-resistant assemblies 12 in above downstream piping (608.14.5, 608.16.4)
  • Air gap, away from a wall: lavatory 1 in, sink 1 1/2 in, bath filler 2 in (Table 608.16.1)
  • Disinfection: 50 ppm for 24 hours or 200 ppm for 3 hours (610.1)

Practice questions

1. A small Group B office has public lavatories only. Under Section 607.1, what must the nonresidential building supply to those lavatories?

  1. Cold water only
  2. Hot water at not less than 140 degrees F
  3. Hot or tempered water
  4. Hot water through a recirculation loop only

2. Tempered water is controlled with a limiting device conforming to ASSE 1070. What is the highest temperature setting Section 607.1.2 allows for that device?

  1. 100 degrees F
  2. 110 degrees F
  3. 120 degrees F
  4. 140 degrees F

3. An inspector measures 90 feet of developed piping from the water heater to the farthest lavatory in a long clinic corridor. There is no recirculation loop or heat trace. What does Section 607.2 say?

  1. It is acceptable because the limit is 100 feet of developed length for clinics
  2. It is acceptable because lavatories are exempt
  3. It is a violation only if the pipe is uninsulated
  4. It is a violation because the limit is 50 feet of developed length

4. A storage water heater in a small commercial building is fed through a pressure reducing valve and a backflow preventer. Where does Section 607.3 place the thermal expansion control device?

  1. On the hot outlet at the farthest fixture
  2. On the heater cold supply, downstream of the check valve, reducing valve and backflow preventer
  3. Upstream of the pressure reducing valve, at the point where the water service enters the building
  4. On the relief valve discharge pipe

5. Which description matches backsiphonage?

  1. Supply pressure drops below atmospheric and pulls water backward
  2. Downstream pressure rises above the supply pressure and pushes water backward
  3. Heated water expands in a closed system
  4. A pump adds pressure to the fire main

6. Under the Chapter 2 definition, low head backpressure is a pressure of:

  1. Up to 1.5 psi
  2. Up to 10 psi
  3. More than 4.33 psi, the pressure of a 20 foot column of water
  4. 4.33 psi or less, a 10 foot column of water

7. A contractor proposes a double check assembly to protect the potable connection to a boiler whose feed water receives conditioning chemicals. What does Section 608.17.2 require?

  1. Nothing more, because a boiler is a low hazard
  2. A double check assembly at least 12 inches above the boiler, with a strainer upstream
  3. A pressure vacuum breaker with a 6 inch critical level
  4. An air gap or a reduced pressure principle backflow preventer

8. Which device protects against backsiphonage only?

  1. Pressure vacuum breaker assembly
  2. Reduced pressure principle assembly
  3. Double check assembly
  4. Air gap

9. A community garden irrigation system draws liquid fertilizer into the irrigation piping through an injector. Which protection does Section 608.17.5 require at the potable connection?

  1. An atmospheric vacuum breaker
  2. A reduced pressure principle backflow prevention assembly
  3. A double check assembly with a shutoff valve on each side of the assembly
  4. A dual check valve

10. Under Table 608.16.1, what is the minimum air gap for a lavatory faucet with an effective opening of 1/2 inch, located away from a wall?

  1. 1 inch
  2. 1 1/2 inches
  3. 2 inches
  4. 3 inches

11. A hose-fill spout has an effective opening of 2 inches and is well away from any wall. What is the minimum air gap under Table 608.16.1?

  1. 2 inches
  2. 3 inches
  3. 6 inches
  4. 4 inches

12. An inspector finds a pressure vacuum breaker on a landscape irrigation line with its critical level only 6 inches above the highest sprinkler head. What is the finding?

  1. Compliant, because 6 inches is the standard height
  2. Compliant if the assembly is painted
  3. Noncompliant, because the critical level must be at least 12 inches above all downstream outlets
  4. Noncompliant, because the assembly must be installed at least 36 inches above the highest sprinkler head

13. A mop sink in a janitor closet has a faucet with hose threads on the spout. A plumber proposes protecting it with a 1 inch air gap. What is the correct response?

  1. Accept it, since a mop sink is a low hazard
  2. Reject it: hose-threaded outlets may not use an air gap; they need a listed vacuum breaker
  3. Accept it if the gap is measured from the flood level rim and is at least 1 inch above it, as for any fixed outlet
  4. Reject it: only an RP assembly is allowed

14. A plumber fills a new water system in a small clinic with a 50 ppm chlorine solution. Under Section 610.1, how long must the solution stand before the system is flushed?

  1. 3 hours
  2. 8 hours
  3. 24 hours
  4. 72 hours

Glossary

Cross connection
Any physical link between a potable water pipe and another system or water of doubtful quality, where flow can go either way depending on pressure.
Backsiphonage
Backflow caused by supply pressure falling below atmospheric pressure, drawing water backward into the potable system.
Backpressure
Downstream pressure higher than the supply pressure, pushing water back into the supply. Low head backpressure is 4.33 psi or less.
Air gap
The unobstructed vertical distance through free air from the lowest end of a potable outlet to the flood level rim of the receptacle.
Flood level rim
The edge of a receptacle over which water would overflow; the reference line for air gaps and vacuum breaker heights.
Critical level
The height reference point below which backflow could occur; the bottom of the device if it is not marked.
Tempered water
Water mixed to a limited temperature, controlled at not more than 110 degrees F by a limiting device, mixing valve or listed water heater.
Developed length
The length of a pipe measured along its centerline, including fittings, rather than in a straight line.