HRA100%

HRA / Completion and accountability

Lesson 14: Closeout, monitoring and the full-file review

20 practice questions · Sources reviewed October 4, 2026

Uses your browser's available voice.

Reading

Close the activity, not just the construction invoice

A completed house, a paid contractor and a closed program activity are different milestones. The final file must demonstrate eligible selection, household and property eligibility, environmental review, procurement, approved assistance documents, construction compliance, financial reconciliation and continuing obligations. Assign a closeout reviewer who can identify missing evidence without relying on the original staff member's recollection.

Closeout, monitoring and the full-file review: four decision stagesReconcile: Match approved scope, costs, payments, match and required final evidence.; Submit and confirm: Meet each deadline and retain accepted HCS status or required corrections.; Hand over: Provide owner documents, warranty and clear continuing obligations.; Retain and improve: Apply retention triggers, resolve findings and correct recurring process failures.01Reconcile02Submit and confirm03Hand over04Retain and improve
Closeout, monitoring and the full-file review: use each stage with its evidence before advancing.
  1. Reconcile. Match approved scope, costs, payments, match and required final evidence.
  2. Submit and confirm. Meet each deadline and retain accepted HCS status or required corrections.
  3. Hand over. Provide owner documents, warranty and clear continuing obligations.
  4. Retain and improve. Apply retention triggers, resolve findings and correct recurring process failures.

Use the current TDHCA HRA file checklist as the controlling document checklist and this course's workbook as a preparation aid. The official checklist distinguishes items retained in the project file from documents submitted at particular stages. Do not upload sensitive records unnecessarily, and do not assume an item can be discarded because it was not uploaded. Mark an item not applicable only with a defensible basis and reviewer.

Reconcile money and evidence

Compare the final approved budget, amendments, invoices, inspections, disbursements, match contributions and retainage. Resolve duplicate charges, unsupported categories and remaining balances. Confirm title or lien evidence, recording and insurance documentation where required. The final packet includes the applicable completion, demolition or MHU removal, replacement-location, mitigation and warranty evidence. Check that each document identifies the correct household and activity.

Track the separate reporting clocks. Current 23.26(17) requires completion-report documents no later than sixty days after activity completion unless extended by amendment. Section 23.31(c)(11) sets a final-disbursement submission requirement tied to Contract termination. Do not use one date to replace the other. Contract-award completion certification and other requested reports have their own deadlines. Calendar the actual required dates from the agreement and Department instructions.

Confirm system status and household handoff

Administrators submit program documentation through TDHCA's Housing Contract System. HUD uses IDIS for federal reporting and disbursement information through the responsible program participants. A saved draft in HCS is not proof that a request was submitted or accepted. Retain the submission status and Department response. Correct rejected or inconsistent information through the authorized process.

The household handoff should provide warranty information, operating and maintenance materials, required notices, assistance documents and a contact for questions. Explain the remaining occupancy and other obligations in an accessible way. Obtain an appropriate receipt or record of delivery. Do not suggest that course completion or a certificate of occupancy cancels affordability restrictions.

Retain records by the correct trigger

Do not assign one destruction date to every item solely from the contractor's final payment. State requirements include retention of household eligibility records after activity completion, subject to applicable federal requirements. Under 24 CFR 92.508(c), homeownership records generally use the project-completion trigger, while recapture or resale instruments extend to five years after the affordability period ends. Written agreements and displacement or acquisition records have their own stated triggers.

An audit, litigation, claim, monitoring or other covered action started before the normal expiration can require longer retention until resolution. The agreement or another applicable requirement can also demand a longer period. Prepare a retention schedule identifying category, trigger date, minimum end date and holds. Obtain authorized review before destruction. Maintain secure backups and test recovery of records while protecting confidential household information.

Respond to monitoring with corrective evidence

TDHCA may review physical condition and administrative compliance through the applicable monitoring process. Read the actual notice and findings letter for scope, due dates and required response. General notice and corrective-action periods in 20.14 do not justify ignoring a shorter authorized notice or assuming an extension. Assign each finding to an owner, identify its cause, document the correction and submit the evidence on time.

A corrected form alone may not correct the underlying process. If the finding involved late income verification, address the calendar and second-review failure as well as the specific file. Keep the Department's closure response. Do not mark a finding closed merely because GCHS sent a reply. Repeated unresolved issues can affect future participation and funding.

Complete a start-to-finish exercise

Use the fictional capstone file in the field workbook. Trace one household from inquiry through affordability tracking. At each handoff, identify the decision, responsible reviewer, evidence and condition that blocks advancement. Correct the fictional defects without inventing missing documents or backdating approvals. Explain the difference between a document that exists, a document that is current, and a document that actually proves the requirement.

Finish with an action list for GCHS readiness: verify the executed HRA agreement and funding window, confirm the open agency questions, approve local procedures, assign roles and test the records workflow. This course prepares staff for those responsibilities. It is independent GCHS training and does not certify TDHCA approval, award eligibility or professional licensure.

Work the case

The house is finished and the contractor is paid. The file lacks a final lien document, HCS still shows a draft request, and the owner has no warranty copy.

Review the decision

The activity is not administratively complete. Obtain and review the required lien evidence, finish and submit the HCS package through the authorized process, and deliver warranty information to the household. Reconcile deadlines and retain acceptance evidence. Do not mark the file closed simply because the physical work ended.

Apply it in the file

Authorities for this lesson

Practice questions

1. Does contractor payment alone prove activity closeout?

  1. Yes, in every case
  2. No
  3. Yes, if the house looks finished
  4. Yes, after one photograph

2. What is the primary document checklist for the actual HRA file?

  1. Only this course's sample worksheet
  2. Only the contractor's invoice list
  3. The current TDHCA HRA checklist
  4. Only a prior AYBR checklist

3. What supports a not-applicable entry?

  1. A blank checkbox
  2. The desire for a shorter file
  3. An unsigned contractor note
  4. Its factual basis and reviewer

4. What must final financial reconciliation compare?

  1. Budget, amendments, invoices, draws, match and retainage
  2. Only the first and last checks
  3. Only the contractor's total
  4. Only the homeowner's estimate

5. What deadline does current 23.26(17) use for completion reports?

  1. Only the date of the next training class
  2. Sixty days after activity completion unless amended
  3. Five years after the first draw
  4. No deadline if the house is occupied

6. What event is used by 23.31(c)(11) for final-disbursement submission?

  1. The first inquiry
  2. The training exam date
  3. Contract termination
  4. The first paint delivery

7. Does a saved HCS draft prove submission?

  1. Yes, if it has a filename
  2. Yes, if a coworker saw it
  3. Yes, after a screenshot
  4. No

8. What is IDIS?

  1. HUD's disbursement and information system
  2. A local contractor bidding app
  3. The HRA exam engine
  4. An alternative to title records

9. What belongs in the household handoff?

  1. Only the final invoice total
  2. Warranty, required documents and continuing-obligation information
  3. Only an internal monitoring memo
  4. Only the contractor's advertisement

10. When are homeownership recapture/resale documents generally retained through?

  1. Only until the contractor is paid
  2. Only until the first inspection
  3. Five years after affordability ends
  4. Only until a new staff member starts

11. What may extend a normal records retention period?

  1. Only a printer malfunction
  2. Only the course title changing
  3. Nothing under any circumstances
  4. An unresolved covered audit or legal action

12. Should every record receive the same destruction date automatically?

  1. No
  2. Yes, based on final payment
  3. Yes, based on the first inquiry
  4. Yes, based on employee retirement

13. When should a monitoring finding be marked closed?

  1. Immediately after sending any response
  2. After the authorized closure is documented
  3. When staff changes its filename
  4. When the contractor stops calling

14. What should a recurring late-certification finding lead to?

  1. Only a new folder color
  2. Deletion of the old calendar
  3. File correction and process improvement
  4. A promise with no evidence

15. A selected owner asks to demolish with private funds before clearance. What should staff do?

  1. Approve because HOME will not pay
  2. Approve because selection is complete
  3. Approve if the contractor is insured
  4. Maintain the environmental hold

16. A current ordinary base example has 1,100 square feet at $150 per square foot. What comparison applies?

  1. The lesser of $165,000 and $175,000
  2. Always the larger number
  3. Always $200,000
  4. Only the final appraised value

17. A proposed thirteen-home HOME construction contract needs what early review?

  1. Only each owner's paint choices
  2. Contract-wide labor-standard applicability
  3. Only a one-house wage assumption
  4. No review because files are separate

18. What should happen when the required source edition is unresolved?

  1. Choose the cheapest interpretation
  2. Use a familiar old number silently
  3. Assign a hold point and obtain direction
  4. Let the homeowner waive it orally

19. Can course completion establish that GCHS has an HRA award?

  1. Yes, after a passing exam
  2. Yes, after all animations play
  3. Yes, after the workbook is printed
  4. No

20. What makes a strong final file review?

  1. Tracing each decision to current applicable evidence
  2. Counting the number of pages
  3. Checking that every file is called final
  4. Removing all difficult questions

Glossary

Closeout
Completion of required administrative and financial actions for the activity.
HCS
TDHCA Housing Contract System.
IDIS
HUD Integrated Disbursement and Information System.
Retention trigger
The event from which a required recordkeeping period runs.
Finding
A documented compliance issue requiring a response.
Corrective action
A documented correction and, where needed, a process improvement.
Previous lessonPractice exam

Print the field checklist · Sources and unresolved decisions