Residential Building 100%

Practice exam

Residential Building Practice Exam

60 questions · 120 minutes · aim for 70 percent · drawn fresh every sitting

This practice exam draws 60 questions from a 405-question bank covering all fifteen lessons, with each of the seven topic areas represented in proportion to its share of the bank: code administration, building planning, footings and foundations, floor construction, wall construction and coverings, roof and ceiling construction, and public safety and special construction. Question order and answer order are shuffled every time you sit it.

This is GCHS practice, not an official test. It checks what you have retained from the lessons, based on the 2021 IRC. Treat it as open book if you like: in the field you will have the adopted code and its local amendments in hand, and knowing where to look matters as much as memorized numbers.

Rules

Back to Lesson 15 Course hub