Lesson 8: Process capability (Cp, Cpk, and knowing whether a process can meet spec)
IASSC Body of Knowledge 2.4, Process Capability · 14 practice questions
0:00 / --:--
Reading
This lesson closes out the Measure phase material. Once a measurement
system is trustworthy, the next question is whether the process itself is
actually capable of meeting the customer's requirement, expressed as a
specification. Process capability analysis answers that question with
numbers instead of impressions.
Two processes against the same spec limits (LSL, USL). The narrow, centered distribution is capable and has a high Cpk; the wider distribution crowding the upper spec limit is not capable, even at the same average.
The prerequisite: a stable process
Process capability can only be calculated meaningfully on a process that
is in a state of statistical control, meaning its variation is stable and
predictable over time, with no unexplained shifts, trends, or unusual
points. A process that is not stable does not have one consistent capability
to measure; it has a moving target. This is why capability studies are
always paired with a check for stability, typically a control chart, covered
in Lesson 9 and expanded further at the Green Belt level, before any
capability number is trusted. Calculating Cpk on an unstable process
produces a number that looks precise and means very little.
Capability analysis: Cp and Cpk
Once stability is confirmed, capability compares the process's natural
spread against the customer's specification limits, the Upper Specification
Limit (USL) and Lower Specification Limit (LSL). Two indices are commonly
used:
Cp compares how wide the specification window is
against how wide the process actually spreads, using six standard
deviations as the process spread. It answers "could this process fit inside
the spec, if it were perfectly centered," but it ignores where the process
is actually centered.
Cpk answers the more useful, real-world question: how
capable is this process right now, including wherever it is actually
centered. Cpk looks at the distance from the process mean to the nearer of
the two specification limits, so a process that is perfectly narrow but
badly off-center gets a poor Cpk score even though its Cp might look
excellent.
A process can have a good Cp and a poor Cpk at the same time. That
combination is a specific, useful diagnosis: the process is not too
variable, it is simply aimed at the wrong target, which is usually a
cheaper and faster problem to fix than reducing variation would be. A
process with a poor Cp has the opposite problem: even perfectly centered,
it is too inconsistent to reliably fit inside the specification, which
typically requires a deeper Analyze-phase investigation into root causes of
variation rather than a simple re-centering adjustment.
Attribute and discrete capability
Cp and Cpk are built for continuous, variable data measured against
numeric specification limits. For attribute or discrete data, pass or fail,
defective or not defective, there is no continuous spread to compare
against a spec width in the same way. Capability for this kind of data is
instead expressed directly in terms of the defect rate itself: percent
defective, DPU, or DPMO, the metrics covered back in Lesson 2, translated
if needed into an equivalent sigma level. A process is described as capable
in attribute terms when its defect rate meets the target the customer or
the business has set, rather than by a Cp or Cpk number.
Monitoring techniques
A capability study is a snapshot, not a guarantee. A process confirmed
capable today can drift out of capability later if nothing keeps watching
it, which is exactly the failure mode the Control phase, and specifically
the control charts covered starting in the next lesson, exist to prevent.
Ongoing monitoring compares new data against the capability baseline
established during the study, and flags the process for investigation the
moment its behavior starts to look different from the state it was
originally measured in, rather than waiting for a customer complaint or a
failed batch to reveal the drift after the fact.
Why this matters
Cp only describes spread against the spec width. Cpk also accounts for centering, which is why a process can have a good Cp and still be failing because it drifted toward one spec limit.
A worked Cp/Cpk example, and Pp/Ppk
Suppose a spec calls for a part dimension between a Lower Specification
Limit of 9.50 and an Upper Specification Limit of 10.50 (LSL = 9.50,
USL = 10.50), and a stable process is measured with a mean of 10.10 and a
standard deviation (σ) of 0.15. Cp = (USL - LSL) / 6σ =
(10.50 - 9.50) / (6 × 0.15) = 1.00 / 0.90 = 1.11. Cpk = the smaller of
(USL - mean) / 3σ and (mean - LSL) / 3σ = the smaller of
(10.50 - 10.10) / 0.45 = 0.89 and (10.10 - 9.50) / 0.45 = 1.33, so
Cpk = 0.89. Cp (1.11) looks acceptable, but Cpk (0.89) is noticeably lower,
telling the team the process spread itself is fine but it is running closer
to the upper limit than it should.
A related pair of indices, Pp and Ppk, are calculated
with the exact same formulas as Cp and Cpk but use the overall, long-term
sample standard deviation of all the collected data rather than the
short-term, within-subgroup sigma that Cp and Cpk assume. Cp and Cpk
describe a process's potential capability assuming it stays as stable as it
was when sampled; Pp and Ppk describe its actual, overall performance
capability, including any shifts or drift that crept in between subgroups
over the full study period. When a process is genuinely stable, Cp and Pp,
and Cpk and Ppk, come out close to each other; a noticeable gap between them
is itself a sign that the process is not as stable as it first appeared.
Practice questions
1. Why must a process be in a state of statistical control before its capability is calculated?
Statistical control is not actually required for capability studies
Because Cp and Cpk can only be calculated for attribute data
An unstable process does not have one consistent capability; it has a moving target, so the resulting number means little
Because capability studies are only used during the Define phase
Answer: c. A process that is not stable does not have one consistent capability to measure; it has a moving target, so calculating Cpk on it produces a number that looks precise but means very little.
2. What question does Cp answer?
Whether the measurement system itself is trustworthy
How capable the process is right now, including wherever it is actually centered and how far it drifts over the long term
Whether the process could fit inside the spec if perfectly centered, ignoring actual centering
How many defects were found per million opportunities
Answer: c. Cp compares the specification width against the process's natural spread, answering whether the process could fit inside spec if perfectly centered, without accounting for actual centering.
3. What does Cpk account for that Cp does not?
The seven elements of Lean waste, including overproduction, waiting, and unnecessary motion
Where the process is actually centered relative to the specification limits
The cost of poor quality
The number of appraisers used in a Gage R&R study
Answer: b. Cpk looks at the distance from the process mean to the nearer specification limit, accounting for where the process is actually centered, which Cp ignores.
4. A process has a good Cp but a poor Cpk. What does this combination most likely indicate?
The specification limits were set incorrectly, too tight for what the customer actually requires of the product
The process is not too variable, but it is aimed at the wrong target, off-center from the spec
The measurement system is completely untrustworthy
The process has too many defect opportunities per unit
Answer: b. A good Cp with a poor Cpk indicates the process is not too variable but is off-center, aimed at the wrong target, usually a cheaper and faster fix than reducing variation.
5. A process has a poor Cp. What does this typically indicate about the fix needed?
The process needs no further investigation
The problem is guaranteed to be a measurement system issue, not the process itself
A simple re-centering adjustment will fully resolve it
Even perfectly centered, the process is too inconsistent to reliably fit the specification, requiring deeper investigation into root causes of variation
Answer: d. A poor Cp means the process is too inconsistent to reliably fit the specification even if perfectly centered, which typically requires deeper Analyze-phase investigation into root causes of variation.
6. Cp and Cpk are built for which kind of data?
Continuous, variable data measured against numeric specification limits
Only data collected during a Gage R&R study, where appraisers measure the same parts repeatedly
Attribute data only
Categorical survey responses only
Answer: a. Cp and Cpk are built for continuous, variable data measured against numeric upper and lower specification limits.
7. How is capability typically expressed for attribute or discrete data, such as pass or fail results?
Only through a Gage R&R study
Directly in terms of the defect rate itself, such as percent defective, DPU, or DPMO
Using Cp and Cpk exactly as calculated for continuous data, with pass or fail counts standing in for the mean
It cannot be expressed at all for discrete data
Answer: b. For attribute or discrete data, capability is expressed directly in terms of the defect rate, such as percent defective, DPU, or DPMO, rather than Cp or Cpk.
8. What is a capability study best described as?
A snapshot in time, not a guarantee the process will stay capable indefinitely
A replacement for a Gage R&R study
A tool used only in the Define phase
A permanent guarantee that a process will never change or drift once its Cpk has been calculated and reported
Answer: a. A capability study is a snapshot, not a guarantee; a process confirmed capable today can drift out of capability later if nothing keeps monitoring it.
9. What is the purpose of ongoing monitoring after a capability study is complete?
To replace the need for a control plan
To eliminate the seven wastes automatically
To compare new data against the capability baseline and flag the process as soon as its behavior looks different
To recalculate the original project's financial benefits each quarter and report them to the sponsor and the finance team
Answer: c. Ongoing monitoring compares new data against the capability baseline and flags the process for investigation as soon as it starts behaving differently, rather than waiting for a complaint or a failed batch.
10. Which tool, expanded on starting in the next lesson, is typically used to check whether a process remains stable over time?
SIPOC diagrams
Project charters
Pareto charts
Control charts
Answer: d. Control charts are the standard tool used to check whether a process remains stable over time, introduced as part of Lean controls in Lesson 9.
11. GCHS inspects accessibility handrails against a height requirement of 34 to 38 inches (LSL = 34, USL = 38). A capability study on recently installed handrails finds a mean of 37.0 inches and a standard deviation of 0.5 inches. What is Cpk?
0.44
0.67
1.33
2.00
Answer: b. Cpk is the smaller of (USL - mean)/3σ and (mean - LSL)/3σ: (38-37)/1.5 = 0.67 and (37-34)/1.5 = 2.00. The smaller value, 0.67, is Cpk, showing the handrails are running close to the upper spec limit.
12. Which formula correctly calculates Cpk?
The smaller of (USL - mean) / 3σ and (mean - LSL) / 3σ
(USL - LSL) / 6σ, the spec width divided by the process spread
(mean - LSL) / 6σ
(USL - LSL) / σ
Answer: a. Cpk takes the smaller of the distance from the process mean to each specification limit, each divided by 3σ, so it reflects both spread and centering. (USL - LSL) / 6σ is the formula for Cp instead.
13. What is the key difference between Cpk and Ppk?
There is no real difference between the two indices
Ppk can only be calculated for attribute, pass or fail data
Cpk uses the short-term, within-subgroup sigma of a stable process; Ppk uses the overall, long-term sample standard deviation of all the data collected
Ppk uses short-term sigma and Cpk uses overall long-term sigma, the reverse
Answer: c. Cpk assumes the short-term, within-subgroup sigma of a stable process; Ppk uses the overall, long-term sample standard deviation of all the data, capturing any drift that occurred during the study.
14. Using the worked example in this lesson (LSL = 9.50, USL = 10.50, process mean = 10.10, σ = 0.15), what is Cp?