IASSC Body of Knowledge 3.3, Hypothesis Testing · 14 practice questions
0:00 / --:--
Reading
Lesson 2 showed that a sample statistic almost never lands exactly on the
true population parameter, purely because of sampling error. Hypothesis
testing is the formal procedure Green Belts use to decide whether an
observed difference, such as a change in average work-order cycle time
after a process change, is likely a real effect or just that ordinary
sampling noise. Every hypothesis test in this course, from the t-tests in
the next lesson through the chi-square tests three lessons later, follows the
same underlying logic this lesson introduces.
The four possible outcomes of a hypothesis test: two correct decisions, a Type I error (false positive, probability α), and a Type II error (false negative, probability β). Power, the chance of correctly detecting a real effect, is 1 - β.
Null and alternative hypotheses
Every hypothesis test starts by stating two competing claims. The
null hypothesis (H0) is the default, "no difference" or
"no effect" claim, such as "the average work-order cycle time is unchanged."
The alternative hypothesis (Ha) is the claim a team
suspects might actually be true, such as "the average cycle time has
changed." A test never proves H0 true; it only evaluates whether the sample
data provides strong enough evidence against it to reject it in favor of Ha.
If the evidence is not strong enough, the correct conclusion is to
fail to reject H0, never to say H0 has been "accepted" or
"proven," because absence of strong evidence against a claim is not the same
as evidence that the claim is true.
The p-value decision rule
A hypothesis test produces a p-value: the probability of
observing data at least as extreme as what was actually collected, if H0
were true. A small p-value means the observed data would be unlikely under
H0, which counts as evidence against it. The decision rule compares the
p-value to a pre-chosen significance level, alpha (α),
commonly set at 0.05: if p is less than alpha, reject the null hypothesis;
otherwise, fail to reject it.
Worked example. A team compares average work-order cycle
time before a process change (5.4 days) against after the change (4.9
days), runs a t-test, and gets p = 0.021, with alpha set at 0.05 before the
test was run. Since 0.021 is less than 0.05, the team rejects H0 and
concludes the change in average cycle time is statistically significant.
Practical vs. statistical significance
A statistically significant result only says the observed difference is
unlikely to be pure sampling noise; it says nothing about whether that
difference is large enough to matter operationally. With a large enough
sample, even a tiny, practically meaningless difference can produce a very
small p-value. In the cycle-time example above, whether a 0.5-day
improvement is worth the cost of rolling the process change out program-wide
is a practical significance question, answered with
program knowledge and cost data, not with the p-value alone. The reverse
problem also happens: a real, practically important difference can fail to
reach statistical significance if the sample size is too small to detect it
reliably.
Why this matters
A Green Belt who reports "statistically significant" without also asking
"is it big enough to matter" risks recommending an expensive rollout for a
change that will not be noticed on the ground, or dismissing a genuinely
useful improvement because the pilot sample was too small.
The lesson's cycle-time example supports a statistical decision. Deciding whether the improvement is worth deploying also requires program knowledge and cost data.
Type I error, Type II error, and power
Because a hypothesis test is a decision made from incomplete
information, two kinds of mistakes are possible, shown in the figure above.
A Type I error is rejecting a null hypothesis that is
actually true, a false positive, with probability equal to alpha. A
Type II error is failing to reject a null hypothesis that
is actually false, a false negative, with probability called
beta (β). Power is the probability of
correctly detecting a real effect when one exists, defined as 1 - β;
higher power means a lower chance of missing a real improvement or a real
problem.
Sample size is the main lever a Green Belt controls before running a
test. Increasing sample size reduces standard error, which increases power
(and so lowers β) for a given effect size and alpha, without changing
alpha itself. This is the practical reason pilot studies with very small
sample sizes are risky: even a real, meaningful improvement can be missed
simply because the study was underpowered to detect it.
One-tailed vs. two-tailed tests
A two-tailed test checks for a difference in either
direction (Ha: the mean is not equal to some value), splitting alpha
between both tails of the distribution; at alpha = 0.05, each tail gets
0.025, which for a z-test corresponds to a critical value of about
±1.96. A one-tailed test checks for a difference in
only one specified direction (Ha: the mean is greater than, or less than,
some value), placing all of alpha in a single tail; at alpha = 0.05 that
gives a critical value of about 1.645 on that one side. A one-tailed test is
only appropriate when the question genuinely only cares about one
direction, decided before looking at the data, such as "did the defect rate
decrease" when an increase would never change the decision either way;
choosing one-tailed after seeing the data to make a marginal result
significant is not a legitimate use of the technique.
Choosing the right kind of test
Which specific hypothesis test applies depends on the data type and what
is being compared. The next three lessons cover each row below in depth;
this table previews the overall map so each specific test in this course has
a place to fit.
Data type and comparison
Typical test
Continuous, normal data: compare 2 means
2-sample t-test (or paired t-test for matched pairs), Lesson 4
Continuous, normal data: compare 3 or more means
One-way ANOVA, Lesson 4
Continuous, normal data: compare a variance to a target, or two variances
1-sample or 2-sample variance test, Lesson 4
Continuous, non-normal data: compare 2 medians
Mann-Whitney test, Lesson 5
Continuous, non-normal data: compare 3 or more medians
Kruskal-Wallis or Mood's median test, Lesson 5
Attribute (discrete) data: compare 1 or 2 proportions
1-sample or 2-sample proportion test, Lesson 6
Attribute (discrete) data: test association between two categorical variables
Chi-square test of independence, Lesson 6
Practice questions
1. What roles do the null hypothesis (H0) and alternative hypothesis (Ha) play in a hypothesis test?
H0 and Ha are chosen after the data is collected, based on the result
Ha is the default claim that is assumed true until disproved; H0 is what a team suspects and hopes to demonstrate
H0 is always true; Ha is always false
H0 is the default "no difference" claim; Ha is the claim being tested against it
Answer: d. H0 is the default "no difference" or "no effect" claim; Ha is the claim a team suspects might be true, evaluated against H0 using the sample data.
2. Which decision rule is correctly phrased?
If p is less than alpha, reject the null hypothesis; otherwise, fail to reject it
The null hypothesis is proven true whenever p is greater than alpha, because the data then contradict the alternative
If p is greater than alpha, reject the null hypothesis
If p is less than alpha, accept the null hypothesis
Answer: a. The correct rule is: if p < alpha, reject H0; otherwise, fail to reject H0. A test never "accepts" or "proves" the null hypothesis.
3. A test comparing cycle time before and after a process change returns p = 0.021, with alpha set at 0.05 before the test. What is the correct decision?
The test is inconclusive because p is not exactly 0, so a larger sample must be collected before any decision
Accept H0 as proven true
Reject H0; the difference is statistically significant at alpha = 0.05
Fail to reject H0, since 0.021 is a small number
Answer: c. Since 0.021 is less than the pre-set alpha of 0.05, H0 is rejected and the result is statistically significant.
4. What does "practical significance" add to a statistically significant result?
Whether the size of the effect is large enough to matter operationally, which the p-value alone does not tell you
Nothing; a statistically significant result is automatically practically significant
It replaces the need for a p-value entirely
It is a stricter version of the same alpha threshold
Answer: a. Statistical significance says a difference is unlikely to be pure chance; practical significance asks whether that difference is big enough to be worth acting on.
5. A very large sample detects a statistically significant, p = 0.001, difference in average rent-collection error of $0.03 per invoice. What does this scenario illustrate?
The p-value is invalid because it is less than 0.05
The result is both statistically and practically significant, because p is below 0.05 by a wide margin
A statistically significant result that is likely too small to be practically significant
A Type II error has definitely occurred
Answer: c. A large enough sample can make even a tiny, operationally meaningless difference statistically significant, illustrating why practical significance must be judged separately.
6. What is a Type I error?
Failing to reject a false null hypothesis, a false negative, with probability alpha (the significance level)
Correctly rejecting a false null hypothesis
Rejecting a null hypothesis that is actually true, a false positive, with probability alpha
Correctly failing to reject a true null hypothesis
Answer: c. A Type I error is a false positive: rejecting a null hypothesis that is actually true, with probability equal to alpha.
7. What is a Type II error?
Rejecting a null hypothesis that is actually true, a false positive, with probability beta (the power of the test)
Correctly rejecting a false null hypothesis
Setting alpha too low before running the test
Failing to reject a null hypothesis that is actually false, a false negative, with probability beta
Answer: d. A Type II error is a false negative: failing to reject a null hypothesis that is actually false, with probability beta.
8. How is the statistical power of a test defined?
Power = beta
Power = 1 - beta, the probability of correctly detecting a real effect
Power = alpha
Power = 1 - alpha, the probability of correctly failing to reject a true null hypothesis
Answer: b. Power is defined as 1 - beta: the probability of correctly rejecting a false null hypothesis, that is, correctly detecting a real effect.
9. Holding alpha and the true effect size constant, what happens to a test's power as sample size increases?
Power increases, because standard error shrinks and beta falls
Power is unaffected by sample size
Power becomes exactly equal to alpha
Power decreases, because a larger sample makes the test more likely to reject a true null hypothesis
Answer: a. A larger sample size reduces standard error, which increases power (1 - beta) for a given alpha and effect size, lowering the chance of a Type II error.
10. At alpha = 0.05, which pair of critical z-values is correct for a two-tailed test versus a one-tailed test?
Two-tailed: 1.645; one-tailed: 1.96, because the one-tailed test splits alpha between two tails
Two-tailed: about 1.96; one-tailed: about 1.645
Both are exactly 2.58
Two-tailed: 1.28; one-tailed: 1.645
Answer: b. A two-tailed test at alpha = 0.05 splits alpha into 0.025 per tail, giving a critical value of about ±1.96; a one-tailed test puts all of alpha in one tail, giving a critical value of about 1.645.
11. When is a one-tailed hypothesis test appropriate?
Never; two-tailed tests are always required
When the question genuinely cares about a change in only one specified direction, decided before the data is examined
Whenever a two-tailed result narrowly misses significance, to make it significant
Only when the sample size is below 30
Answer: b. A one-tailed test is appropriate only when the direction of interest is specified in advance and the opposite direction is genuinely irrelevant to the decision, not chosen after seeing the data to reach significance.
12. A team has continuous, normally distributed cycle-time data from two crews and wants to compare their average cycle times. Which test fits?
Chi-square test of independence
1-sample proportion test
Mann-Whitney test
2-sample t-test
Answer: d. Comparing the means of two groups of continuous, normally distributed data calls for a 2-sample t-test.
13. A team has continuous but clearly non-normal (heavily skewed) data from four crews and wants to compare their medians. Which kind of test fits?
2-sample proportion test
Simple linear regression
One-way ANOVA
Kruskal-Wallis or Mood's median test
Answer: d. Comparing medians across three or more groups of non-normal continuous data calls for a nonparametric test such as Kruskal-Wallis or Mood's median, covered in Lesson 5.
14. A team wants to test whether inspection outcome (pass/fail) is associated with which crew performed the work, using counts in a table of crew by outcome. Which test fits?
2-sample t-test on each crew’s average score
One-way ANOVA
Chi-square test of independence
Simple linear regression
Answer: c. Testing whether two categorical variables, such as crew and pass/fail outcome, are associated using count data calls for a chi-square test of independence.
Glossary
Null hypothesis (H0)
The default "no difference" or "no effect" claim a hypothesis test evaluates evidence against.
Alternative hypothesis (Ha)
The claim a team suspects might be true, accepted only if there is strong enough evidence against H0.
P-value
The probability of observing data at least as extreme as what was collected, if H0 were true.
Type I error
Rejecting a true null hypothesis, a false positive, with probability alpha.
Type II error
Failing to reject a false null hypothesis, a false negative, with probability beta.
Power
The probability of correctly detecting a real effect, equal to 1 - beta.
Practical significance
Whether an observed effect is large enough to matter operationally, distinct from statistical significance.
One-tailed / two-tailed test
A one-tailed test checks for a difference in one specified direction; a two-tailed test checks for a difference in either direction.