Lesson 15: Review and Practice Exam

Course review · 20 practice questions

0:00 / --:--

Reading

Fourteen lessons have covered the 2021 IRC provisions GCHS uses most on rehab and infill work, from the permit that starts a job to the smoke alarm that protects the people living in the finished house. This lesson does not introduce anything new. It walks back through the numbers that come up most often in the field, grouped the way an inspection actually moves through a house, so the practice questions that follow can pull from any of the fourteen lessons instead of just the last one. As always, local adoption governs, so treat every figure below as a starting point to confirm against the code edition your jurisdiction has adopted.

Administration, planning, and the site

A GCHS project starts with the administrative machinery from Lesson 1: a permit under R105.1, work exempt from that permit under R105.2, and the sequence of required inspections under R109 that decides when concrete, framing, and rough-in trades can be covered up. A permit becomes invalid if work is not commenced within 180 days of issuance, or if more than 180 days pass between inspections once work has started (R105.5). Lesson 2 then covers fire separation distance, measured perpendicular from a wall face to the lot line, which drives exterior wall rating and opening limits under Table R302.1(1), plus the duplex and townhouse separation requirements and the gypsum board assembly between an attached garage and the dwelling. Lesson 3 rounds out planning with the minimums that decide whether a space can be called a bedroom at all: floor area, ceiling height, light, ventilation, heating, and sanitation.

Key numbers: administration and planning
  • Permit expiration: work not started within 180 days of issuance, or more than 180 days between inspections (R105.5)
  • Required inspections in sequence: foundation, floodplain elevation where applicable, rough-in (plumbing, mechanical, gas, electrical), frame, final (R109)
  • Fire separation distance under 3 ft: 1-hour rated wall, no openings; 3 to under 5 ft: 1-hour rated, openings capped at 25% of wall area (Table R302.1(1))
  • Garage-to-dwelling wall: 1/2-inch gypsum board on the garage side; ceiling under habitable space: 5/8-inch Type X (R302.6)
  • Habitable room: 70 sq ft minimum, 7 ft minimum in any direction; ceiling height 7 ft (bath/laundry 6 ft 8 in.) (R304, R305)
  • Glazing 8% of floor area, openable area 4%, with exceptions for mechanical ventilation and artificial light (R303.1)

Foundations and moisture control

Lesson 4 sized footings from the soil beneath them: presumptive bearing values running from 1,500 psf for clay up to 12,000 psf for crystalline bedrock (Table R401.4.1), a 12-inch minimum footing depth below undisturbed grade or the local frost line, and the anchor bolts that tie the sill plate down. Lesson 5 picked up where the footing leaves off, at the foundation wall standing on it: how far the wall must clear finished grade, the drainage and dampproofing that keep soil moisture out, and the vent ratios that keep a crawl space dry from the inside.

Key numbers: foundations
  • Presumptive bearing values: clay 1,500 psf; sand 2,000 psf; sandy gravel 3,000 psf; sedimentary/foliated rock 4,000 psf; crystalline bedrock 12,000 psf
  • Minimum footing depth: 12 in. below undisturbed grade, or below the local frost line (R403.1.4)
  • Foundation wall above finished grade: 6 in. minimum, 4 in. with masonry veneer (R404)
  • Foundation drain gravel: extends 1 ft beyond the footing edge, rises 6 in. above the footing top (R405)
  • Vented crawl space: 1 sq ft per 150 sq ft of floor area, reduced to 1 per 1,500 with a Class I ground vapor retarder (R408)

Floor and deck framing

Lesson 6 covered the floor framing an inspector checks before the subfloor goes down: bearing length at supports, lateral restraint at joist ends, and the notching and boring limits that keep a plumber's drain line from cutting a joist's structural capacity in half. A notch is capped at one-sixth of a sawn joist's depth and is never allowed in the middle third of the span, where bending stress peaks; a bored hole is capped at one-third of the depth with 2 inches of edge clearance. Lesson 7 carried that same load-path thinking outdoors to concrete slabs and wood decks, where a ledger's fasteners, flashing, and a lateral load connection independent of the ledger bolts are what keep a deck from pulling away from the house under load.

Wall framing, headers, and bracing

Lesson 8 set the limits on how much of a stud can be removed for plumbing or wiring before it stops doing its job: 25 percent of the stud depth for a notch and 40 percent for a bored hole in a bearing wall, both relaxed in a non-bearing partition, plus the double top plate that ties the building together as a continuous tension ring. Lesson 9 separated two systems that live in the same wall but do entirely different jobs: headers, which carry gravity load around an opening down through jack studs, and braced wall panels, which carry lateral wind and seismic load down to the foundation. Parallel braced wall lines can be no more than 60 feet apart under the basic prescriptive wind-bracing limits, and adjacent braced wall panels on a line cannot be spaced more than 20 feet apart edge to edge.

Key numbers: wall framing
  • Bearing wall stud: notch 25% max, bored hole 40% max (60% if doubled) (R602.6)
  • Double top plate joints: offset at least 24 in. from joints in the plate below
  • Braced wall line spacing (between parallel lines): 60 ft max for wind bracing, which also governs detached houses in Seismic Design Categories A-C (Table R602.10.1.3); gap between adjacent panel edges on a line: 20 ft max (R602.10.2.2)
  • Method WSP sheathing: 3/8 in. minimum thickness

Wall coverings, roof framing, and roof systems

Lesson 10 moved to the wall's skin: the drainage system behind anchored brick veneer, with its 1-inch minimum air space and weep holes spaced no more than 33 inches on center, and the layered sequencing that keeps flashing, water-resistive barrier, and siding shedding water outward instead of into the framing. Lesson 11 went up into the roof frame itself, where a ridge board is a nailing surface rather than a beam and the real work of holding a sloped roof's walls together falls to a rafter tie in the bottom third of the rafter height, resisting outward thrust, while a collar tie near the ridge resists wind uplift instead. Attic ventilation runs at 1/150 of the vented area, reducible to 1/300 with a qualifying high-and-low vent split. Lesson 12 finished the roof at its covering: asphalt shingles need a 2:12 minimum slope, a roof already carrying two layers cannot take a third without a full tear-off, and a masonry chimney has to clear its roof penetration by 3 feet and any part of the building within 10 feet by 2 feet, whichever is taller.

Life safety: egress, stairs, and alarms

The last two lessons cover the numbers enforced most strictly, because they govern how someone gets out of a house or survives a fall. Lesson 13 set the emergency escape and rescue opening every sleeping room and basement needs: 5.7 square feet of net clear area (5.0 for a grade-floor opening), with 24-inch height and 20-inch width floors that a compliant window has to clear by a real margin, plus the stair geometry, 7-3/4-inch maximum riser, 10-inch minimum tread, 6-foot-8-inch minimum headroom, and the guard required at 36 inches minimum height wherever a walking surface sits more than 30 inches above grade. Lesson 14 closed with smoke alarms in every sleeping room, outside each sleeping area, and on every additional story, carbon monoxide alarms outside each sleeping area, the hazardous-glazing locations near doors, wet areas, and stairs that require tempered or laminated safety glass, and the flame spread limits on interior finishes and insulation.

Key numbers: life safety
  • EERO: 5.7 sq ft net clear area (5.0 grade-floor); 24 in. min. height, 20 in. min. width, 44 in. max sill height (R310)
  • Stairs: riser 7-3/4 in. max, tread 10 in. min., headroom 6 ft 8 in. min., width 36 in. min. (R311.7)
  • Guards: required over 30 in. above grade within 36 in. horizontally; 36 in. min. height; openings will not pass a 4 in. sphere (R312)
  • Smoke alarms: every sleeping room, outside each sleeping area, and every story, interconnected (R314)
  • Hazardous glazing near a door: within 24 in., bottom edge under 60 in. (R308.4)

In the field

A pre-drywall walk on a GCHS rehab or infill job is really the same five stops in the same order every time, because each one is about to disappear behind the next trade's work. Start at the footing and foundation, confirming bearing soil, depth, and anchorage before backfill. Continue to the floodplain elevation check where the site requires one, then to the rough-in trades, plumbing, mechanical, gas, and electrical, checking that nothing has been closed up before it is signed off. Move to the frame inspection, where stud notching and boring, header sizing, braced wall panel connections, and rafter ties all have to be visible at once, because this is the last chance to see them before insulation and drywall go on. Finish at the final inspection, where alarms, glazing, egress, and guards get their last check before a certificate of occupancy is possible. Walking this sequence in order, rather than jumping between rooms, is what keeps an inspector from missing the one item that a later trade is about to bury.

The required inspection sequence from foundation to final A sequence diagram of the required inspections in order: foundation, floodplain elevation where applicable, rough-in covering plumbing, mechanical, gas, and electrical work, frame, and final, matching the sequence from Lesson 1. Each stage sits at the point where the next trade would otherwise cover up work that still needs to be verified. Foundation Before concrete is placed Floodplain Elevation, where applicable Rough-in Plumbing, mechanical, gas, electrical (before concealment) Frame Before insulation and drywall Final Alarms, glazing, egress, guards Same order as Lesson 1's required inspections (R109), applied at the frame and final stages here Each stage is the last chance to verify what the next trade is about to cover up
The five required inspections run in this order because each one checks work the next stage would otherwise bury.

About the practice exam

This course's practice exam draws 60 questions at random from a bank spanning all seven domains covered across these fifteen lessons, with a 120-minute time limit and a suggested target of 70 percent correct. It is a practice tool GCHS built for its own staff development, not an official certification test, and passing it carries no credential beyond confirming your own readiness on this material. As with everything in this course, the locally adopted code, not this practice exam or any lesson in it, governs on an actual job.

Practice questions

1. Under R105.2, a one-story detached accessory structure is exempt from a building permit as long as its floor area does not exceed:

  1. 100 square feet
  2. 200 square feet
  3. 300 square feet
  4. 400 square feet

2. A subcontractor closes a wall cavity with new drywall before the rough electrical inspection has been requested. What is the correct response?

  1. Require the drywall to come off so the concealed work can be inspected before approval
  2. Approve the work, since the inspector can trust the subcontractor's word and the electrician's own sign-off
  3. Issue a certificate of occupancy with a note on file
  4. Require only a photograph, regardless of when it was taken

3. An exterior wall sits 4 feet from the side lot line and has a total wall area of 240 square feet. What is the maximum opening area permitted in that wall face under Table R302.1(1)?

  1. 0 square feet
  2. 120 square feet
  3. 60 square feet
  4. 240 square feet, unrestricted

4. What wall assembly does R302.6 require between an attached private garage and the dwelling?

  1. A tested 1-hour fire-resistance-rated assembly on both faces
  2. 5/8-inch Type X gypsum board on both faces
  3. No specific material, only a solid-core door
  4. Not less than 1/2-inch gypsum board applied to the garage side

5. A proposed bedroom measures 10 feet by 10 feet, for a floor area of 100 square feet. What is the minimum required glazing (light) area under R303.1?

  1. 8 square feet
  2. 4 square feet
  3. 10 square feet
  4. 25 square feet

6. An attic bedroom has a sloped ceiling. For the room to meet R305's height requirement, the required floor area must have:

  1. A 7-foot ceiling over the entire room with no exceptions, since attic rooms are held to the same standard as all others
  2. At least 50 percent of the required floor area at 7 feet or more, with area under 5 feet not counted
  3. A 6-foot-8-inch minimum throughout
  4. No height minimum at all, since sloped ceilings are exempt from R305 in habitable attics

7. Under Table R401.4.1, which soil class carries the lowest presumptive load-bearing value, and what is it?

  1. Sandy gravel, 3,000 psf
  2. Sand, 2,000 psf
  3. Clay, sandy clay, silty clay, and clayey silt, 1,500 psf
  4. Crystalline bedrock, 12,000 psf

8. A footing is placed in an area with a 30-inch frost line, and the footing bottom sits 18 inches below grade. What is the correct finding?

  1. Approve it, since 18 inches exceeds the 12-inch minimum depth below undisturbed ground and the frost line only applies to slabs
  2. Approve it if the concrete is air-entrained
  3. Approve it if the soil is well drained
  4. Reject it; in frost areas the footing must extend below the frost line or use an approved protection method

9. A vented crawl space totals 1,500 square feet with a continuous Class I ground vapor retarder installed. What is the required total vent area?

  1. 1 square foot
  2. 10 square feet
  3. 15 square feet
  4. 150 square feet

10. An inspector finds a shallow notch cut into the top edge of a sawn floor joist at the exact center of its span. What is the finding?

  1. Acceptable, since the notch is shallow
  2. Not acceptable; edge notches are prohibited in the middle third of the span
  3. Acceptable if the notch is patched with construction adhesive and a sistered board nailed alongside
  4. Acceptable up to one-fourth of the joist depth anywhere on the span

11. An inspector checks an older deck and finds sound ledger bolts and sound joists, but no hardware anywhere tying the deck framing to the house framing to resist lateral loads. What is missing?

  1. Additional joist hangers
  2. A wider ledger board
  3. The positive lateral load connection required under R507.9.2, independent of the ledger fasteners
  4. A steeper guard height

12. Where is the required vapor retarder placed relative to a concrete slab and its base course, per R506.2.3?

  1. Below the base course, directly on the subgrade, where it keeps the gravel layer dry
  2. On top of the finished slab
  3. Only around the slab perimeter
  4. Directly under the slab, above the base course or prepared subgrade

13. In a bearing wall, a bored hole in a stud may be no larger than what percentage of the stud's depth under R602.6, without doubling the stud?

  1. 40 percent
  2. 25 percent
  3. 60 percent
  4. 75 percent

14. A braced wall line runs 50 feet along a house front. Two braced wall panels sit near the ends, with 24 feet of unbraced wall between their adjacent edges. What is the finding under R602.10?

  1. Compliant, since the 50-foot line is under the 60-foot maximum spacing between parallel braced wall lines
  2. Non-compliant; the gap between adjacent panel edges exceeds the 20-foot maximum, though line spacing is fine
  3. Compliant if the panels are each 8 feet wide
  4. Non-compliant only if the building is in Seismic Design Category D, since the 20-foot panel gap limit applies only there

15. Anchored brick veneer requires weep holes spaced no more than:

  1. 16 inches on center
  2. 24 inches on center
  3. 33 inches on center
  4. 48 inches on center

16. For 1/2-inch gypsum board fastened without adhesive to a CEILING framed at 16 inches on center, the maximum fastener spacing is:

  1. 8 inches for nails and 16 inches for screws
  2. 6 inches for both
  3. 12 inches for nails and 24 inches for screws
  4. 7 inches for nails and 12 inches for screws

17. A house has a 1,800-square-foot attic, with the required 40-to-50-percent high/low vent split satisfied. Under the reduced 1/300 ratio, what is the minimum total net free ventilation area?

  1. 6 square feet
  2. 12 square feet
  3. 18 square feet
  4. 1.8 square feet

18. An existing roof already carries two layers of asphalt shingles, and a homeowner asks for a third layer to be added over the top. What do R908.3 and R908.3.1.1 require?

  1. Approval, since three layers are allowed with extra fasteners
  2. Complete removal of the existing roof coverings down to the deck before a new layer is installed
  3. Removal of only the top layer
  4. Nothing; reroofing over existing shingles is always exempt from this limit

19. An inspector measures a proposed basement egress window at 22 inches wide by 22 inches high, a net clear area of only about 3.4 square feet. What is the finding?

  1. Compliant, since the width clears the 20-inch minimum and the height is nearly the 24-inch minimum, so the area is close enough
  2. Compliant, since below-grade openings have no area requirement
  3. Non-compliant: the opening is short of the 24-inch minimum height and falls well short of 5.0 square feet
  4. Non-compliant only because of the sill height, not the area

20. A fixed glass panel sits 14 inches from the edge of an entry door, with its bottom edge 20 inches above the floor. Is safety glazing required under R308.4?

  1. No, because the panel is fixed and does not open, so it cannot be struck by someone using the door
  2. Only if the panel also exceeds 9 square feet
  3. No, since only glazing in the door itself is regulated
  4. Yes; the panel is within 24 inches of the door and its bottom edge is under 60 inches

Glossary

Presumptive load-bearing value
A default soil bearing capacity from Table R401.4.1, ranging from 1,500 psf for clay to 12,000 psf for crystalline bedrock, used in place of a geotechnical report.
Braced wall panel
An individual sheathed segment of a braced wall line that resists lateral wind and seismic load, distinct from the gravity load a header carries.
Emergency escape and rescue opening (EERO)
A window or door required in every sleeping room, basement, and habitable attic, checked separately for height, width, and net clear area.
Weep hole
A small opening at the base of a masonry veneer's air space that lets water collected by the flashing drain back to the exterior.
Fireblocking and draftstopping
Materials that close off concealed cavities against fire spread; fireblocking in stud and floor cavities, draftstopping in larger floor-ceiling voids.
3-2-10 rule
The chimney termination rule: at least 3 feet above the roof penetration point, and at least 2 feet higher than any part of the building within 10 feet.
Rafter tie
A ceiling joist or dedicated tie in the bottom third of the rafter height that resists the outward thrust of a sloped rafter pair, distinct from a collar tie near the ridge.
Guard
A protective barrier at an open-sided walking surface more than 30 inches above grade or floor, at least 36 inches high, limiting openings to a 4-inch sphere generally.