Residential Building 100%

2021 IRC R314, R315, R308

Lesson 14: Smoke and CO Alarms, Safety Glazing, and Flame Spread

IRC R314-R315, R308, R302.9-R302.10 · 14 practice questions

0:00 / --:--

Reading

Where Lesson 13 covered getting out of the house, this lesson covers what wakes someone up in time to get out, and what keeps ordinary glass from becoming a weapon when a person falls into it. Sections R314 and R315 set smoke and carbon monoxide alarm requirements, R308 sets where glazing must be the tempered or laminated safety type, and R302.9-R302.10 set limits on how fast interior finishes and insulation can carry a flame. None of these are structural in the way a footing or a header is, but they are consistently the numbers that determine whether occupants survive a fire or a fall that has already started.

Smoke alarms: where they go

R314.3 requires a smoke alarm in each sleeping room, outside each separate sleeping area in the immediate vicinity of the bedrooms, and on each additional story of the dwelling, including basements and habitable attics (crawl spaces and uninhabitable attics are excluded). A two-story house with a basement and three upstairs bedrooms needs at minimum six alarms under this rule: one in each of the three bedrooms, one in the upstairs hall outside the sleeping area, one on the main floor, and one in the basement. In a split-level dwelling with no door between the adjacent levels, an alarm on the upper level can serve a lower level that is less than one full story below it, but the basic pattern is the same everywhere: an alarm close enough to sleepers to wake them, on every level people occupy.

Smoke alarms: power, interconnection, and placement limits

In new construction, smoke alarms must receive their primary power from the building wiring, with battery backup, and must be interconnected so that activating any one alarm sounds every alarm in the dwelling (R314.6, R314.4), and listed wireless alarms can meet the interconnection requirement. A fire starting in a basement has to be able to wake someone sleeping two floors up, which interconnection accomplishes and a standalone battery alarm on each floor does not. Placement is also restricted near features that cause nuisance alarms: an alarm may not be installed within 3 feet horizontally of the door or opening of a bathroom containing a tub or shower, because shower steam trips alarms and alarms that trip constantly get disabled by occupants. Section R314.3.1 keeps alarms away from permanently installed cooking appliances by a distance that depends on the alarm type: not less than 20 feet for ionization alarms, 10 feet for ionization alarms with a silencing switch, and 6 feet for photoelectric alarms or alarms marked as helping reduce cooking nuisance alarms, unless that would prevent placing an alarm that R314.3 requires.

For alterations, repairs, and additions that require a permit, Section R314.2.2 requires the dwelling unit to have smoke alarms located as required for new dwellings, and R314.6 (Exception 2) permits those alarms to be battery powered. Work limited to exterior surfaces (roofing, siding, windows, doors, a porch or deck) or to plumbing or mechanical systems is excepted. This keeps a modest repair from forcing a homeowner to tear open finished walls just to run alarm wiring.

Carbon monoxide alarms

R315.2.1 requires carbon monoxide alarms in new dwelling units that contain a fuel-fired appliance or have an attached garage with an opening into the dwelling, and R315.3 places them outside each separate sleeping area in the immediate vicinity of the bedrooms, on the same reasoning as smoke alarms: occupants are most vulnerable to CO while asleep. Where a fuel-burning appliance is located within a bedroom or its attached bathroom, such as a gas-fired wall furnace, an additional CO alarm is required inside the bedroom, because an alarm outside the door is too far away to protect the person sleeping next to the source. Section R315.2.2 extends the requirement to permitted alterations, repairs, and additions, except exterior-surface work, plumbing, and mechanical work that is not fuel fired.

Safety glazing: the hazardous locations

Key numbers
  • Glazing in doors: a hazardous location, except decorative glazing and openings a 3-inch sphere cannot pass (R308.4.1)
  • Glazing near a door: within 24 inches of either side of the door (or of the hinge side of an in-swinging door on a wall less than 180 degrees from the door), with its bottom edge less than 60 inches above the floor (R308.4.2)
  • Large fixed panels: hazardous only when all four conditions apply together: more than 9 sq ft, bottom edge under 18 inches above the floor, top edge over 36 inches above the floor, and a walking surface within 36 inches horizontally
  • Wet surfaces: glazing less than 60 inches above a tub, shower, spa, or pool standing/walking surface
  • Stairs: glazing less than 36 inches above the walking surface of a stairway, intermediate landing, or ramp (R308.4.6), and glazing less than 36 inches above the bottom landing within a 60-inch arc of the bottom tread nosing (R308.4.7)

R308.4 lists these hazardous locations, and the pattern behind them is consistent: any place where a person's own momentum, wet feet, or a slip near a door could put a body through ordinary glass gets the tempered or laminated safety-glazing requirement instead. The large-panel test is the one most often applied incorrectly in the field because it has four separate conditions that all must be met at once; a panel that is large enough but has its bottom edge well above 18 inches, for example, does not trigger the requirement, because that condition alone is missing.

Safety glazing: marking

Each pane of safety glazing must carry a manufacturer's designation stating who applied it, the type of glass, and the safety standard it meets, and the designation must be visible in the final installation (R308.1). It is acid etched, sandblasted, ceramic-fired, laser etched, embossed, or of a type that cannot be removed without being destroyed, and a label is permitted in lieu of it. The point is a mark an inspector can verify without breaking the pane.

Flame spread and smoke-developed limits

R302.9 limits interior wall and ceiling finish materials to a flame spread index of not greater than 200 and a smoke-developed index of not greater than 450, tested to ASTM E84 or UL 723; trim such as baseboards and handrails, and doors and windows or their frames, are excepted from the flame spread limit. R302.10.1 sets a tighter limit for insulation in floor-ceiling, roof-ceiling, and wall assemblies, crawl spaces, and attics, including facings: a flame spread index of not greater than 25 and a smoke-developed index of not greater than 450, because insulation and its facings are normally concealed behind a finish surface and can spread fire very quickly if left exposed. A facing in a concealed space, installed in substantial contact with the unexposed surface of the finish, such as a kraft-faced batt stapled tight behind drywall, is excused from the limits by Exception 1; the same facing left exposed to a room or garage is not. Kraft-faced batts installed with the facing left exposed in a garage ceiling, a common finding in older additions, are a straightforward violation: the facing is not in a concealed space and does not meet the limit, so it must be covered by a finish with the facing in substantial contact with it. Exposed insulation on an attic floor must also have a critical radiant flux of at least 0.12 watt per square centimeter (R302.10.4).

In the field

A GCHS inspector reviewing a bedroom addition or a basement conversion has to confirm alarms and glazing at the same visit as everything from Lesson 13, because a sleeping room sits at the intersection of several chapters at once. A room can have perfect ceiling height, floor area, and an oversized egress window and still fail for sleeping use if it has no smoke alarm, or if a fixed glass panel next to the entry door sits at 30 inches above the floor with no safety marking. Any one of these failures, not just a combination of several, is enough to keep the room from being approved.

Worked example: checking a glazed door sidelite

An addition has an entry door with a fixed glass sidelite mounted 10 inches from the door edge, bottom edge 8 inches above the floor, top edge 74 inches above the floor, panel area 14 square feet. Two separate hazardous-location tests can apply to the same panel, and either one alone is enough to require safety glazing. First, the door-proximity test: the sidelite is within 24 inches of the door and its bottom edge, at 8 inches, is well under 60 inches, so it is hazardous under that rule by itself. Second, the large-panel test: area is 14 square feet (over 9), bottom edge is 8 inches (under 18), top edge is 74 inches (over 36), and the panel sits at a walking surface within 36 inches of the door threshold, so all four large-panel conditions are also met. Either test would have required safety glazing here on its own; that the panel fails both is not unusual, since doors and their sidelites are exactly where these hazardous-location categories overlap most.

Hazardous glazing locations near a door An elevation drawing of an entry door with a fixed sidelite panel, showing the 24 inch zone measured horizontally from the door edge and the 60 inch height measured from the floor that together define the door-proximity hazardous location. A second panel to the right shows the large-panel test: area over 9 square feet, bottom edge under 18 inches, top edge over 36 inches, and a walking surface within 36 inches, with all four conditions required at once. Door-proximity test Door Sidelite within 24 in. Bottom edge under 60 in. = hazardous Large-panel test (all 4 apply) bottom under 18 in. top over 36 in. Area over 9 sq ft Walking surface within 36 in.
Two hazardous-location tests, door proximity and the large-panel rule, often apply to the same sidelite or window at once.

Practice questions

1. A new two-story house has a basement and three bedrooms upstairs. Which locations must ALL have a smoke alarm?

  1. One alarm on each of the three floors, placed in the main hallway, with none required inside the bedrooms or the basement
  2. In each of the three bedrooms only, since alarms outside the sleeping area are not required
  3. In each bedroom, in the hall outside the sleeping area, and on each story including the basement, interconnected
  4. One in the kitchen and one in the garage

2. In new construction, what must be true about smoke alarm power and interconnection?

  1. Battery power only, no interconnection required
  2. Hardwired with battery backup, interconnected so that any one alarm activates all of them
  3. Interconnected but battery power is not permitted as backup
  4. Each alarm operates fully independently

3. In a permitted alteration of an existing dwelling, how must smoke alarms be provided?

  1. Only in the rooms where the work took place
  2. Located as for new dwellings, with battery-powered alarms permitted
  3. Not required unless the house is more than 20 years old and has no smoke alarms
  4. Hardwired with battery backup in every case, with no exceptions

4. A smoke alarm may generally not be installed within 3 feet horizontally of what location, and why?

  1. A closet door, because dust stirred up when the door opens causes nuisance alarms and shortens sensor life
  2. The door or opening of a bathroom with a tub or shower, because steam causes nuisance alarms
  3. A window, because drafts pull smoke past the sensor and delay the alarm
  4. A ceiling fan, because fan vibration can trigger the sensor and cause false alarms

5. Carbon monoxide alarms are required in a dwelling that has:

  1. A fuel-fired appliance, or an attached garage with an opening into the dwelling
  2. Only electric appliances, since electric equipment can also give off carbon monoxide
  3. More than two stories, since taller dwellings need alarms on every level for CO
  4. A detached garage only, since vehicles idling there can send CO into the house

6. A bedroom contains a gas-fired wall furnace. What additional carbon monoxide alarm requirement applies?

  1. None beyond the alarm outside the sleeping area
  2. An alarm is required in the attic instead
  3. An alarm is required in the kitchen instead
  4. An additional alarm is required inside that bedroom

7. A fixed glass panel sits 12 inches from the edge of an entry door, bottom edge 30 inches above the floor. Is safety glazing required?

  1. Yes, glazing within 24 inches of a door with a bottom edge under 60 inches is hazardous
  2. No, because a fixed panel does not move and so cannot be struck by someone using the door
  3. Only if the panel exceeds 9 square feet
  4. Only in commercial construction

8. A 12-square-foot fixed glass panel has its bottom edge 12 inches above the floor and its top edge 8 feet above the floor, next to a hallway. Is safety glazing required under the large-panel test?

  1. No, the panel is fixed in place
  2. No, not if it is tempered on only one face
  3. Only if it is also within 24 inches of a door
  4. Yes, the panel meets all four conditions of the large-panel hazardous location

9. Glazing enclosing a bathtub or shower is a hazardous location when its bottom exposed edge is less than what height above the standing or walking surface?

  1. 36 inches
  2. 48 inches
  3. 60 inches
  4. 72 inches

10. Each pane of safety glazing in a hazardous location must carry a manufacturer's designation that is:

  1. Marked on the packaging only, then discarded once the glass is installed in the wall opening
  2. Visible in the final installation, stating who applied it, the glass type, and the standard
  3. Recorded only on the shipping invoice
  4. Optional for tempered glass if the installer keeps records

11. Interior wall and ceiling finish materials are limited under R302.9 to a flame spread index of not greater than:

  1. 25
  2. 75
  3. 200
  4. 450

12. Insulating materials installed in wall, ceiling, attic, and crawl-space assemblies, including their facings, are limited under R302.10.1 to a flame spread index of not greater than:

  1. 25, with a smoke-developed index of not greater than 450
  2. 200, with a smoke-developed index of not greater than 450
  3. 75, with a smoke-developed index of not greater than 200
  4. No limit applies to insulation facings

13. An inspector finds kraft-faced batt insulation in a garage ceiling with the facing left exposed to the garage space. What is the finding?

  1. Acceptable, because the facing is a vapor retarder and vapor retarders are exempt from flame spread limits
  2. Acceptable if the garage is detached
  3. A violation; the exposed facing fails the flame spread limit and must be covered by a finish it contacts
  4. Acceptable if the garage is unheated

14. An entry door has a fixed sidelite 10 inches from the door edge, bottom edge 8 inches above the floor, top edge 74 inches above the floor, area 14 square feet. Which hazardous-location tests apply?

  1. Only the door-proximity test, since a sidelite that close to the door is judged by that test alone
  2. Only the large-panel test, since the panel is over 9 square feet and reaches nearly to the floor
  3. Neither test applies, because the sidelite is fixed glass mounted beside the door frame
  4. Both the door-proximity test and the large-panel test apply independently

Glossary

Interconnection
Wiring or a wireless link between smoke alarms so that any one alarm activating sounds all alarms in the dwelling.
Hazardous location (glazing)
A location defined in R308.4, such as near a door, in a wet area, or near a stair, where glass must be tempered or laminated safety glazing.
Large-panel test
A four-part hazardous-location test for fixed glazing: area over 9 sq ft, bottom edge under 18 in., top edge over 36 in., and a walking surface within 36 in.; all four must apply.
Flame spread index
A numeric rating of how quickly flame moves across a material's surface under ASTM E84 or UL 723 testing; interior finishes are capped at 200, insulation (including facings) at 25.
Smoke-developed index
A numeric rating of smoke production during the same flame spread test; capped at 450 for both interior finishes and insulation.
Safety glazing
Tempered or laminated glass required in hazardous locations, carrying a manufacturer's designation visible in the final installation so compliance can be verified without breaking the pane.