Lesson 7: Alarms, signage, and units for hearing and vision impairments
UFAS 4.28, 4.30, 4.34 · 14 practice questions
0:00 / --:--
Reading
This lesson turns to two building elements that matter most to residents
who are deaf, hard of hearing, blind, or have low vision: alarms and
signage, covered in UFAS Sections 4.28 and 4.30. It also covers the
provisions inside Section 4.34 that carry hearing- and vision-impairment
features into dwelling units, and the HUD scoping rule, 24 CFR 8.22,
setting how many units in a HUD-funded housing project need those
features at all. None of this is optional detail on a GCHS project: an
alarm a resident cannot hear or see, or a sign a caseworker cannot read
by touch, fails the person it was built for exactly when it matters most.
Audible alarms: how loud is loud enough (4.28.2)
Section 4.28.2 does not just say an alarm must be audible; it sets a
measurable threshold. Where an audible emergency alarm is provided, it
must produce a sound that exceeds the prevailing equivalent sound level
in the room or space by at least 15 decibels, or that exceeds any
maximum sound level with a duration of 30 seconds by 5 decibels,
whichever is louder. Sound levels for alarm signals may not exceed 120
decibels. In practice this means an evaluator cannot sign off on an
alarm just because it makes noise; the noise has to clear the ambient
sound in that specific space by a defined margin, and it has to stay
under the ceiling that would make the alarm itself a hazard.
Visual alarms: flashing frequency and exceptions (4.28.3)
Section 4.28.3 requires that, where provided, electrically powered,
internally illuminated emergency exit signs flash as a visual emergency
alarm in conjunction with the audible alarm. The flashing frequency of a
visual alarm device must be less than 5 Hz, a ceiling meant to keep the
signal from triggering photosensitive seizures. Two exceptions apply: a
visual alarm device mounted adjacent to an emergency exit sign may
substitute for a flashing exit sign, and a specialized system using
advanced technology may replace the specified visual system if it
provides equivalent protection to people with disabilities.
Auxiliary alarms in accessible sleeping accommodations (4.28.4)
Section 4.28.4 covers a narrower but very practical case: accessible
sleeping accommodations, the kind found in shelters, group homes, or
transitional housing GCHS may touch through disaster recovery work.
Each accessible sleeping accommodation must have a visual alarm
connected to the building's emergency alarm system, or a standard
110-volt electrical receptacle into which such an alarm could be
connected. Either way, instructions for use of the auxiliary alarm or
connection must be provided. A hardwired connection is not the only compliant
answer; a properly located outlet and clear instructions satisfy the
requirement too.
Signage: legibility, contrast, and the accessibility symbol (4.30.2 to 4.30.5)
Section 4.30.2 requires letters and numbers on required signage to
keep a width-to-height ratio between 3:5 and 1:1, with a stroke
width-to-height ratio between 1:5 and 1:10. Section 4.30.3 requires
characters and symbols to contrast with their background, either light
on dark or dark on light. Section 4.30.4 covers raised characters for
tactile reading: raised at least 1/32 inch, sans serif, at least 5/8
inch high but no higher than 2 inches; raised symbols follow the same
1/32-inch minimum. Section 4.30.5 requires accessible facilities that
Section 4.1 says must be identified to use the International Symbol of
Accessibility, displayed as shown in Figure 43. The contrast rule in
Section 4.30.3 covers symbols as well as characters, so it applies to
the symbol too.
Where a sign goes: mounting location and height (4.30.6)
Getting the words right on a sign does not help if nobody can find it
or reach it. Section 4.30.6 requires that interior signage be located
alongside the door on the latch side, mounted at a height of between 54
inches and 66 inches (1370 mm and 1675 mm) above the finished floor. A
sign mounted on the hinge side, or mounted outside that height band, is
a common field finding on older buildings and does not satisfy the
section even if the sign itself is otherwise correctly designed.
Hearing- and vision-impairment features inside the dwelling unit (4.34)
Section 4.34.2, the minimum requirements list for an accessible
dwelling unit, carries the alarm rule into housing directly at item
(10): emergency alarms as required by 4.1 and complying with 4.28.4 must
be provided in the dwelling unit. Section 4.34.4, consumer information,
adds the paperwork side of that same feature. For owners and occupants,
item (3) requires notification that the dwelling unit is equipped to
have a visual emergency alarm installed. For the party responsible for
adaptations, item (5) requires instructions for installing a visual
emergency alarm system, if the unit is equipped for that installation.
Read together, 4.34.2(10) and 4.34.4 mean a unit built as adaptable
rather than immediately, fully accessible still has to carry an alarm
arrangement that meets 4.28.4, either a visual alarm or a receptacle for
one, with the paper trail telling a future occupant or contractor how the
unit is equipped and how to finish the job. HUD's definition of
adaptability in 24 CFR 8.3 makes the same point: wiring for visible alarms
may be installed, with the alarms added when the unit is made ready for a
hearing-impaired occupant.
How many units: the 24 CFR 8.22 two percent rule
UFAS sets the technical design of an accessible unit; it does not say
how many units a project needs. That scoping question is HUD's, under 24
CFR 8.22. Section 8.22(a) requires new multifamily housing projects,
including public housing and Indian housing projects, to be readily
accessible to and usable by individuals with handicaps. Section 8.22(b)
sets the numbers: a minimum of 5 percent of total dwelling units, or at
least one unit, whichever is greater, must be accessible for mobility
impairments, and an additional 2 percent, but not less than one unit,
must be accessible for hearing or vision impairments. Section 8.22(c)
lets HUD require a higher percentage or number, on request from an
affected recipient or a state or local government, supported by census
or other current data showing a need. The 2 percent figure is a floor,
and a separate count from the 5 percent mobility figure, not a subset of
it.
Key numbers
4.28.2 audible alarms: exceed ambient by 15 dB, or exceed any 30-second
maximum sound level by 5 dB, whichever is louder; never exceed 120 dB.
4.28.3 visual alarms: flash rate under 5 Hz. 4.28.4 auxiliary alarms:
visual alarm tied to the building system, or a 110-volt receptacle plus
instructions. 4.30.2 character proportion: width-to-height 3:5 to 1:1,
stroke 1:5 to 1:10. 4.30.4 raised characters: 1/32 in minimum raised,
5/8 in to 2 in high. 4.30.6 mounting: latch side, 54 in to 66 in above
the floor. 24 CFR 8.22(b): 5 percent of units (min. 1) for mobility
impairments, plus an additional 2 percent (min. 1) for hearing or vision
impairments.
A sign mounted outside the 54 to 66 inch band, or on the hinge side, does not satisfy 4.30.6 even when the sign itself is correctly designed.
Why this matters for GCHS
GCHS runs into every one of these numbers on real jobs: swapping a
smoke alarm during an accessibility modification and confirming it is
still tied to a visual alarm or has a receptacle ready for one, checking
that a replacement unit sign actually sits on the latch side within the
54-to-66-inch band rather than wherever the old sign happened to be, and,
on any new-construction or substantial-rehabilitation HUD project,
working out how many units in the building need mobility features and
how many separately need hearing- or vision-impairment features under
8.22(b). Getting the 5 percent and 2 percent figures confused, or
treating them as the same pool of units, is the single most common
scoping mistake on a HUD-funded multifamily job.
Practice questions
1. Under Section 4.28.2, how loud must an audible emergency alarm be relative to ambient sound?
Exactly 10 decibels above ambient, no more and no less
Any audible sound is sufficient
Exceeding the prevailing ambient sound level by at least 15 decibels, or any 30-second maximum sound level by 5 decibels, whichever is louder, capped at 120 decibels
120 decibels minimum regardless of ambient conditions
Answer: c. Section 4.28.2 requires the alarm to exceed ambient sound by at least 15 dB, or a 30-second maximum sound level by 5 dB, whichever is louder, while never exceeding 120 dB.
2. What is the maximum flashing frequency for a visual alarm device under Section 4.28.3?
Less than 5 Hz
Less than 60 Hz
Exactly 10 Hz
There is no frequency limit
Answer: a. Section 4.28.3 caps the flashing frequency of a visual alarm device at under 5 Hz, to avoid triggering photosensitive seizures.
3. Under Section 4.28.4, what are the two acceptable ways to provide an alarm for an accessible sleeping accommodation?
Only a hardwired connection to the building alarm system is acceptable
A visual alarm connected to the building emergency alarm system, or a standard 110-volt receptacle for one, with instructions provided either way
A telephone in the room is sufficient by itself
No alarm is required in sleeping accommodations
Answer: b. Section 4.28.4 accepts either a visual alarm wired into the building system or a 110-volt receptacle for connecting one, with instructions for use provided in both cases.
4. What width-to-height and stroke ratios does Section 4.30.2 require for sign characters?
Width-to-height between 3:5 and 1:1; stroke width-to-height between 1:5 and 1:10
Width-to-height between 1:2 and 2:1, with a stroke ratio of 1:3 to 1:5 for raised characters only
Width-to-height exactly 1:1 for every character; stroke width-to-height exactly 1:10
Any ratio is acceptable as long as the sign is legible
Answer: a. Section 4.30.2 requires a width-to-height ratio between 3:5 and 1:1, with a stroke width-to-height ratio between 1:5 and 1:10.
5. Under Section 4.30.4, what is the required height range for raised characters used for tactile reading?
3 in. to 6 in. high, raised at least 1/4 in. above the sign surface
1/32 in. to 1/2 in. high, in a serif typeface for legibility
At least 5/8 in high but no higher than 2 in
Exactly 1 in high, no exceptions
Answer: c. Section 4.30.4 requires raised characters at least 5/8 in high but no higher than 2 in, raised at least 1/32 in, in a sans serif style.
6. Under Section 4.30.3, what contrast rule applies to characters and symbols on required signs, including the International Symbol of Accessibility?
The symbol must always be raised 1/32 in. and drawn in a sans serif typeface
Light characters on a dark background, or dark on a light background
No contrast requirement applies to symbols, only to letters and numbers
Only blue-and-white color schemes are acceptable on any accessible sign
Answer: b. Section 4.30.3 requires characters and symbols to contrast with their background, either light on dark or dark on light. Section 4.30.5 requires the International Symbol of Accessibility to be displayed as shown in Figure 43.
7. Under Section 4.30.6, where and at what height must interior room signage be mounted?
On the face of the door itself, at any height the installer finds convenient
Alongside the door on the hinge side, mounted at exactly 48 in. above the finished floor
Anywhere within the room, at standing eye level and within 12 in. of the door frame
Alongside the door on the latch side, 54 in. to 66 in. above the finished floor
Answer: d. Section 4.30.6 requires mounting alongside the door on the latch side, between 54 in and 66 in above the finished floor.
8. What does Section 4.34.2, item (10), require inside an accessible dwelling unit?
A telephone with a TTY jack in the living area and in each sleeping area
Emergency alarms as required by 4.1, complying with Section 4.28.4
No alarm requirement applies inside dwelling units, since the building system covers them
A working doorbell with a flashing light connected to it, and nothing else
Answer: b. Section 4.34.2(10) requires that emergency alarms required by 4.1 and complying with 4.28.4 be provided in the dwelling unit.
9. Under Section 4.34.4 consumer information, what must an owner or occupant be told about a unit built for adaptability rather than immediate full accessibility?
Only the manufacturer's warranty information for kitchen appliances
The unit's original construction cost
Nothing; adaptable units carry no notification requirement
That the dwelling unit is equipped to have a visual emergency alarm installed, among other adaptable features
Answer: d. Section 4.34.4 item (3) requires notifying the owner or occupant that the unit is equipped to have a visual emergency alarm installed, and item (5) for the responsible party requires instructions for installing it.
10. A GCHS-managed new-construction HUD multifamily project has 100 total dwelling units. Under 24 CFR 8.22(b), how many units must be accessible for persons with mobility impairments, and how many additionally for persons with hearing or vision impairments?
5 units for mobility impairments, plus 2 more units for hearing or vision impairments
2 units for mobility impairments, plus 5 more for hearing or vision impairments
7 units total, with no distinction between the two groups
10 units for mobility impairments only; hearing and vision impairments are not separately scoped
Answer: a. Five percent of 100 units is 5 units for mobility impairments, and an additional 2 percent, 2 units, must be accessible for hearing or vision impairments, a separate count under 8.22(b).
11. Under 24 CFR 8.22(b), what is the minimum number of units required for hearing or vision impairments even on a very small project?
None; the 2 percent figure has no floor
5 units regardless of project size
Not less than one unit
Only required on projects of 500 units or more
Answer: c. Section 8.22(b) requires an additional 2 percent of units, but not less than one unit, for persons with hearing or vision impairments, even where 2 percent of a small unit count rounds below one.
12. Under 24 CFR 8.22(c), can HUD require more accessible units than the 5 percent and 2 percent figures in paragraph (b)?
Only if the project is federally owned; HUD may never raise the figures for a federally assisted project
Only for projects outside the United States, where HUD sets separate percentages by country
No, 8.22(b) sets an absolute ceiling that can never be exceeded
Yes, HUD may set a higher percentage or number where census or other current data show a need
Answer: d. Section 8.22(c) lets HUD require a higher percentage or number than 8.22(b), based on a request from an affected recipient or a state or local government supported by census or other current data.
13. GCHS is retrofitting an older shelter's sleeping rooms and cannot economically wire every room into a central alarm system. Does 4.28.4 allow another option?
Yes, a standard 110-volt receptacle for a visual alarm is acceptable, with instructions provided
No, a hardwired connection to the building system is the only compliant option in any accessible sleeping room
No, UFAS does not apply to shelters, so no alarm option is required at all
Yes, but only if the resident supplies their own alarm with no GCHS involvement
Answer: a. Section 4.28.4 explicitly allows a standard 110-volt receptacle in place of a hardwired connection, as long as instructions for use are provided.
14. A GCHS field inspector finds a unit sign mounted on the hinge side of a door, 70 inches above the floor. Does this satisfy Section 4.30.6?
Yes, because 70 inches is within an acceptable range for tall doorways
No, but only because of the height; hinge-side mounting is always acceptable under Section 4.30.6
Yes, height and side do not matter as long as a sign is present at the door
No; it must be on the latch side, 54 in. to 66 in. up, and this sign fails both
Answer: d. Section 4.30.6 requires latch-side mounting between 54 in and 66 in above the floor; this sign is on the wrong side and above the height band, failing on both counts.
Glossary
Audible alarm
An emergency alarm sound that must exceed ambient sound by 15 dB, or a 30-second maximum by 5 dB, whichever is greater, capped at 120 dB, under Section 4.28.2.
Visual alarm
A flashing emergency alarm device, capped at under 5 Hz, required in conjunction with an audible alarm under Section 4.28.3.
Auxiliary alarm
The visual alarm or 110-volt receptacle required in an accessible sleeping accommodation under Section 4.28.4.
Latch side
The side of a door opposite the hinges, where required room signage must be mounted under Section 4.30.6.
Raised character
Tactile lettering raised at least 1/32 in, 5/8 in to 2 in high, required under Section 4.30.4 for signs read by touch.
International Symbol of Accessibility
The standardized accessibility symbol that Section 4.30.5 requires on accessible facilities identified under Section 4.1, displayed as shown in Figure 43.
Consumer information
The notifications and instructions required under Section 4.34.4 telling an occupant or contractor how a unit's adaptable features, including a visual alarm, are installed or activated.
Two percent hearing/vision units
The additional 2 percent of units (not less than one) that 24 CFR 8.22(b) requires be accessible for persons with hearing or vision impairments, separate from the 5 percent mobility figure.