Lesson 7: Trusting the measurement (Measurement System Analysis and Gage R&R)
IASSC Body of Knowledge 2.3, Measurement System Analysis · 14 practice questions
0:00 / --:--
Reading
Every conclusion a Six Sigma project draws rests on measured data. If the
measurement system producing that data cannot be trusted, nothing built on
top of it can be trusted either, no matter how sophisticated the analysis
gets later. Measurement System Analysis, MSA, is the discipline of verifying
that a measurement system itself is fit for purpose before the data it
produces is used to make decisions.
Accuracy is how close a measurement is to the true value; precision is how tightly repeated measurements cluster. A measurement system can fail either one independently, which is why Gage R&R checks repeatability and reproducibility separately from bias.
Precision and accuracy
These two words are used casually as synonyms in everyday speech but mean
different things in MSA. Accuracy is how close a
measurement is to the true, correct value. Precision is
how close repeated measurements of the same thing are to each other,
regardless of whether they are close to the true value. A measurement
system can be precise but inaccurate, consistently returning the same wrong
number, or accurate but imprecise, averaging out to the right number while
individual readings scatter widely. A useful measurement system needs both.
Bias, linearity, and stability
Three specific properties of a measurement system are evaluated
separately:
Bias: the difference between the average of repeated
measurements and the item's known, true, or reference value. A gage that
consistently reads 2 grams heavy on a known 100-gram reference weight has a
bias of 2 grams.
Linearity: whether that bias stays consistent across
the full range the gage is used over. A gage that is accurate at the low
end of its range but increasingly biased at the high end has a linearity
problem, and a single bias check at one point on the scale would miss it
entirely.
Stability: whether the gage's bias and variation stay
constant over time, checked by periodically re-measuring the same reference
item and watching for drift. A gage that was accurate when it was calibrated
six months ago but has since drifted has a stability problem, which is why
gages are recalibrated on a schedule rather than checked once and trusted
indefinitely.
Gage Repeatability and Reproducibility (Gage R&R)
A Gage R&R study is the standard method for quantifying how much of a
measurement system's total observed variation comes from the measurement
system itself, as opposed to genuine variation in the parts being measured.
It separates measurement variation into two components:
Repeatability, sometimes called equipment variation:
the variation seen when the same appraiser measures the same part multiple
times with the same gage. High repeatability variation points to a problem
with the equipment itself.
Reproducibility, sometimes called appraiser variation:
the variation seen when different appraisers measure the same part with the
same gage. High reproducibility variation points to a problem with how the
measurement procedure is being applied, such as unclear instructions or
inconsistent technique between operators, rather than the equipment.
A typical Gage R&R study has several appraisers each measure the same
set of parts multiple times, in random order, without knowing which part
they measured before, and the results are analyzed to see what percentage
of the total observed variation is coming from the measurement system
rather than from real part-to-part differences. If the measurement system
itself is consuming a large share of the total variation, any conclusion
drawn later from that data is suspect, because the team cannot tell how much
of what it is seeing is the process and how much is just measurement noise.
The reading separates measurement variation within an appraiser from variation between appraisers. Both use the same part and gage.
Variable and attribute MSA
The Gage R&R study described above is the standard approach for
variable data, continuous measurements such as length,
weight, or time, where the output is a number on a scale. For
attribute data, discrete pass or fail, go or no-go, or
categorical judgments, a different method is used, generally called
attribute agreement analysis. Multiple appraisers classify the same set of
items more than once, and the analysis checks how often each appraiser
agrees with themselves across repeated trials, how often different
appraisers agree with each other, and how often the appraisers, individually
and collectively, agree with a known correct answer. A visual inspection
process that different inspectors classify inconsistently has an attribute
measurement system problem in exactly the same sense that an inconsistent
gage does for variable data, and needs the same kind of fix: clearer
standards, better training, or a better inspection method.
Reading and judging a %GRR result
A Gage R&R study's output is usually reported as %GRR,
the measurement system's variation expressed as a percentage of the total
observed variation (commonly calculated as %Study Variation, the Gage R&R
standard deviation divided by the total standard deviation, times 100).
Under widely used AIAG guidelines, a %GRR under 10 percent is generally
considered an acceptable measurement system. A %GRR between 10 and 30
percent may be acceptable depending on the application, the importance of
the measurement, the cost of the gage, and the cost of repair, and usually
calls for a judgment call rather than an automatic pass or fail. A %GRR over
30 percent is generally considered unacceptable, and the measurement system
needs improvement before the data it produces is trusted for decisions.
A second output, the number of distinct categories
(ndc), estimates how many truly distinguishable groups of parts the
measurement system can reliably tell apart across the range of parts
studied. A commonly used minimum is five or more distinct categories; a
measurement system below that threshold cannot reliably tell many parts
apart from each other, even if its %GRR number looks acceptable on its own,
which is why both figures are checked together rather than either one
alone.
Practice questions
1. What is the difference between accuracy and precision?
Precision measures the bias of a gage against a reference standard, while accuracy measures the repeatability of its readings
They are exact synonyms with no practical difference
Accuracy is closeness to the true value; precision is closeness of repeated measurements to each other
Accuracy applies only to attribute data, precision only to variable data
Answer: c. Accuracy is how close a measurement is to the true value; precision is how close repeated measurements of the same thing are to each other, regardless of whether they are correct.
2. A gage consistently returns the same wrong reading every time it measures a known reference part. How is this system best described?
Neither precise nor consistent
Precise but inaccurate
Both accurate and precise
Accurate but imprecise
Answer: b. A gage that consistently returns the same wrong value is precise, since repeated readings agree with each other, but inaccurate, since they are not close to the true value.
3. A gage reads 2 grams heavy every time it measures a known 100-gram reference weight. What is this property called?
Repeatability
Bias
Reproducibility
Linearity
Answer: b. Bias is the difference between the average of repeated measurements and the item's known true value; a consistent 2-gram overread is a bias of 2 grams.
4. A gage is accurate at the low end of its measurement range but increasingly biased at the high end. What property is this describing?
Repeatability
Reproducibility
Stability
Linearity
Answer: d. Linearity is whether bias stays consistent across the full range a gage is used over; a gage accurate at one end but not the other has a linearity problem.
5. Why are gages recalibrated on a schedule instead of checked once and trusted indefinitely?
Because recalibration is required only for attribute data and is never applied to gages that measure variable data
Because repeatability studies replace the need for calibration
Because bias never changes once a gage is manufactured
Because stability checks for drift in a gage's accuracy and variation over time
Answer: d. Stability is whether a gage's bias and variation stay constant over time; periodic recalibration checks for drift that a one-time check would miss.
6. What does a Gage R&R study measure overall?
How much of the total observed variation comes from the measurement system itself, versus genuine part-to-part variation
The Risk Priority Number of a failure mode
Only the cost of the measurement equipment
The number of defects per million opportunities
Answer: a. A Gage R&R study quantifies how much of the total observed variation comes from the measurement system itself, as opposed to real variation between the parts being measured.
7. In Gage R&R, what does "repeatability" refer to?
The percentage of units passing a step without rework
Variation seen when the same appraiser measures the same part multiple times with the same gage
Variation seen when different appraisers each measure different parts, using different gages, on different days
The difference between a measurement and its known true value
Answer: b. Repeatability, or equipment variation, is the variation seen when the same appraiser measures the same part multiple times with the same gage.
8. High reproducibility variation in a Gage R&R study most likely points to what kind of problem?
A problem that cannot be diagnosed by MSA
A problem with the reference standard's true value
A problem with how the procedure is applied between appraisers, such as unclear instructions or inconsistent technique
A problem with the gage's internal mechanics only, such as a worn sensor, a loose fixture, or a fault inside the instrument itself
Answer: c. High reproducibility variation, differences between appraisers measuring the same part with the same gage, points to a procedural problem, such as unclear instructions or inconsistent technique, rather than the equipment itself.
9. What kind of data does a standard Gage R&R study apply to?
Variable, continuous data such as length, weight, or time
Only financial data, such as the dollar savings figures used in benefits capture on a project
Only data collected during the Control phase
Attribute, pass or fail data only
Answer: a. A standard Gage R&R study applies to variable data, continuous measurements such as length, weight, or time, where the output is a number on a scale.
10. For discrete pass or fail, go or no-go judgments, which method is used instead of a standard Gage R&R study?
Rolled Throughput Yield calculation
A cause and effect matrix
Attribute agreement analysis, checking agreement within and between appraisers and against a known correct answer
A value stream map
Answer: c. Attribute agreement analysis is used for discrete data, checking how often appraisers agree with themselves, with each other, and with a known correct answer.
11. GCHS uses a laser distance meter to verify wheelchair ramp lengths before final inspection sign-off. A Gage R&R study finds a total standard deviation of 0.40 inches and a Gage R&R (measurement system) standard deviation of 0.06 inches. What is the %GRR, and how should it be judged under common AIAG guidelines?
15 percent, which may be acceptable depending on application, gage cost, and cost of repair
6 percent, an acceptable measurement system because the gage variation is far below the 0.40 inch total
24 percent, an unacceptable measurement system
66 percent, an unacceptable measurement system
Answer: a. %GRR = 0.06 / 0.40 = 0.15, or 15 percent. Under common AIAG guidelines, 10 to 30 percent falls in the range that may be acceptable depending on the application, rather than an automatic pass or fail.
12. In a Gage R&R analysis, what does the number of distinct categories (ndc) estimate, and what is the commonly used minimum for a capable measurement system?
The minimum number of appraisers required, generally two
The minimum number of times each part must be measured, generally ten
The minimum number of reference standards needed, generally three
The number of truly distinguishable groups of parts the system can tell apart, with a commonly used minimum of five
Answer: d. The number of distinct categories estimates how many truly distinguishable groups of parts the measurement system can reliably tell apart; a commonly used minimum is five or more.
13. Under common AIAG guidelines for %GRR, which range is generally considered unacceptable?
Exactly 10 percent
Under 10 percent
Over 30 percent
Between 10 and 20 percent
Answer: c. A %GRR over 30 percent is generally considered unacceptable; under 10 percent is generally acceptable, and 10 to 30 percent may be acceptable depending on the application.
14. In a Gage R&R study, why do appraisers measure the sample parts in random order without being told which part they measured previously?
Because random order is a requirement only for attribute agreement analysis and is never used in a Gage R&R study, where parts are always measured in sequence
To prevent an appraiser from unintentionally biasing a reading by recalling or matching a previous measurement of the same part
To reduce the number of appraisers needed for a valid study
To make the study take less time overall
Answer: b. Randomizing the order and blinding appraisers to which part they measured before keeps each measurement independent, preventing an appraiser from unintentionally matching a remembered prior reading.
Glossary
Accuracy
How close a measurement is to the true, correct value.
Precision
How close repeated measurements of the same thing are to each other, regardless of whether they are close to the true value.
Bias
The difference between the average of repeated measurements and the item's known, true, or reference value.
Repeatability
The variation seen when the same appraiser measures the same part multiple times with the same gage.
Reproducibility
The variation seen when different appraisers measure the same part with the same gage.
%GRR
The measurement system's variation expressed as a percentage of the total observed variation.
Number of distinct categories (ndc)
An estimate of how many truly distinguishable groups of parts a measurement system can reliably tell apart.
Attribute agreement analysis
The MSA method used for discrete pass or fail or categorical judgments, in place of a variable Gage R&R study.