Lesson 4: The Lean enterprise, the seven wastes, and 5S
IASSC Body of Knowledge 1.4, The Lean Enterprise · 14 practice questions
0:00 / --:--
Reading
This lesson closes out the Define phase material by introducing Lean, the
second half of "Lean Six Sigma." Where Six Sigma is primarily concerned with
reducing variation and defects, Lean is primarily concerned with eliminating
waste and speeding up flow. Yellow Belts need a working grasp of both, since
most real projects use tools from each side.
The seven elements of waste, remembered by the acronym TIMWOOD: Transportation, Inventory, Motion, Waiting, Overproduction, Overprocessing, and Defects.The 5S cycle repeats: Sort, Set in Order, Shine, Standardize, and Sustain, then back to Sort.
Understanding Lean
Lean is a philosophy and set of tools aimed at maximizing customer value
while minimizing waste, on the principle that any activity a customer would
not knowingly pay for is waste and a candidate for elimination or reduction.
Lean does not ask "how do we do this faster with more people," it asks "does
this step need to exist at all, and if it does, how do we do it with the
least possible waste." That distinction is why Lean projects often produce
results with no new investment at all, simply by removing steps that were
never adding value in the first place.
The history of Lean
Lean's practices trace primarily to the Toyota Production
System, developed in Japan after World War Two, most closely
associated with Taiichi Ohno and Shigeo Shingo. Facing capital and material
shortages very different from post-war American manufacturing's abundance,
Toyota built a system focused on producing only what was needed, when it was
needed, in the amount needed, and on relentlessly removing anything that did
not directly contribute to that goal. The term "lean production" was coined by John Krafcik in a 1988 article, and
it was popularized for a Western business audience by the 1990 book "The
Machine That Changed the World," which studied Toyota's methods against the
rest of the global auto industry.
Lean and Six Sigma together
Six Sigma alone is very good at reducing variation and defects but, on
its own, has no dedicated toolset for eliminating waste or speeding up flow.
Lean alone is very good at speeding up flow and removing waste but has no
dedicated statistical toolset for understanding why a process varies. Lean
Six Sigma merges the two: Lean's waste-elimination tools are typically
applied early, since removing waste is often fast and cheap, while Six
Sigma's statistical tools are applied to the variation and defect problems
that remain once the obvious waste is gone. A project is rarely purely one or
purely the other in practice.
The seven elements of waste
Lean identifies seven classic categories of waste, all traced back to the
Toyota Production System. A widely used way to remember them is the acronym
TIMWOOD:
Transportation: unnecessary movement of materials,
products, or information between steps or locations.
Inventory: more material, work in process, or finished
goods on hand than is needed to meet actual demand.
Motion: unnecessary movement by people, as distinct from
transportation of materials, such as walking, reaching, or searching.
Waiting: idle time whenever a person, a part, or
information is not actively being worked on.
Overproduction: producing more, sooner, or faster than
the next step or the customer actually needs, widely considered the most
serious of the seven because it hides and generates the other six.
Overprocessing: doing more work, or a higher level of
precision or quality, than the customer actually requires or is willing to
pay for.
Defects: any output that fails to meet requirements,
requiring rework, scrap, or a redo of the work already done.
Identifying which of these seven a given inefficiency falls under is
usually the first move in a Lean improvement, because each category points
toward a different family of tools and fixes.
5S
5S is a Lean workplace organization method, also from Toyota's practice,
built around five sequential steps, each an English approximation of a
Japanese original term:
Sort (Seiri): separate what is needed from what is not,
and remove what is not.
Straighten, or Set in Order (Seiton): arrange what
remains so it has an obvious place and is easy to find, use, and return.
Shine (Seiso): clean the workspace and equipment, which
also surfaces problems, such as a leak or a wear pattern, that dirt and
clutter would otherwise hide.
Standardize (Seiketsu): establish a consistent way of
doing Sort, Straighten, and Shine so the improvement does not depend on one
person's memory or habits.
Sustain, or Self-Discipline (Shitsuke): build the
habits and accountability that keep the first four steps from quietly
decaying back to the old, cluttered state within a few weeks.
5S is often a team's first hands-on Lean exercise because its benefits
are immediate and visible, and because a workplace that cannot sustain basic
organization is a poor candidate for more advanced Lean or Six Sigma work
layered on top of it.
Practice questions
1. What is Lean primarily concerned with, as distinct from Six Sigma's primary focus?
Eliminating waste and speeding up flow
Calculating Defects Per Million Opportunities
Designing experiments with multiple factors
Reducing statistical variation in a process
Answer: a. Lean is primarily concerned with eliminating waste and speeding up flow, while Six Sigma is primarily concerned with reducing variation and defects.
2. Lean's core question about a process step is best summarized as what?
How can we add more people or overtime hours to do this step faster
How can we add more inspection to this step
Does this step need to exist, and if so, how is it done with the least waste
How can we increase inventory buffers to avoid ever running out of material or parts
Answer: c. Lean asks whether a step needs to exist at all, and if it does, how to do it with the least possible waste, rather than simply asking how to do it faster with more resources.
3. Lean's practices trace most closely to which production system?
The Toyota Production System
The Ford assembly line of the 1910s
The Motorola Six Sigma program
General Electric's Work-Out program
Answer: a. Lean's practices trace primarily to the Toyota Production System, developed in Japan after World War Two, most closely associated with Taiichi Ohno and Shigeo Shingo.
4. Within Lean Six Sigma, waste-elimination tools from Lean are typically applied at what point relative to Six Sigma's statistical tools?
Only after the project has been formally closed and the control plan handed off
Only during the Control phase
Early, since removing waste is often fast and cheap
Never; the toolsets serve different projects and are never combined in a single one
Answer: c. Lean's waste-elimination tools are typically applied early, since removing waste is often fast and cheap, while Six Sigma's statistical tools address the variation that remains.
5. In the TIMWOOD acronym for the seven wastes, what does the "M" stand for?
Materials
Motion
Management
Measurement
Answer: b. The M in TIMWOOD stands for Motion, unnecessary movement by people, as distinct from Transportation, which covers movement of materials.
6. Which of the seven wastes is widely considered the most serious because it hides and generates the other six?
Waiting
Defects
Overproduction
Inventory
Answer: c. Overproduction, making more, sooner, or faster than actually needed, is widely considered the most serious waste because it hides and generates the other six.
7. Doing more work or a higher level of precision than the customer actually requires or is willing to pay for is an example of which waste?
Motion
Overprocessing
Transportation
Inventory
Answer: b. Overprocessing is doing more work, or a higher level of precision or quality, than the customer actually requires or is willing to pay for.
8. What is the correct order of the five 5S steps?
Sustain, Shine, Sort, Straighten, Standardize
Sort, Straighten, Shine, Standardize, Sustain
Shine, Sort, Standardize, Straighten, Sustain
Standardize, Sustain, Sort, Straighten, Shine
Answer: b. The 5S sequence is Sort, Straighten (Set in Order), Shine, Standardize, and Sustain (Self-Discipline).
9. What is the purpose of the "Shine" step in 5S beyond basic cleanliness?
It is purely cosmetic, so it can be skipped when the workspace already looks tidy
It is the final step in the 5S sequence
It replaces the need for the Sort step
It surfaces problems, such as leaks or wear, that dirt would hide
Answer: d. Cleaning the workspace and equipment during Shine also surfaces problems, such as leaks or wear patterns, that dirt and clutter would otherwise hide.
10. Why is 5S often a team's first hands-on Lean exercise?
Because it is the most expensive Lean tool to implement and returns the largest savings
Because its benefits are immediate and visible, and later Lean work depends on it
Because it replaces the need for a project charter and a formal sponsor sign-off
Because it requires advanced statistical training to perform correctly and cannot be done without a Black Belt
Answer: b. 5S's benefits are immediate and visible, and a workplace that cannot sustain basic organization is a poor candidate for more advanced Lean or Six Sigma work layered on top of it.
11. Which 1990 book, based on a study of the global auto industry, popularized the term "Lean" and Toyota's methods for a Western business audience?
"The Machine That Changed the World"
"The Toyota Way"
"Six Sigma for Dummies"
"Out of the Crisis"
Answer: a. "The Machine That Changed the World" (1990), which studied Toyota's methods against the rest of the global auto industry, is widely credited with popularizing "Lean" for a Western audience; the term "lean production" itself was coined by John Krafcik in 1988.
12. Materials for a GCHS rehab job are hauled from the supply yard to a staging lot, moved again to the job site, and then carried a second time to the room where they will be installed, because deliveries were never planned around the work sequence. Which of the seven wastes does this best illustrate?
Overprocessing
Waiting
Motion
Transportation
Answer: d. Moving the same materials through several locations before use is Transportation, unnecessary movement of materials between steps or locations, distinct from Motion, which is unnecessary movement by people.
13. GCHS's warehouse holds three times the drywall and lumber actually needed for the homes currently scheduled, tying up cash and storage space. This is an example of which waste?
Defects
Motion
Overproduction
Inventory
Answer: d. Inventory is more material, work in process, or finished goods on hand than is needed to meet actual demand.
14. A GCHS process improvement team finds that a work-order intake process has several clearly unnecessary steps and also a high defect rate in data entry. Following the typical Lean Six Sigma approach, what should the team do first?
Apply Six Sigma control charts before evaluating what steps exist
Run a designed experiment before touching any steps
Remove the obviously unnecessary steps using Lean tools before applying Six Sigma's statistical tools to the remaining variation
Ignore the wasteful steps and go straight to hypothesis testing
Answer: c. Lean's waste-elimination tools are typically applied early, since removing obvious waste is fast and cheap, before Six Sigma's statistical tools are applied to whatever variation remains.
Glossary
Lean
A philosophy and set of tools aimed at maximizing customer value while minimizing waste.
Toyota Production System (TPS)
The production system developed at Toyota after World War Two, most closely associated with Taiichi Ohno and Shigeo Shingo, that Lean's practices trace back to.
TIMWOOD
The acronym for the seven classic wastes: Transportation, Inventory, Motion, Waiting, Overproduction, Overprocessing, Defects.
Overproduction
Producing more, sooner, or faster than the next step or the customer actually needs; widely considered the most serious waste because it hides and generates the other six.
5S
A Lean workplace organization method with five sequential steps: Sort, Set in Order, Shine, Standardize, Sustain.
Value-Added Activity
A process step that a customer would knowingly pay for, as distinguished from non-value-added waste.