Lesson 5: Mapping the process (fishbone, SIPOC, value stream maps, the X-Y diagram, and FMEA)
IASSC Body of Knowledge 2.1, Process Definition · 14 practice questions
0:00 / --:--
Reading
This lesson opens the Measure phase, and with it, the second half of the
Yellow Belt Body of Knowledge. Before a process can be measured meaningfully,
it has to be defined clearly, on paper, in a way the whole team agrees on.
This lesson covers four tools used to do exactly that, plus a fifth tool
used to anticipate where a process is likely to fail before it does.
Five process mapping and analysis tools and the specific job each one is built for.
Cause and effect diagrams (fishbone or Ishikawa diagrams)
A cause and effect diagram, also called a fishbone diagram for its shape
or an Ishikawa diagram after its creator Kaoru Ishikawa, is a structured
brainstorming tool for organizing possible causes of a specific effect, such
as a defect or a delay. The effect is written at the head of the diagram,
and possible causes branch off a central spine, typically grouped into
standard categories such as Man (people), Machine, Method, Material,
Measurement, and Mother Nature (environment), sometimes shortened to the
"6 Ms." The tool's value is in forcing a team past the first, most obvious
cause that comes to mind and into a genuinely wide search across every
category before jumping to conclusions.
SIPOC
SIPOC is a high-level process map that stands for Suppliers,
Inputs, Process, Outputs, Customers. It is typically the very first
mapping tool used on a new project, built at a high level, five to seven
process steps at most, to establish a shared, agreed-upon boundary for what
the project is actually looking at before anyone drills into detail.
Suppliers provide inputs, inputs feed the process, the process produces
outputs, and outputs go to customers. Building a SIPOC as a team exercise
early in a project frequently surfaces disagreements about where the process
even starts and ends, disagreements that are far cheaper to resolve in a
one-hour SIPOC session than after weeks of data collection on the wrong
boundary.
A high-level SIPOC follows the relationships described in the reading. Agree on these boundaries before drilling into the process.
Value Stream Mapping
A Value Stream Map, or VSM, is a more detailed map than a SIPOC, showing
both the flow of material and the flow of information through a process,
step by step, with the actual time each step takes. Every step is
classified as value-added, something the customer would knowingly pay for,
or non-value-added, everything else, which is where the seven wastes from
Lesson 4 typically get identified in concrete, measured form rather than as
abstract categories. A current-state VSM documents the process as it
actually runs today, including all its waste; a future-state VSM then
depicts the target process once that waste is removed, and the gap between
the two becomes the team's improvement roadmap.
The X-Y diagram
An X-Y diagram, also called a cause and effect matrix, is a structured
way to prioritize a long list of potential input variables, the X's, against
the outputs, the Y's, that matter to the customer. Each X is rated for how
strongly it is believed to affect each Y, and the ratings are combined into a
single score per X. The result is a ranked list showing which handful of
inputs are most likely worth investigating first with real data, turning a
brainstormed list of twenty or thirty possible causes into the small number
a team can realistically chase down in the Analyze phase.
Failure Modes and Effects Analysis (FMEA)
FMEA is a structured tool for anticipating how a process or product could
fail before it actually does, rather than waiting to discover failure modes
after the fact. For each step in a process, the team identifies the ways it
could fail, the potential effect of that failure, and its potential
causes, then rates each failure mode on three factors: Severity,
how serious the effect would be; Occurrence, how likely the
cause is to happen; and Detection, how likely the failure
is to be caught before it reaches the customer. Multiplying these three
ratings together produces a Risk Priority Number (RPN) for
each failure mode, which the team uses to prioritize where to focus
preventive action, the same way Pareto analysis prioritizes which existing
defects to chase first. A high RPN does not always mean the most severe
failure; a moderately severe failure that happens often and is hard to
detect can outrank a catastrophic failure that almost never happens and is
always caught.
Why this matters
Exam questions in this area are usually "which tool" questions in disguise: they describe a need in plain language and expect you to name the matching tool, not explain how to build one.
Practice questions
1. What is another common name for a cause and effect diagram?
Value stream map
Fishbone or Ishikawa diagram
X-Y diagram
SIPOC diagram
Answer: b. A cause and effect diagram is also called a fishbone diagram, for its shape, or an Ishikawa diagram, after its creator Kaoru Ishikawa.
2. What is the purpose of grouping causes into standard categories such as Man, Machine, Method, Material, and Measurement on a fishbone diagram?
To force a team past the first obvious cause and into a genuinely wide search across categories
To eliminate the need for any data collection
To calculate a Risk Priority Number
To make the diagram look more complex than it is
Answer: a. Standard categories force a team past the first, most obvious cause and into a genuinely wide search across every category before jumping to conclusions.
3. What does SIPOC stand for?
Standard, Inspect, Prioritize, Order, Complete
Suppliers, Inputs, Process, Outputs, Customers
Severity, Impact, Process, Occurrence, Cause
Sort, Inventory, Process, Order, Control
Answer: b. SIPOC stands for Suppliers, Inputs, Process, Outputs, Customers, a high-level process map.
4. Why is a SIPOC typically built early in a project, before detailed data collection begins?
It is a required legal and regulatory document that must be filed before any project can begin
It sets a shared boundary for the process, and disputes over it are cheaper to settle early
It replaces the need for a project charter
It calculates the exact financial savings of the project
Answer: b. A SIPOC establishes a shared boundary for what the process is early on, since disagreements about where a process starts and ends are far cheaper to resolve before weeks of data collection.
5. What does a Value Stream Map show that a basic SIPOC does not?
Only the names of the suppliers involved
The Risk Priority Number of each process step, built from severity, occurrence, and detection ratings
Nothing; the two tools show identical information at the same level of detail
Material and information flow step by step, with step times and value-added classification
Answer: d. A Value Stream Map shows detailed material and information flow, step by step, with actual step times, and classifies each step as value-added or non-value-added.
6. What is the relationship between a current-state VSM and a future-state VSM?
The current-state VSM shows today's process, and the gap to the future-state VSM is the roadmap
Only the current-state VSM is ever needed for a Yellow Belt project
They are unrelated documents used on separate projects
The future-state VSM is built first, and the current-state VSM is then derived from it by adding back the waste
Answer: a. The current-state VSM documents the process as it actually runs today, including its waste, while the future-state VSM depicts the target process; the gap between them is the improvement roadmap.
7. What is the purpose of an X-Y diagram, also called a cause and effect matrix?
To document the five 5S steps
To rank many potential inputs by their rated effect on customer outputs
To calculate the cost of poor quality
To replace the need for a fishbone diagram and any later data collection entirely
Answer: b. An X-Y diagram rates how strongly each potential input, or X, is believed to affect the outputs, or Y's, that matter to the customer, producing a ranked list to prioritize investigation.
8. What does FMEA stand for?
Failure Modes and Effects Analysis
Formal Metrics and Evaluation Analysis
Financial Measurement and Evaluation Approach
Fishbone Method for Effect Analysis
Answer: a. FMEA stands for Failure Modes and Effects Analysis, a structured tool for anticipating how a process could fail before it does.
9. In FMEA, how is a Risk Priority Number (RPN) calculated?
By dividing Cost of Poor Quality by the number of failure modes
By averaging Severity and Occurrence only
By multiplying Severity, Occurrence, and Detection ratings together
By adding the number of process steps to the defect count
Answer: c. RPN is calculated by multiplying the Severity, Occurrence, and Detection ratings together for each failure mode.
10. Can a moderately severe failure mode that happens often and is hard to detect outrank a catastrophic failure mode that almost never happens and is always caught?
Yes, because RPN combines Severity, Occurrence, and Detection
No, Severity always determines the ranking by itself
No, FMEA ranks failure modes only by how catastrophic their effects would be
Yes, but only if the process has no Measurement System Analysis
Answer: a. Because RPN multiplies Severity, Occurrence, and Detection together, a moderately severe but frequent and hard-to-detect failure can produce a higher RPN than a catastrophic but rare, always-caught failure.
11. A GCHS team wants to establish, before collecting any data, the high-level boundary of a work-order process: who supplies requests, what the process turns them into, and who receives the output. Which tool should they build first?
X-Y diagram
FMEA
SIPOC
Value Stream Map
Answer: c. SIPOC is typically the first mapping tool used on a new project, establishing a shared, high-level boundary before anyone drills into detail.
12. On a rehab project's value stream map, a step where materials sit at the job site for two days waiting on a subcontractor's schedule is classified as what?
A CTQ
A control limit
Value-added, because the customer is ultimately paying for the finished home
Non-value-added, since the homeowner would not knowingly pay for it
Answer: d. On a value stream map, every step is classified as value-added or non-value-added; idle waiting time is something the customer would not knowingly pay for, so it is non-value-added.
13. In FMEA, "Detection" refers to what?
How likely the cause of a failure is to occur
The total number of failure modes the team identifies on a single process step
How likely a failure is to be caught before it reaches the customer
How serious a failure's effect would be
Answer: c. Detection is how likely the failure is to be caught before it reaches the customer, one of the three factors, along with Severity and Occurrence, multiplied together for the RPN.
14. A GCHS team investigating why finished punch-list items keep needing rework builds a fishbone diagram and lists "crew fatigue after long overtime shifts" as a possible cause. Under which of the 6M categories does this fall?
Mother Nature
Method
Machine
Man
Answer: d. "Man" is the fishbone category for people-related causes, such as a crew member's fatigue or training, as distinct from Method, Machine, Material, Measurement, or Mother Nature (environment).
Glossary
Fishbone (Ishikawa) Diagram
A structured brainstorming tool for organizing possible causes of a specific effect, grouped into categories such as the 6 Ms.
SIPOC
A high-level process map standing for Suppliers, Inputs, Process, Outputs, Customers.
Value Stream Map (VSM)
A detailed map of material and information flow through a process, with step times, classifying each step as value-added or non-value-added.
X-Y Diagram
A cause and effect matrix that rates and ranks potential input variables (X's) against the outputs (Y's) that matter to the customer.
FMEA (Failure Modes and Effects Analysis)
A structured tool for anticipating how a process could fail, rating each failure mode by Severity, Occurrence, and Detection.
Risk Priority Number (RPN)
The product of a failure mode's Severity, Occurrence, and Detection ratings, used to prioritize preventive action.
Value-Added Activity
A process step the customer would knowingly pay for, as distinguished from non-value-added waste.