Lesson 6: Basic statistics, the normal distribution, and graphical analysis
IASSC Body of Knowledge 2.2, Six Sigma Statistics · 14 practice questions
0:00 / --:--
Reading
Once a process is mapped, the Measure phase turns to actually quantifying
how it performs. This lesson covers the statistical foundation every later
lesson in this course builds on: the basic descriptive statistics, the
normal distribution, and the graphical tools used to see a process's
behavior rather than just calculate it.
The empirical rule for a normal distribution: about 68 percent of values fall within ±1 standard deviation of the mean, about 95 percent within ±2, and about 99.7 percent within ±3.
Basic and descriptive statistics
Descriptive statistics summarize a data set using a small number of
values instead of forcing a reader to look at every individual data point.
They split into two families: measures of central tendency,
which describe where the middle of the data sits, and measures of
dispersion, which describe how spread out the data is.
The three common measures of central tendency are the mean
(the arithmetic average, the sum of all values divided by the count),
the median (the middle value when all data points are
sorted, less sensitive than the mean to extreme outliers), and the
mode (the value that occurs most frequently).
The common measures of dispersion are the range (the
highest value minus the lowest value, simple but very sensitive to a single
outlier), the variance (roughly the average of the squared
differences between each data point and the mean, where the sample version divides by n minus 1 rather than n, which weights larger
deviations more heavily), and the standard deviation (the
square root of the variance, which returns the spread to the data's original
units and is the most commonly reported measure of dispersion in Six
Sigma work, usually denoted with the Greek letter sigma). Two data sets can
have the identical mean and tell completely different stories once their
standard deviations are compared: one tightly clustered around the average,
the other wildly inconsistent.
Normal distributions and normality
The normal distribution is a specific, symmetric, bell-shaped probability
distribution that shows up constantly in natural and process data, where the
mean, median, and mode all fall at the same central point and data becomes
progressively less common the further it sits from that center in either
direction. A process whose output follows a normal distribution is
predictable in a specific, useful way, known as the empirical rule: roughly
68 percent of output falls within one standard deviation of the mean,
roughly 95 percent within two standard deviations, and roughly 99.7 percent
within three standard deviations. This predictability is the foundation
underneath process capability calculations, covered in Lesson 8, and
underneath the hypothesis tests Green Belts use, covered later in this
program. Not every process is normally distributed, and checking whether
data is approximately normal, called a normality check, is a routine early
step before applying tools that assume it.
Graphical analysis
Before running any statistical test, an experienced practitioner looks at
the data. A handful of simple charts reveal patterns that a table of numbers
alone hides:
Histogram: bars showing how many data points fall into
each of a series of value ranges, the standard way to see a distribution's
overall shape, including whether it looks roughly normal, skewed, or has
more than one peak.
Box plot: a compact summary showing the median, the
middle 50 percent of the data (the box itself), and the overall spread,
including individual outlier points plotted separately, useful for comparing
several groups side by side at a glance.
Scatter plot: individual points plotted against two
variables at once, the standard way to visually check whether a relationship
exists between an X and a Y before running a formal regression, covered
later at the Green Belt level.
Run chart: individual data points plotted in the order
they occurred over time, the simplest way to spot a trend, a shift, or a
cycle that a simple average would completely hide.
A team that jumps straight to a statistical test without first looking at
a histogram or a run chart risks missing something a five-second glance
would have caught, such as an obvious shift partway through the data or a
handful of extreme outliers distorting the average.
Measures of shape: skewness and kurtosis
Central tendency and dispersion describe the middle and the spread of a
data set, but they say nothing about its shape. A third family of
descriptive statistics, measures of shape, describes how symmetric or
lopsided a distribution is. Skewness measures that
asymmetry. A distribution with a long tail stretching toward higher values
is positively skewed, or right-skewed; its mean is pulled above its median
by the small number of unusually high values in that tail. A distribution
with a long tail stretching toward lower values is negatively skewed, or
left-skewed, with the mean pulled below the median instead. A perfectly
symmetric distribution has zero skew, and for the normal distribution
the mean, median, and mode all coincide. Housing rehab data is often
right-skewed in practice: most work orders close out in a predictable
handful of days, but a small number run far longer because of a permit
delay or a supply backorder, and that long tail pulls the average
completion time higher than the typical, median job.
Kurtosis measures how heavy a distribution's tails are
compared with the normal distribution, whose excess kurtosis is
defined as zero. A distribution with excess kurtosis above zero, called
leptokurtic, has heavier tails than normal, meaning more
frequent extreme values than the normal distribution would predict, and is
often drawn with a sharper peak as well. A
distribution with excess kurtosis below zero, called platykurtic, has
thinner tails, with fewer extreme values, and is often drawn with a flatter top. Both skewness
and kurtosis are typically checked, along with a histogram, as part of the
normality check described above, before applying a tool that assumes
normally distributed data.
Practice questions
1. Descriptive statistics split into which two families?
Value-added and non-value-added, the two categories of process steps in Lean
Measures of central tendency and measures of dispersion
Internal failure and external failure
Hard savings and soft savings
Answer: b. Descriptive statistics split into measures of central tendency, describing where the middle of the data sits, and measures of dispersion, describing how spread out the data is.
2. Which measure of central tendency is least sensitive to extreme outliers?
The standard deviation
The mean
The median
The range
Answer: c. The median, the middle value when data is sorted, is less sensitive to extreme outliers than the mean, which is pulled by every value including outliers.
3. What is the standard deviation?
The value that occurs most frequently in a data set
The sum of all values divided by the count
The square root of the variance, returning the spread to the data's original units
The highest value minus the lowest value, a simple measure of spread that ignores every other point
Answer: c. Standard deviation is the square root of the variance, which returns the spread of the data to its original units, and is the most commonly reported measure of dispersion in Six Sigma.
4. Two data sets have the identical mean. What can standard deviation reveal that the mean alone cannot?
Nothing; identical means always mean identical distributions
The exact number of defects in each data set
Which data set has a higher DPMO
That one data set may be tightly clustered around the average while the other is wildly inconsistent
Answer: d. Two data sets can share an identical mean and still tell very different stories once their standard deviations are compared, one tightly clustered, the other widely dispersed.
5. In a normal distribution, where do the mean, median, and mode fall relative to each other?
A normal distribution has no defined mean
They are always spread far apart
They all fall at the same central point
The mode is always higher than the mean
Answer: c. In a normal distribution, the mean, median, and mode all fall at the same central point, and data becomes progressively less common further from that center.
6. Under the empirical rule for a normal distribution, approximately what percentage of output falls within two standard deviations of the mean?
Roughly 95 percent
Roughly 99.7 percent
Roughly 50 percent
Roughly 68 percent
Answer: a. Under the empirical rule, roughly 95 percent of output falls within two standard deviations of the mean in a normal distribution.
7. Why does it matter whether a process's data is approximately normally distributed?
Because non-normal data cannot be graphed
Because only normal data can have a calculated mean, and every other data set must be discarded first
Because normality has no practical effect on any Six Sigma tool
Because capability calculations and many tests assume normality, and non-normal data can mislead them
Answer: d. Process capability calculations and many statistical tests assume normally distributed data, so checking normality is a routine early step before applying tools built on that assumption.
8. Which chart is the standard way to see a distribution's overall shape, including whether it looks roughly normal or skewed?
Run chart
Histogram
SIPOC diagram
Fishbone diagram
Answer: b. A histogram shows how many data points fall into each value range, the standard way to see a distribution's overall shape.
9. What does a run chart show that a simple average would completely hide?
The relationship between two unrelated categorical variables
The exact standard deviation of a data set
The Risk Priority Number of a failure mode
A trend, shift, or cycle occurring over time
Answer: d. A run chart plots individual data points in the order they occurred, the simplest way to spot a trend, shift, or cycle that an average alone would hide.
10. What risk does a team take by running a statistical test without first looking at a histogram or run chart of the data?
Automatically failing the project's financial evaluation
Missing something a quick visual check would have caught, such as an obvious shift or extreme outliers distorting the average
No risk; graphical analysis is purely optional decoration
Accidentally calculating a lower Cost of Poor Quality
Answer: b. Jumping straight to a statistical test risks missing something a five-second visual check would have caught, such as a shift partway through the data or outliers distorting the average.
11. GCHS tracked punch-list closeout times, in days, for five recently completed rehab homes: 3, 4, 4, 5, 9. What is the mean closeout time?
9 days
5 days
4 days
4.5 days
Answer: b. The mean is the sum of the values divided by the count: (3+4+4+5+9) / 5 = 25 / 5 = 5 days.
12. GCHS's work-order completion times are mostly clustered around 5 to 7 days, but a handful of jobs delayed by permit issues take 30 days or more, stretching the distribution's right tail. How would this distribution's skewness best be described?
Positively skewed, with the mean pulled above the median by the long right tail
Perfectly symmetric, with zero skew, since typical jobs cluster tightly around 5 to 7 days
Negatively skewed, with the mean pulled below the median
Undefined, since skewness cannot be calculated for time data
Answer: a. A long tail stretching toward higher values is positive, or right, skew; the small number of unusually long jobs pulls the mean above the typical, median completion time.
13. A distribution's mean is noticeably lower than its median, with a long tail extending toward the low end of the scale. How would this distribution's skewness best be described?
Negatively skewed, with the mean pulled below the median by the long left tail
Positively skewed, with the mean pulled above the median by a long tail toward the high end
Zero skew
This pattern is impossible in real data
Answer: a. A long tail stretching toward lower values is negative, or left, skew, which pulls the mean below the median.
14. A data set has excess kurtosis well above zero, compared with the normal distribution's baseline of zero. What does this indicate about the data?
The data has no measurable standard deviation
The data is guaranteed to be normally distributed
The distribution is leptokurtic, with heavier tails, meaning more frequent extreme values than a normal distribution would predict
The mean and median must be exactly equal
Answer: c. Excess kurtosis above zero describes a leptokurtic distribution, with heavier tails than the normal distribution, meaning more frequent extreme values.
Glossary
Mean
The arithmetic average of a data set, the sum of all values divided by the count.
Median
The middle value of a data set when all points are sorted from lowest to highest.
Mode
The value that occurs most frequently in a data set.
Standard deviation
The square root of the variance, expressing spread in the data's original units.
Normal distribution
A symmetric, bell-shaped distribution in which the mean, median, and mode coincide.
Empirical rule
The rule that roughly 68, 95, and 99.7 percent of a normal distribution's values fall within one, two, and three standard deviations of the mean.
Skewness
A measure of a distribution's asymmetry, describing which direction its longer tail stretches.
Kurtosis
A measure of how heavy a distribution's tails are compared with the normal distribution, showing up as more or fewer extreme values.