Lean Six Sigma 100%

Green Belt · Analyze phase

Lesson 2: Inferential statistics

IASSC Body of Knowledge 3.2, Inferential Statistics · 14 practice questions

0:00 / --:--

Reading

GCHS cannot re-inspect every home it has ever rehabbed before deciding whether the program's quality has improved. What it can do is inspect a manageable sample and use inferential statistics, the branch of statistics that draws conclusions about a whole population from a properly drawn sample, to say something trustworthy about the whole program. Inferential statistics is the foundation under nearly every tool in the rest of this Green Belt tier: hypothesis tests, confidence intervals, regression, and control charts are all, at bottom, ways of using limited data to make a defensible statement about something larger than the data itself.

From population, to repeated samples, to the sampling distribution of the mean Left panel: a population of scattered points with a true mean mu marked by a dashed line. Middle panel: four repeated samples of n=5 points each, with each sample's own mean marked, showing the sample means differ from each other and from mu. Right panel: two bell curves on a shared axis, both centered on mu; the curve for n=5 is wide and short, the curve for n=30 is narrow and tall, illustrating that the standard error of the mean shrinks as sample size grows. Population true mean μ, true σ Repeated samples, n = 5 Sample 1 Sample 2 Sample 3 Sample 4 Each sample's own mean (orange tick) lands close to, but not exactly on, the population mean. Sampling distribution of x̄ sample mean (x̄) n = 5 n = 30 Bigger n narrows the spread: SE = σ / √n
Every draw from the population gives a slightly different sample and a slightly different sample mean. Plotting all those possible sample means produces the sampling distribution of the mean, which the Central Limit Theorem says approaches a normal shape and narrows as sample size n grows.

Population, sample, parameter, statistic

A population is the complete set of items, homes, or events a question is really about, such as every rehab GCHS has completed. A sample is the subset actually measured. A number that describes the population, such as its true mean (μ) or true standard deviation (σ), is a parameter; a number calculated from a sample, such as a sample mean (x̄) or sample standard deviation (s), is a statistic. Inference is the disciplined process of using a statistic, plus knowledge of how much sample statistics vary from sample to sample, to make a defensible claim about the unknown parameter. A Green Belt who reports "x̄ = 3.2 days" has reported a statistic; a Green Belt who says "we are 95 percent confident the true average cycle time is between 2.9 and 3.5 days" has performed inference.

Sampling techniques

How a sample is drawn determines whether inference from it can be trusted. The common techniques:

  • Simple random sampling: every item in the population has an equal chance of selection, for example numbering all 500 completed rehabs and drawing 30 at random.
  • Stratified sampling: the population is split into meaningful subgroups (strata), such as county, and a sample is drawn from each stratum in proportion to its size, guaranteeing every county is represented.
  • Systematic sampling: items are selected at a fixed interval from an ordered list, such as inspecting every 10th work order in the sequential log.
  • Cluster sampling: whole naturally occurring groups (clusters) are randomly selected and every item within a selected cluster is measured, such as randomly picking five neighborhoods and inspecting every home in each.
  • Subgroup (rational subgroup) sampling: samples are drawn so that variation within a subgroup reflects only common-cause variation, isolating a specific source, such as sampling five consecutive units from one crew's output rather than mixing crews together.

Two different problems can affect any of these techniques. Sampling error is the ordinary, unavoidable difference between a sample statistic and the true population parameter, caused purely by chance; it shrinks as sample size grows. Bias is a systematic distortion caused by a flawed sampling method, such as only inspecting homes that are easy to reach; it does not shrink with a bigger sample and can only be fixed by changing how the sample is drawn.

Why this matters

A biased sample of 10,000 homes is still worthless for inference; a random sample of 30 is usable. Exam scenario questions in this section almost always hinge on telling sampling error and bias apart, or naming which sampling technique a described scenario used.

The Central Limit Theorem

The Central Limit Theorem (CLT) is the reason inference about a mean works at all. It states that as sample size n grows, the sampling distribution of the sample mean approaches a normal distribution, regardless of the shape of the underlying population distribution, and it is centered on the true population mean μ. The spread of that sampling distribution is measured by the standard error of the mean:

SE = σ / √n

As n increases, √n grows, so SE shrinks: larger samples produce sample means that cluster more tightly around the true population mean, which is exactly what the narrowing curves in the figure above show. A common rule of thumb is that n ≥ 30 is usually enough for the sampling distribution of the mean to be treated as approximately normal, but this is a guideline, not a law: a population that is heavily skewed or has extreme outliers may need a considerably larger n before the approximation is trustworthy, while a population that is already close to normal can behave well with a much smaller n.

Worked example. Suppose the wall-gap measurement from Lesson 1 has a true population standard deviation σ = 0.15 inch. For a sample of n = 5 walls, SE = 0.15 / √5 = 0.15 / 2.236 ≈ 0.067 inch. For a sample of n = 30 walls, SE = 0.15 / √30 = 0.15 / 5.477 ≈ 0.027 inch. Increasing the sample sixfold, from 5 to 30, cuts the standard error by more than half, which is why the n = 30 curve in the figure is so much narrower than the n = 5 curve.

Confidence intervals: a first look

A confidence interval uses a sample statistic plus its standard error to build a range of plausible values for the unknown population parameter, instead of reporting a single number as if it were exact. The general form is:

point estimate ± (critical value × standard error)

For example, x̄ ± z × (σ / √n) when σ is known, or x̄ ± t × (s / √n) when it is estimated from the sample, using the t-distribution instead of the normal distribution to account for that extra uncertainty. A correctly stated 95 percent confidence interval means that if the same sampling procedure were repeated many times, about 95 percent of the intervals constructed that way would contain the true population parameter. It is a statement about the reliability of the method over many repetitions, not a 95 percent probability that this one specific interval happens to contain the true value, which is a common misreading worth avoiding both on the exam and in practice. The hypothesis-testing lessons that follow rest on this same standard-error logic.

Practice questions

1. What is the correct distinction between a population and a sample?

  1. A sample is a purely theoretical concept with no real data, while a population is the set of items that were actually measured
  2. A population is always smaller than a sample
  3. A population is the complete set a question is about; a sample is the subset actually measured
  4. They are interchangeable terms for the same thing

2. Which pair correctly matches "parameter" and "statistic" to their descriptions?

  1. Parameter describes a sample (such as x̄ or s); statistic describes the entire population (such as μ or σ)
  2. Both terms describe only sample data
  3. Parameter describes a population (such as μ); statistic describes a sample (such as x̄)
  4. Both terms describe only population data

3. GCHS numbers all 500 completed rehabs and uses a random number generator to select 30 of them for inspection, with every rehab having an equal chance of selection. Which sampling technique is this?

  1. Cluster sampling
  2. Systematic sampling
  3. Stratified sampling
  4. Simple random sampling

4. GCHS splits its completed rehabs by county and draws a sample from each county in proportion to how many rehabs that county has. Which sampling technique is this?

  1. Simple random sampling
  2. Stratified sampling
  3. Cluster sampling
  4. Systematic sampling

5. An inspector reviews every 10th work order in a sequential log, starting from a random point. Which sampling technique is this?

  1. Systematic sampling
  2. Stratified sampling
  3. Rational subgrouping only
  4. Cluster sampling

6. GCHS randomly selects five neighborhoods and inspects every home within each selected neighborhood. Which sampling technique is this?

  1. Cluster sampling
  2. Stratified sampling
  3. Systematic sampling
  4. Simple random sampling

7. A program only ever inspects homes that are easy for staff to reach, systematically skipping remote sites. What does this produce, and does a larger sample fix it?

  1. Bias, which is not fixed by increasing sample size
  2. Sampling error, which is fixed by increasing sample size
  3. Neither bias nor sampling error; the data is still trustworthy
  4. A rational subgroup, which improves the estimate

8. What does the Central Limit Theorem state about the sampling distribution of the mean?

  1. It stays exactly the same shape as the population distribution no matter what the sample size is, so skewed data stay skewed at any n
  2. It only applies when the population is already known to be normal
  3. It becomes more spread out as sample size increases
  4. It approaches a normal distribution as sample size grows, regardless of the population's shape

9. A characteristic has a true population standard deviation σ = 0.20. What is the standard error of the mean for a sample of n = 25? (SE = σ / √n)

  1. 0.008
  2. 0.80
  3. 0.20
  4. 0.04

10. With σ = 0.15 inch, the standard error at n = 5 is about 0.067 inch and at n = 30 is about 0.027 inch. What does this comparison demonstrate?

  1. Standard error grows as sample size grows, so larger samples give less precise estimates of the mean and pilot studies should stay small
  2. Standard error shrinks as sample size grows, so larger samples give more precise estimates of the mean
  3. The population standard deviation changed between the two samples
  4. Standard error is unrelated to sample size

11. What is the correct way to treat the "n ≥ 30" rule of thumb for the sampling distribution of the mean to be approximately normal?

  1. Irrelevant, since the Central Limit Theorem never requires any minimum sample size
  2. A guideline; a heavily skewed population may need a larger n, while a near-normal population can work with smaller n
  3. An exact law that applies identically to every population
  4. A rule that only applies to discrete distributions

12. What is a confidence interval?

  1. The probability that the null hypothesis is true
  2. A chart showing whether a process is in control
  3. A range built from a point estimate plus or minus a margin of error, meant to plausibly contain the true population parameter
  4. A single exact value for the population parameter, calculated from every item in the population rather than from one sample of it

13. What is the correct interpretation of a 95 percent confidence interval for a mean?

  1. The sample mean is wrong 5 percent of the time
  2. There is a 95 percent chance this specific interval contains the true mean
  3. If the sampling procedure were repeated many times, about 95 percent of the intervals constructed that way would contain the true mean
  4. 95 percent of the population's individual values fall inside this interval

14. Which formula correctly defines the standard error of the mean?

  1. SE = n / σ
  2. SE = σ / √n
  3. SE = σ2 / n2
  4. SE = σ × n

Glossary

Population
The complete set of items, homes, or events a question is really about.
Sample
The subset of the population actually measured.
Parameter
A number that describes a population, such as μ or σ.
Statistic
A number calculated from a sample, such as x̄ or s.
Sampling error
Ordinary, unavoidable chance difference between a sample statistic and the true population parameter; it shrinks as sample size grows.
Bias
A systematic distortion caused by a flawed sampling method; it does not shrink with a larger sample.
Central Limit Theorem
States that the sampling distribution of the mean approaches a normal shape as sample size grows, regardless of the population's shape.
Standard error (SE)
The standard deviation of the sampling distribution of the mean, equal to σ / √n.