UFAS 4.34 & 4.27
This lesson goes inside the accessible dwelling unit: kitchens and bathrooms, under UFAS Section 4.34, and the controls and operating mechanisms running through every room, under Section 4.27. Where Lesson 7 covered how many units need to be accessible, this lesson covers what "accessible" looks like with a tape measure: counter heights, clear floor space, knee space, reach ranges, and how much force a resident should need on a faucet handle or a thermostat dial.
Section 4.34.3 gives a project two routes to the same destination: accessible dwelling units may be designed for either permanent accessibility or adaptability. A permanently accessible unit is built with every required feature, fixed counter heights included, from day one. An adaptable unit is built on an accessible route with the structural blocking, plumbing rough-in, and clearances already in place, but with certain features, most often kitchen and bathroom counter heights, designed to convert later without reconstruction. Section 4.34.4's consumer information requirements make that conversion possible: notification of alternate counter heights, adjustment instructions, and grab bar drawings all travel with the unit.
Section 4.34.5 requires at least one full bathroom in an accessible unit to meet a specific set of dimensions. The water closet must be at least 15 inches and no more than 19 inches high. Where a medicine cabinet is provided, its usable shelf must be no higher than 44 inches above the floor. An in-tub seat, or a seat at the head end of the tub, must meet the structural strength rule of Section 4.26.3 and must not slip in use. A shower stall used instead of a tub must be 36 by 36 inches or 30 by 60 inches; the 36 by 36 inch stall needs a seat 17 to 19 inches high, on the wall opposite the controls. The shower also needs a spray hose at least 60 inches long usable as a fixed head or hand-held. Grab bars themselves follow Section 4.26, but 4.34.5 tells GCHS which fixtures in the unit's required bathroom need that reinforcement built into the wall.
Section 4.34.6.1 sets the clearance between all opposing base cabinets, countertops, appliances, or walls at 40 inches minimum, rising to 60 inches minimum in a U-shaped kitchen, so a wheelchair user has room to turn between facing runs of cabinetry. At the work surface, Section 4.34.6.4 requires a clear floor space of 30 inches by 48 inches allowing a forward approach, with up to 19 inches of that space allowed to extend underneath the counter as knee space at least 30 inches wide and 19 inches deep, with counter thickness and its supporting structure no more than 2 inches over the required clear area.
At least one 30-inch section of counter must provide a work surface mounted at a maximum height of 34 inches, or built adjustable or replaceable as a unit to alternate heights of 28 inches, 32 inches, and 36 inches. The kitchen sink follows the same logic: mounted at a maximum height of 34 inches (or the same 28/32/36-inch alternate heights), in a counter area at least 30 inches wide total, with a bowl depth no greater than 6.5 inches so a seated user can reach the basin. The same 30-by-48 clear floor space and 30-by-19 knee space apply at the sink as at the work surface. For storage, Section 4.34.6.10 caps the height of at least one shelf above work counters at 48 inches, and requires wall cabinet pulls mounted close to the bottom of the door and base cabinet pulls close to the top, so a seated user does not reach past the hardware.
Section 4.34.6.6 requires range and cooktop controls to never require reaching across a burner, with knee space underneath insulated or protected against burns, abrasions, or shock; clear floor space at a range may overlap that knee space by up to 19 inches. Section 4.34.6.7 requires a side-opening oven's door latch next to open counter space, with a full-width pull-out shelf extending at least 10 inches for a hot dish. Section 4.34.6.8 requires an over-and-under refrigerator/freezer to keep at least 50 percent of the freezer space and 100 percent of the refrigerator space and controls below 54 inches; a freezer under 100 percent within reach ranges must be self-defrosting.
Section 4.27 governs every control in the unit, not just the kitchen; 4.34.6.3 simply confirms kitchen controls comply with it too. Section 4.27.2 requires clear floor space for a forward or parallel approach at controls and other operable equipment. Section 4.27.3 requires the highest operable part of a control to fall within the reach ranges of 4.2.5 and 4.2.6: forward reach tops out at 48 inches unobstructed, with a 15-inch minimum; side reach tops out at 54 inches with a 9-inch minimum. The reduced values over an obstruction are drawn in Figures 5(b) and 6(c): 44 inches for forward reach over a 20-to-25-inch obstruction, and 46 inches for side reach over an obstruction up to 24 inches deep and 34 high. The same section requires wall receptacles no less than 15 inches above the floor. Section 4.27.4 requires controls operable with one hand, without tight grasping, pinching, or twisting, capped at 5 pounds of force (5 lbf, 22.2 N). A faucet or thermostat needing a firm twist fails 4.27.4 even at a perfect height.
4.34.6.1 clearance: 40 in min., 60 in min. U-shaped. 4.34.6.4 work surface: 30 in section, 34 in max (or 28/32/36 in adjustable), clear floor 30x48 in, knee space 30x19 in, counter 2 in max thick. 4.34.6.5 sink: 34 in max height, 30 in wide, bowl 6.5 in max depth. 4.34.6.7 oven shelf: 10 in min. extension. 4.34.6.10 storage: 48 in max shelf. 4.34.5 bathroom: water closet 15-19 in, medicine cabinet shelf 44 in max, shower seat 17-19 in, stall 36x36 in or 30x60 in, hose 60 in min. 4.27.3 reach: forward 15-48 in (44 in over 20-25 in obstruction), side 9-54 in (46 in over 24 in by 34 in obstruction); receptacles 15 in min. 4.27.4 force: 5 lbf max, one hand, no tight grasping, pinching, or twisting.
Why this matters for GCHS
Kitchen and bathroom remodels are the core of GCHS's accessibility work, and these are the numbers a crew checks with a tape measure on site: is the counter section 34 inches or lower, does the sink bowl clear the 6.5-inch depth cap, is there really 30 by 48 inches of clear floor at the range, and does the faucet use a lever rather than a knob needing a hard twist. On a unit built as adaptable, GCHS also confirms the structural blocking for grab bars and the plumbing rough-in for alternate counter heights were actually left in the walls, not just promised on paper.
1. Under Section 4.34.3, what are the two design approaches for an accessible dwelling unit?
2. Under Section 4.34.5, what is the required height range for a water closet in the unit's required bathroom?
3. Under Section 4.34.5, what are the two acceptable shower stall sizes?
4. Under Section 4.34.6.1, what clearance is required between opposing base cabinets, countertops, appliances, or walls in a kitchen, and how does a U-shaped kitchen differ?
5. Under Section 4.34.6.4, what height must at least one 30-inch section of kitchen counter provide, and what alternative does UFAS allow?
6. Under Section 4.34.6.5, what is the maximum bowl depth for a kitchen sink in an accessible unit?
7. Under Section 4.34.6.10, what is the maximum height for at least one shelf of cabinets or shelving mounted above kitchen work counters?
8. Under Section 4.34.6.7, what is required of a side-opening oven's pull-out shelf?
9. Under Section 4.34.6.8, what percentage of freezer space and refrigerator space must fall below 54 inches in an over-and-under refrigerator/freezer?
10. Under Section 4.27.3, what is the unobstructed maximum high forward reach, and how does it change over an obstruction 20 to 25 inches deep?
11. Under Section 4.27.3, at what minimum height must electrical and communications receptacles on walls be mounted?
12. Under Section 4.27.4, what force and grip requirements apply to a control or operating mechanism?
13. A GCHS crew installs a new kitchen with a 34-inch-high, 30-inch counter section, correct clearances, and a 30-by-48-inch clear floor space at the sink, but the faucet is a round knob that needs a firm twist to turn on. Does this kitchen comply?
14. A HUD-funded unit is being built as adaptable rather than permanently accessible, with the counter designed to convert later to a lower height. What must be documented under Section 4.34.4 before the unit is considered complete?