HRA100%

HRA / Household selection

Lesson 5: Intake, selection and written decisions

14 practice questions · Sources reviewed October 4, 2026

Uses your browser's available voice.

Reading

Start an auditable intake record

The intake process should allow a reviewer to reconstruct what happened without relying on the employee's memory. Assign a non-sensitive application identifier, record receipt, provide the current eligibility information and identify missing evidence. Use the Department's required forms. Keep a distinction between an inquiry, a submitted intake application, an eligible household, a selected household and an approved funded activity. These states have different consequences.

Intake, selection and written decisions: four decision stagesReceive: Date and identify the intake application; explain requirements and assistance routes.; Select fairly: Use the published window, authorized preferences and neutral selection process.; Decide: Apply documented eligibility criteria and distinguish waitlist from approval.; Notify and retain: Deliver the written decision on time and preserve its basis and delivery evidence.01Receive02Select fairly03Decide04Notify and retain
Intake, selection and written decisions: use each stage with its evidence before advancing.
  1. Receive. Date and identify the intake application; explain requirements and assistance routes.
  2. Select fairly. Use the published window, authorized preferences and neutral selection process.
  3. Decide. Apply documented eligibility criteria and distinguish waitlist from approval.
  4. Notify and retain. Deliver the written decision on time and preserve its basis and delivery evidence.

Collect sensitive records only through approved restricted storage and access channels. The training site and its practice worksheets are not applicant-record systems. Do not put Social Security numbers, identity documents, bank records or medical details into course exercises or browser storage. Fictional cases are sufficient for learning. The actual activity file should use the organization's approved privacy and retention procedures.

Apply the announced selection method

The ordinary federally funded process under 10 TAC 20.8(c) includes an application acceptance period of at least twenty-one calendar days and a neutral random selection process for initial selection. First-come selection is not the initial method for that process. Any authorized preferences are applied as the rule and written policy require. Later first-come processing when funds remain must still follow the policy and applicable rule. Do not import an exception intended for another activity or funding set-aside.

The proposed GCHS control is to preserve the applicant list at closing, the eligible selection population, the approved preference categories, the random-selection method, witnesses or reviewer and the resulting order. Document corrections to duplicates or data errors before the drawing where possible. Never silently remove an applicant to improve the apparent results. If an error is discovered later, retain the original and the authorized corrective decision.

Manage the decision and notice clocks

The current 23.26(9) requires written acceptance or denial within sixty days following receipt of the intake application. Section 20.8(f) separately requires a denial notice with the specific reason within fourteen calendar days of denial. These provisions do not create a sixty-day period followed automatically by another fourteen days. Plan to satisfy both. Log the receipt date, decision date, notice deadline and delivery evidence. Obtain guidance early if missing documents or selection timing create a conflict.

Use plain explanations tied to the actual requirement and evidence. A denial saying only "not qualified" is not useful. Explain the particular unmet condition, give the applicable contact or review route under the approved policy, and provide language or disability access as needed. Do not describe an Administrator's appeal of a Department decision as though it were automatically the household's appeal process. Confirm the required household procedure with TDHCA and the approved local policy.

Handle waitlists honestly

A waitlist position is not an award. Tell applicants what the status means, how contact information can be updated, and what happens when funding or documentation changes. Apply the approved policy consistently to unresponsive applicants, incomplete files, declined assistance and subsequent openings. Retain contact attempts and written status changes. Do not keep an unofficial priority list outside the controlled record.

When someone is selected, recheck information that may have expired or changed before assistance. Income, title, occupancy, funding and environmental conditions may require additional review. Selection does not authorize demolition or guarantee a reservation. Communicate the remaining conditions so the homeowner does not move out, sign a binding contract or incur costs based only on a congratulatory phone call.

Review the process before submitting

Use a second reviewer for the selection and eligibility handoff. The reviewer checks that the file follows the advertised policy, identifies the controlling income limits and rule dates, contains required signatures and explains any exceptions. Record the result and unresolved items. If the file needs correction, keep an audit trail showing what changed and why. The goal is a defensible decision with evidence, not a stack of forms with every box marked yes.

Work the case

The selection drawing occurs forty-five days after one application arrived. Staff plans to wait another month before mailing the decision.

Review the decision

The sixty-day written-notice requirement runs from application receipt in 23.26(9), not from the drawing. Calendar both the receipt-based requirement and the denial-notice rule. Resolve the schedule now and seek guidance if needed; do not reset the receipt date or quietly extend the clock.

Apply it in the file

Authorities for this lesson

Practice questions

1. What starts the sixty-day notice clock in 23.26(9)?

  1. Receipt of the intake application
  2. The contractor's bid date
  3. The first construction draw
  4. The date staff feels the file is ready

2. What is the ordinary minimum initial acceptance period under 20.8(c)?

  1. Seven working days
  2. Twenty-one calendar days
  3. One business day
  4. Until a favored household applies

3. What is the ordinary initial selection method?

  1. First person to call staff
  2. Highest proposed construction price
  3. Neutral random selection under the policy
  4. Contractor preference

4. Which statement about a waitlist is accurate?

  1. It guarantees construction money
  2. It authorizes demolition
  3. It replaces income review
  4. It is not an award

5. What must a denial letter explain?

  1. The specific reason
  2. Only that staff is busy
  3. Only the contractor's opinion
  4. Only the application's file number

6. What is the denial-notice period under 20.8(f)?

  1. Fourteen months from intake
  2. Fourteen calendar days from denial
  3. After all construction finishes
  4. Whenever another application arrives

7. Do the two notice rules automatically allow sixty plus fourteen days?

  1. Yes, in every case
  2. Yes, for all nonprofit administrators
  3. No
  4. Yes, after a selection drawing

8. Where should real applicant identity documents be stored?

  1. The public course folder
  2. A training quiz response
  3. A browser animation's local storage
  4. Approved restricted records storage

9. What should be preserved from a selection drawing?

  1. Method, list, authorized preferences and results
  2. Only the winners' first names
  3. Only the final contractor schedule
  4. Only an unsigned recollection

10. Staff finds a duplicate entry after a drawing. What should happen?

  1. Delete evidence of the original result
  2. Document the error and authorized correction
  3. Move a preferred applicant upward secretly
  4. Redate the intake records

11. Does household selection authorize construction?

  1. Yes, if the owner agrees
  2. Yes, if the bid is cheap
  3. No
  4. Yes, after one phone call

12. Whose appeal process should a household notice describe?

  1. Automatically the Administrator's TDHCA appeal
  2. Only the contractor's bid protest route
  3. A process invented by the receptionist
  4. The applicable household review process

13. What should a second reviewer check?

  1. Evidence and compliance with the selection policy
  2. Only whether every box is checked
  3. Only the total number of pages
  4. Only whether a contractor signed

14. What may need rechecking after waitlist selection?

  1. Nothing once a name is drawn
  2. Information that changed or expired
  3. Only the applicant's preferred paint color
  4. Only the course completion record

Glossary

Intake
Receipt and processing of a household application.
Waitlist
An ordered list governed by the approved selection policy.
Neutral selection
A selection process without unauthorized favoritism.
Denial notice
A written decision giving the specific reason for denial.
Audit trail
A record showing decisions, changes and evidence.
Conditional status
A status with requirements still unresolved.
Previous lessonNext lesson

Print the field checklist · Sources and unresolved decisions